Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Storm Sewer Installation

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Town of St. Marys involves the complete installation of storm services for prime contractors on municipal projects. The scope of work includes excavation, backfilling, and compacting for valve chambers, catch basins, ditch inlets, and maintenance holes, ensuring all activities comply with OPSS.MUNI 402, 407, 490, and 517 standards. The contractor is responsible for utilizing storm service pipes, end caps, main line service tees, and dewatering equipment to deliver a fully installed and tested storm sewer system. The project is categorized under NAICS code 237990 and was posted on September 3, 2026. Interested parties must submit their responses by the deadline of September 25, 2026, at 6:30 PM.

General Info

Subcontract for Town of St. Marys storm service installation; deadline September 25, 2026.

Agency

Town of St. MarysView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

This scope was carved out of PW-35-2026-RFT.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Church St. N Storm Sewer Servicing

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTown of St. Marys
ContactsNo contacts available
OfficeN/A
Organization / Agency
Town of St. Marys
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs complete installation of storm services for prime contractors on Town of St. Marys municipal projects. Executes excavation, backfilling, and compacting for maintenance holes, catch basins, ditch inlets, and valve chambers per OPSS.MUNI 402, 407, 490, and 517. Utilizes storm service pipes, main line service tees, end caps, and dewatering equipment. Delivers a fully installed and tested storm sewer system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
This solicitation is for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii, issued by the U.S. Army Corps of Engineers Honolulu District as a sealed bid, firm-fixed-price procurement. The work is being pursued with small business subcontracting and supply participation in mind, and the solicitation is set aside for HUBZone small business concerns under SBA authority. The project is valued in an estimated range of $1,000,000 to $5,000,000, with bids due by September 30, 2026, and performance expected to begin upon notice to proceed. The contract calls for a 200-calendar-day delivery/performance period, uses three CLINs covering mobilization/demobilization, dredging and ocean disposal of 4,260 cubic yards, and revetted mole repair, and requires bidders to submit on all line items. The place of performance is the harbor site in Hawaii, with dredged material to be disposed of at an approved offshore site south of Oahu. Submission is in hard copy only; electronic bid submission is not permitted, and sealed envelopes must be properly marked. Bidder questions are to be submitted through ProjNet by the stated deadline, with a designated bidder inquiry key provided. A bid guarantee is required, and the contractor must also furnish performance and payment bonds. The project scope combines maintenance dredging with repair of the revetted mole, including clearing and grubbing, vegetation and root removal, stone rework, filling voids with additional stone, environmental controls, water quality protections, and disposal of dredged material. The drawings and specifications reference detailed site plans, cross sections, survey data from 2024, contractor notification and preservation obligations, and specific dredging methods. Technical requirements include pre- and post-dredge surveys by a qualified third-party surveyor using multi-beam hydrographic methods, acceptance based on median depth sorting on a 3-foot by 3-foot grid, and strict inspection criteria for stone quality and construction compliance. The contractor must submit an operations plan and schedule within 30 days of notice to proceed, maintain a quality control program with preparatory, initial, and follow-up phases, and provide key personnel including a project manager, project superintendent, QC manager, and site safety and health officer with supporting resumes and letters of direction. The solicitation incorporates Davis-Bacon wage requirements, public safety and traffic controls, cybersecurity during construction, CUI/NDA obligations for certain data, and specific compliance clauses covering liquid
Healy Tibbitts Builders, Inc.

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation # 36C78626R0058
The Department of Veterans Affairs National Cemetery Administration is seeking a Firm Fixed Price contract for Facility Condition Assessment deficiencies corrections and repairs at Camp Nelson National Cemetery in Nicholasville, Kentucky. This project is 100 percent set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 237990. The scope of work includes general construction to address deficiencies at the main cemetery entrance, flagpole, retention pond, maintenance yard facilities, spoils area, and expansion additions. Additional bid alternates include historic cemetery wall restoration, the construction of a new 1,200 square foot materials storage building, and identification layer replacement. The magnitude of construction for this project is estimated to be more than 10 million dollars. The anticipated period of performance is 360 calendar days following the issuance of the Notice to Proceed. The contractor will be required to provide all management, labor, materials, and equipment, and must furnish a bid bond as well as performance and payment bonds upon award. Quality standards require that restoration work conform to the original existing construction, and the contractor must provide a minimum one-year warranty for materials and workmanship. The solicitation is expected to be issued around August 3, 2026, with a response deadline of September 17, 2026.
National Cemetery Administration (36C786)

