Storm Drain Modification and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Storm Drain Modification and Installation involves performing critical infrastructure work for prime contractors on City of Dinuba safety projects. The scope of work includes modifying existing storm drain systems, installing new drainage structures, connecting to current systems, removing inlets, abandoning laterals, and adjusting manholes to grade. Specific technical requirements include the construction of City Standard and Caltrans Type G5 CIP drainage inlets and the installation of 48 inch storm drain manholes, with a mandatory requirement for coordination with Underground Service Alert. The project is categorized under NAICS code 237110 and is associated with the City of Dinuba in California. Interested parties must submit their responses by the deadline of November 4, 2026. The primary objective of the contract is the delivery of fully functional storm drain connections that meet all specified municipal and state standards.

General Info

Storm drain modification and installation for City of Dinuba projects due November 4, 2026.

Documents

This scope was carved out of ITB-2026-0004.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

HSIP Cycle 11 Safety Improvements Project Phases 1, 2, and 3

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Dinuba
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Dinuba
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs modifications to existing storm drain systems and installs new drainage structures for prime contractors on City of Dinuba safety projects. Connects to existing systems, removes inlets, abandons laterals, and adjusts manholes to grade. Constructs City Standard and Caltrans Type G5 CIP drainage inlets and installs 48" storm drain manholes. Requires coordination with Underground Service Alert (USA). Delivers functional storm drain connections.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station, including the installation of pumps, a generator, odor control equipment, and new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding MWBE documentation and the submission of Good Faith Efforts forms. Bids are due by November 12, 2026. The project requires the successful bidder to provide performance and payment bonds, as well as proof of insurance. Performance is monitored by Willis Engineers on behalf of the City of Belmont, and the contract stipulates liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including electrical, paving, pipe supply, and aggregate supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Bids must be submitted via email or fax to Veronica Garcia by October 28, 2026, at 2:00 PM and must remain valid for 120 days. Qualified bidders must possess a valid California contractor license and be registered with the California Department of Industrial Relations in accordance with Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance requirements. Additionally, the contractor reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 10 hours ago

DEADLINE

in 12 days
View Details

More opportunities from California → City of Dinuba

Same awarding agency

NAICS: 237310
New
SLED
HSIP Cycle 11 Safety Improvements Project Phases 1, 2, and 3
Solicitation # ITB-2026-0004
The HSIP Cycle 11 Safety Improvements Project for the City of Dinuba is a three-phase infrastructure initiative focused on concrete site improvements and pedestrian safety. Phase 1 involves constructing bulb outs at three intersections, Phase 2 includes sidewalk construction along College Avenue and El Monte Way with ADA curb ramp upgrades at Tulare Street and H Street, and Phase 3 focuses on installing rectangular rapid flashing beacons at the intersection of College Avenue and Academy Way. The project requires the contractor to provide all labor, equipment, and materials in accordance with plans prepared by 4Creeks, Inc., and adheres to strict Buy America and Build America Buy America (BABA) Act provisions. The contract will be awarded to the lowest responsive and responsible bidder. Key requirements include a bid security of at least 10 percent of the bid amount and a 100 percent labor and materials payment bond. Contractors must maintain general, automobile, and employer liability insurance of 1 million dollars per occurrence or accident. Compliance with prevailing wage laws, ADA requirements, and specific technical standards for lighting and pavement markings is mandatory. Performance is subject to the approval of the City Engineer, and the performance bond must remain in effect for 365 days following final acceptance of the work.
Highway, Street, and Bridge Construction

POSTED

about 21 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS