Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Storm Drainage and Culvert Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → AirportView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-18.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

(BID) 27-18, Atlanta Speedway Airport – Hangar Site Development

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Airport
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Airport
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs underground storm drain pipes and trench drains for prime contractors on Henry County/FAA airport projects. Installs pipe for storm drains and culverts per Item D-701 and slotted/trench drains per Item D-702 using concrete/HDPE pipes and bedding material. Requires GDOT Pre-qualification. Delivers a functional storm drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 7 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Georgia → Airport

Same awarding agency

NAICS: 238910
New
SLED
(BID) 27-18, Atlanta Speedway Airport – Hangar Site Development
Solicitation # 27-18
Henry County is soliciting bids for the Atlanta Speedway Airport Hangar Site Development project, with a submission deadline of October 8, 2026, at 3:00 PM. The scope of work involves comprehensive site preparation and infrastructure installation, including earthwork, clearing and grubbing, reinforced concrete and asphalt paving, and the installation of water mains, fire hydrant assemblies, and PVC sewer pipes. The project also includes stormwater management through oil-grit separators and erosion control measures. All work must comply with FAA and GDOT standards, and the contract will be awarded to the lowest responsive and responsible bidder, with a preference given to local vendors within five percent of the low bid. Eligible bidders must be pre-qualified with the Georgia Department of Transportation and registered with SAM.gov. The contract requires strict adherence to the FAA Buy American Preference and Davis-Bacon wage requirements. Performance is expected to commence within seven days of the Notice to Proceed, with a designated contract time of 180 days for the T-hangars and box hangars sitework. Required submissions include a bid bond, certifications regarding debarment and foreign participation, and evidence of competency. The project will be overseen by a Resident Project Representative who will manage quality assurance sampling and testing to ensure compliance with ASTM standards for concrete strength, density, and surface smoothness.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS