Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Eatonton, Georgia, involves the installation of reinforced concrete pipe and various drainage structures for sanitary sewer and storm drain projects. The scope of work includes the installation of 1,832 linear feet of 18 inch RCP, along with 24, 36, and 48 inch RCP, and the placement of 31 drainage structures such as manholes and curb, ditch, and grate inlets. The contractor is also responsible for managing 10 utility service conflicts to ensure the delivery of a fully installed and tested storm drainage system. The project falls under NAICS code 237110 and requires strict compliance with the Build America, Buy America Act. Interested parties must adhere to the response deadline of December 2, 2026. This effort supports prime contractors in completing critical infrastructure improvements within the city.

General Info

Installation of concrete pipes and drainage structures for Eatonton, Georgia by December 2026.

Documents

This scope was carved out of 25p-x-117-2-6787.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025 CDBG- No. 25p-x-117-2-6787

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Eatonton
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Eatonton
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs reinforced concrete pipe (RCP) and drainage structures for prime contractors on City of Eatonton, Georgia sanitary sewer and storm drain projects. Installs 1,832 LF of 18” RCP, plus 24”, 36”, and 48” RCP, and 31 drainage structures including curb, ditch, grate inlets, and manholes. Manages 10 utility service conflicts. BABA Act compliance required. Delivers a fully installed and tested storm drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Specialized services required for the project include traffic control, SWPPP, construction survey, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for outreach and coordination are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains. Key construction elements include the creation of a new Mountain Avenue Lift Station with a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, FRP enclosures, fire suppression, piping, valves, and electrical and instrumentation. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. Filanc has indicated a willingness to assist qualified small business subcontractors with bonding, insurance, credit lines, and materials to facilitate project participation.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 1 hour
View Details

More opportunities from Georgia → City of Eatonton

Same awarding agency

NAICS: 237110
New
SLED
2025 CDBG- No. 25p-x-117-2-6787
Solicitation # 25p-x-117-2-6787
The City of Eatonton, Georgia, is soliciting bids for solicitation number 25p-x-117-2-6787, titled 2025 CDBG: Sanitary Sewer System and Storm Drain Improvements. The project involves extensive storm drain infrastructure work, including the installation of approximately 1,832 linear feet of 18-inch RCP pipe, along with smaller quantities of 24, 36, and 48-inch RCP pipes. The scope also includes 31 new storm drainage structures, 6 yard inlets, 2 conflict/junction boxes, and 6,548 linear feet of concrete curb and gutter. Additional requirements encompass 398 square yards of driveway replacement, 512 square yards of Class A concrete replacement, and significant asphalt restoration using 309 tons of recycled asphalt concrete leveling and 600 tons of 9.5mm Superpave asphalt. The contractor will also be responsible for striping, erosion control, grading, clearing, and traffic control. All work must be completed within 180 consecutive calendar days from the notice to proceed. Bids must be sealed and submitted to Eatonton City Hall by December 2, 2026, at 11:00 am local time. This is a Section 3 Covered Contract under the HUD Act of 1968, and the City is committed to Affirmatively Further Fair Housing. The project requires strict compliance with the Build America, Buy America (BABA) Act and applicable HUD notices. Bidders must provide a bidder's bond not exceeding 5% or $20 per set damages, as well as required payment and performance bonds. Detailed plans and specifications are available through Hofstadter and Associates, Inc. in Macon, Georgia.
Water and Sewer Line and Related Structures Construction

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS