This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
General Info
Agency
NAICS
Place of Performance
Caserma Miotto, Longare, Vicenza, Italy, AE, 36023Set-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
10 August 2026 (Amendment 0001): The purpose of this amendment is as summarized on page 2, Summary of Changes of Amendment 0001. The changes include 1. Provide additional Government Point of Contact (POC) which resulted in the following updated sections and attachment: RFP Section 1.2.1. Government POC & RFP Attachment: B08-W912PF26RA011_ATT C_PPQ_AMD01, 2. Revise the Corporate Experience (Factor 2.1) in response to industry feedback received during pre-proposal inquiries (PPI) received. Specifically, Section 4.2.1.1.1(e) from five (5) years to eight (8) years & Sections 4.2.1.1.1(a) and 4.2.1.2. to clarify Secondary Attribute experience does NOT need to be demonstrated within a project meeting the size and core sewer/basin scope relevancy requirements to be credited. 3. Provide Government responses to Pre-Proposal Inquiries (PPI) #1 – 14, and 4. Distribute the following attachments: Revised RFP Attachment (B08-W912PF26RA011_ATT C_PPQ_AMD01), Site Visit Details (B08-W912PF26RA011_ATT E_SITE VISIT_ROUTE, B08-W912PF26RA011_ATT F_SITE VISIT_PHOTOS, B08-W912PF26RA011_ATT G_SITE VISIT_ATTENDANCE_Redacted) and Section 01 00 00 ATTACHMENTS (B08-W912PF26RA011_ATT06_THIRD_PARTY_AGENCY_DOCS and B08-W912PF26RA011_ATT07_PPI LOG_20260810).
29 July 2026 (Initial RFP Posting): This Design-Bid-Build construction project aims to provide repairs to the failed stormwater and sanitary sewer systems at the Miotto Military Installation to achieve environmental compliance and prevent future flood damage. The core of this project involves repairing, upsizing, and decoupling the cross-connected sewer systems to ensure proper independent discharge and full compliance with environmental regulations. The scope of work involves complete construction, repair, and site remediation. Key elements of construction include: repairing, extending, and upsizing the failed stormwater system piping to meet technical capacity standards; remediating site conditions associated with recent storm events, specifically repairing severe flooding, soil erosion, and landslide vulnerabilities; and separating the cross-connected sanitary and storm lines. The project also includes constructing a new direct connection to the Bisatto River via an underground TOC pipe utilizing existing perpetual rights-of-way and executed land-use licenses; installing a mandated stormwater lamination tank beneath a municipal sports field as required by local Italian regulations (Genio Civile); restoring the impacted municipal training field with a new synthetic turf surface directly over the completed lamination tank; and integrating naturalistic design features (such as sedimentation tanks, retention ponds, and weir walls) to effectively reduce stormwater velocity prior to discharge from the installation. The requirement also includes options for asbestos pipe removals, reinstallation of the sports field, landslide area repairs, and sedimentation pond installation. This solicitation is being advertised as Unrestricted for full and open competition. This source selection procurement requires both non-price (technical, experience, and past performance) and price proposals and will utilize the best value continuum tradeoff process at Revolutionary Federal Acquisition Regulation Overhaul (RFO) 15.103-1. The basis for evaluation and evaluation factors for award is included in the solicitation.