Storm Drain Study Cantonment Area Phase 2
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract titled Storm Drain Study Cantonment Area Phase 2 under solicitation number FA461026QSDSP2 is a total small business set-aside for the provision of comprehensive storm drain system services at Vandenberg Space Force Base in California. The contractor must deliver all necessary management, labor, tools, equipment, and materials to perform cleaning, CCTV video inspection, and GIS survey of the storm drain infrastructure within 365 days of award. Work must comply with industry and government standards including NASSCO PACP guidelines, UFGS TV inspection protocols, and base CAD standards, while adhering to strict security protocols due to the military installation environment. Background checks, access controls, and environmental compliance are mandatory, with particular attention to protecting the endangered Vernal Pool Fairy Shrimp through biological monitoring. All material and sludge disposals must be coordinated with the 30CES/CEI Waste Compliance office, and personnel must be prepared for potential unexploded ordnance encounters during field operations. RFI questions are due no later than July 30, 2026, at 1400 PDT, and quotes must be submitted by August 11, 2026, at 1400 PDT. The contract is issued by the Department of Defense through the 30CES/CEI office in California, with primary point of contact Chase French and secondary point of contact Kristofer Clark available for inquiries.
General Info
Agency
NAICS
Place of Performance
CA, 93437, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
RFI Questions due NLT 30 July 2026 by 1400 PDT.
Quotes due NLT 11 August 2026 by 1400 PDT.
The requirement is for a contractor to provide all management, labor, tools, equipment, and materials necessary to perform a comprehensive cleaning, CCTV video inspection, and GIS survey of the storm drain system at Vandenberg Space Force Base, California, within 365 days of contract award. This follow-on effort is critical to assessing infrastructure condition, ensuring continuous operational integrity, and preventing system failures that could cause flooding or environmental damage. Work must be executed in accordance with prevailing industry and government standards, including NASSCO Pipeline Assessment Certification Program guidelines, UFGS TV inspection specifications, and base CAD standards. Due to the active military installation setting, the contractor must strictly adhere to security access controls, background checks, and environmental compliance protocols, including biological monitoring for the protected Vernal Pool Fairy Shrimp. Additionally, the contractor must coordinate all material and sludge disposal with the 30CES/CEI Waste Compliance office and remain prepared for potential unexploded ordnance (UXO) monitoring during field operations. See PWS for additional information.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → FA4610 30 Cons Pk
Same awarding agency
