Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Storm Drain and Culvert Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract calls for the installation of approximately 728 linear feet of 18-inch Reinforced Concrete Pipe (RCP) to support storm drainage infrastructure. The work is classified under NAICS code 237110, indicating it falls within the sewer and water infrastructure construction sector, and is structured as a subcontract opportunity issued by the Ware County Board of Commissioners in Georgia. The solicitation was posted on July 2, 2026, with a firm deadline for responses set for August 6, 2026, at 4:00 PM. All work must be performed at the designated location within Ware County, though specific city or address details are not provided. The project is part of a broader effort to enhance stormwater management and drainage systems in the area, with bidders expected to meet technical specifications for RCP installation, including alignment, bedding, backfilling, and compliance with local and state construction standards. Interested parties must submit proposals prior to the deadline to be considered for award.

General Info

Install 728 linear feet of 18-inch RCP for storm drainage in Ware County, Georgia, by August 6, 2026.

Agency

Georgia → Ware County Board of CommisionersView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Ware County Board of Commisioners
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Ware County Board of Commisioners
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install approximately 728 linear feet of 18-inch Reinforced Concrete Pipe (RCP) for storm drainage.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Corydon Well Replacement Project
Solicitation # 20260728051
The Corydon Well Replacement Project involves the decommissioning and replacement of the existing Corydon Well with new infrastructure to integrate it into the EVMWD Backbasin Groundwater Blending and Treatment Schematic. The project will connect to existing pipelines used for groundwater blending and will prepare for future upgrades, including dual-purpose flush-to-waste discharge and raw water supply lines, as well as the addition of PFAS treatment capabilities at the Backbasin Groundwater Treatment Plant. The integration is designed to enhance system reliability and water quality by linking the Corydon Well with other nearby wells including Cereal 1, 3, 4, Diamond, and Summerly, ensuring seamless operation within the broader regional water supply network. This effort is part of a planned design and construction phase scheduled between 2026 and 2028. The solicitation for this project, identified as 20260728051, was posted on July 29, 2026, with a response deadline of September 1, 2026. It falls under NAICS code 237110 for Water and Sewer Line and Related Structures Construction and is managed by the Eastern Municipal Water District in California. The work is to be performed in Lake Elsinore, with a zip code of 92530, and is classified under state, local, or educational government agency procurement. Bidders must respond through the official BidAmerica portal, and while no set-aside preferences are indicated, the project requires contractors with expertise in groundwater infrastructure, pipeline integration, and advanced water treatment system planning.
EVMWD

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Town of Cairo - Water System Improvement Project
Solicitation # W911WN26BA011
The U.S. Army Corps of Engineers Pittsburgh District is undertaking significant water system improvements in the Town of Cairo, West Virginia, aiming to modernize aging infrastructure across three primary areas: water distribution lines, meter settings, and a storage tank. The project involves installing roughly 5,600 linear feet of 6-inch water line, 450 feet of 4-inch line, and 1,750 feet of 2-inch line, along with 22 gate valves, 18 line tie-ins, 11 new fire hydrants, and the removal of 13 existing hydrants. Road restoration totaling 8,250 linear feet will accompany these upgrades, encompassing HMA, gravel, and concrete surfaces within and outside state rights-of-way. Additionally, approximately 6,800 linear feet of polyethylene service tubing, sized from 3/4-inch to 2-inch, will be installed with 195 new meter settings and 188 customer reconnections, while 119 existing service saddles are to be repaired or replaced. The water storage tank will be drained, inspected, cleaned, repaired, disinfected, and refilled to ensure safe and reliable supply. All work must comply with USACE Construction Quality Management standards, and the contractor is fully responsible for supplying materials and properly disposing or recycling all removed components at licensed facilities. The contract is valued between one and five million dollars and will be awarded as a Firm-Fixed-Price agreement through full and open competition. Bids must be submitted via the Procurement Integrated Enterprise Environment (PIEE) following the issuance of the Invitation for Bid on or about July 17, 2026, with a deadline of September 8, 2026. Companies must be actively registered in the System for Award Management (SAM) and possess the Proposal Manager role in PIEE to submit a bid; registration in both systems can take at least ten business days and must remain active through award and performance. The project falls under NAICS Code 237110 with a small business size standard of $45 million. The place of performance is Cairo, West Virginia, with the contracting office located in Pittsburgh, Pennsylvania. All interested parties are encouraged to participate, and no hardcopies of solicitation documents will be provided. The primary point of contact for inquiries is Aaron Barr, with secondary support from Leanna Lesefka, both reachable through official U.S. Army Corps of
W072 Endist Pittsburgh

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
SLED
Burke Street Water Main Replacement and Roadway Reconstruction Project (CIP No. 50140)
Solicitation # PR-RFP-055
The City of Pico Rivera is soliciting bids for the Burke Street Water Main Replacement and Roadway Reconstruction Project, identified as CIP No. 50140, under solicitation number PR-RFP-055. The project involves replacing aging water mains along Burke Street and reconstructing the associated roadway infrastructure to improve public utilities and transportation conditions. The bid submission deadline is set for September 1, 2026, at 2:00 PM Pacific Time, with proposals required to be submitted through the designated third-party portal. All interested vendors must access the official bid documents via the provided link, as critical details, addenda, and specifications are not included in this posting and may only be obtained through the external site. Bidders are responsible for ensuring they review all available updates and complete any necessary registrations to access full documentation. The project is localized to Pico Rivera, California, with a zip code of 90660, and is being managed by the City of Pico Rivera under its local procurement authority. The contracting officer for this solicitation is listed with contact information, though all inquiries regarding content, accuracy, or missing details must be directed to the originating agency. The posting explicitly states that Biddingo.com is not responsible for the content of the external website or any inaccuracies in the bid abstract, and parties are advised to proceed with caution and due diligence. Vendors are reminded that this opportunity requires direct engagement with the third-party portal for document access, compliance verification, and submission, and failure to obtain the latest addenda could jeopardize bid eligibility.
City of Pico Rivera

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle through its Aviation Project Management Group is forecasting the restoration of a 1947 water main located beneath the North Bound Airport Expressway using cured in place pipe technology, commonly known as CIPP. This project follows a Design-Bid-Build procurement process, indicating that design will be completed prior to competitive bidding and construction. The goal is to preserve the integrity of the aging infrastructure without disruptive excavation, leveraging trenchless technology to rehabilitate the pipe from within. The work will be performed at the specified location along the expressway, and all activities must comply with applicable standards for water main rehabilitation and public safety. The contracting entity is the Port of Seattle, with Moraa Omwega listed as the primary point of contact for inquiries and Ray Moreno serving as the project manager. The North American Industry Classification System code 237110 classifies this as a water and sewer line and related structures construction project. There is no set-aside designation provided, meaning the contract is open to all qualified contractors regardless of business size or ownership type. The forecast was posted on July 29, 2026, and bidders are expected to prepare for solicitation issuance, with full details available through the provided portal link. Proposals will be evaluated on technical merit, compliance with specifications, and cost-effectiveness, with an emphasis on minimal disruption to airport operations and surrounding infrastructure.
Aviation Project Management Group

POSTED

about 23 hours ago

DEADLINE

N/A
View Details

More opportunities from Georgia → Ware County Board of Commisioners

Same awarding agency

NAICS: 622110
SLED
Backdoor Service for Disabled ResidentsThe contract titled Backdoor Service for Disabled Residents requires the provision of no-cost garbage collection services for individuals with disabilities who are unable to move waste containers to the curb. This service demands trained personnel capable of safely and respectfully assisting residents by collecting garbage directly from their homes, including navigating potentially challenging residential environments. The contractor must ensure all vehicles are equipped with the proper mechanical or manual loading systems to accommodate this hands-on service, maintaining compliance with accessibility standards and safeguarding the dignity of those served. The contract is classified as a subcontract under NAICS code 622110, indicating a connection to healthcare and social assistance services, though the nature of the work is municipal waste management. It is issued by the Ware County Board of Commissioners in Georgia with a posted date of July 1, 2026, and a response deadline of August 4, 2026. While no set-aside provisions or point of contact details are specified, the performance location is understood to be within Ware County. The service is intended to fulfill an essential public need by ensuring equitable waste collection access for disabled residents, requiring operational reliability, staff sensitivity, and consistent adherence to service protocols.
General Medical and Surgical Hospitals

POSTED

28 days ago

DEADLINE

in 6 days
View Details