POSTED

about 17 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
Federal
Z--ALPO STABILIZATION OF STAPLE BEND TUNNEL
Solicitation # 140P4226R0026
The National Park Service at Allegheny Portage Railroad National Historical Site is preparing to solicit a contractor for the stabilization of the historic Staple Bend Tunnel near Mineral Point, Pennsylvania, with the solicitation expected to be issued on or after August 20, 2026. This procurement is structured as a firm fixed price contract under Simplified Acquisition Procedures for Commercial Products and Services, limited exclusively to small businesses with a NAICS code of 237990 and a size standard of $45 million. The primary scope includes comprehensive tunnel stabilization activities such as rock bolt inspection and installation, scaling of loose rock, fossil identification and preservation by a qualified paleontologist, void fill concrete injection, gunite application with wire mesh, drainage system installation, and signpost construction. Optional items, contingent on funding, include a 3D tunnel scan and installation of bat houses. The work is expected to last approximately 190 days after notice to proceed, with mobilization not anticipated before October 1, 2026, pending approval of submittals. All proposals must be submitted electronically through SAM.gov, and contractors must be actively registered in the System for Award Management to be eligible. Evaluation will follow the Lowest Price Technically Acceptable method, and compliance with biobased product requirements under federal law is mandatory. No responses to this pre-solicitation are accepted, and all future amendments, specifications, and drawings will be published exclusively via SAM.gov.
Nps Conops Strategic DOI

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Assunpink Creek Site 8 Dam Rehab – NRCS-New Jersey
Solicitation # 12FPC326Q0056
Solicitation 12FPC326Q0056 is a Request for Quotation issued by the USDA NRCS-NJ office for the rehabilitation of the Assunpink Creek Watershed Dam Site 8 in Hamilton Township, Mercer County, New Jersey. The primary objective is to rehabilitate the dam to meet or exceed state and federal dam safety criteria while maintaining existing flood protection levels. This is a Total Small Business Set-Aside under NAICS code 237990, with an updated size standard of 45 million dollars. The project scope includes site preparation, clearing and grubbing, structure removal, earthfill operations, the installation of drainage piping, and the use of roller compacted concrete. Work must be completed within 180 days after the notice to proceed is issued. The government will award the contract based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, ability to meet the schedule, and past performance regarding dam construction and roller compacted concrete installation. Quotations are due by September 21, 2026, at 1:00 PM ET, with a site visit having been scheduled for September 17, 2026. The contract is subject to the Davis-Bacon Act and requires the use of the Treasury's Invoice Processing Platform for monthly electronic invoicing. Key deliverables include a Temporary Traffic Control Plan due within 15 days of award and a detailed excavation plan submitted 30 days prior to the start of excavation.
Fpac Bus Cntr-Acq Division

POSTED

about 17 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
SLED
Livingston Rec-Plex Project
Solicitation # SPDR 2025-05
The City of Livingston plans to amend its General Plan land use designation and rezone three city-owned parcels totaling approximately 2.05 acres from Limited Industrial to Public Facility to facilitate the development of a new Recreation Complex known as the Livingston Rec-Plex. This change will transition the zoning classification from M-1, Limited Industrial to P-F, Public or Quasi-public Facilities, enabling the construction of community recreational facilities on city land. The project also involves the proposed closure of a segment of Seventh Street between C and D Streets and a portion of the alley public right-of-way between Sixth and Seventh Streets, eliminating vehicular access to accommodate the expanded facility footprint and enhance pedestrian safety and usability. These adjustments are intended to support improved public access to recreational services and align land use with community needs. The initiative is being managed by the City of Livingston in California, with Miguel Galvez serving as the primary point of contact as City Planner. The project was posted as a forecast on June 10, 2026, and the anticipated location for development is within the city limits of Livingston, specifically in the 95334 zip code area. No solicitation number or NAICS code has been assigned at this stage, indicating the project is in the early planning and approval phase, focused on securing necessary land use and zoning changes before moving forward with design and construction. Public right-of-way modifications are integral to the project's success, requiring coordinated planning with municipal infrastructure and transportation departments to ensure compliance with local regulations and community standards.
City of Livingston

POSTED

about 22 hours ago

DEADLINE

N/A
View Details

More opportunities from Town of St. Marys

Same awarding agency

NAICS: 237310
New
International
Parking Lot and Driveway Improvements
Solicitation # PW-09-2026-RFT
The Town of St. Marys Department of Public Works has issued a Request for Tender (PW-09-2026-RFT) for the supply and installation of approximately 610 tonnes of hot mix asphalt (HMA) at several locations, including the Eric Taylor Trail Parking Lot, Jones Street E. Parking Lot, and Museum Driveway. The project scope involves paving using HL8 binder and HL3 top coat mix designs, with some sites requiring asphalt removal, gravel grading, and base preparation. A potential expansion of the Eric Taylor Trail parking area to the west is also included as a provisional item, contingent upon permit approval. All work is scheduled to be completed by November 30, 2026, with tender results expected to be presented to the council for award on October 13, 2026. Bidders must submit one original hard copy of their tender in a sealed, opaque envelope by the deadline of September 30, 2026, at 2:30:59 p.m. local time. Submissions must include a Form of Tender with lump sum or unit prices, bidder information, three references from similar work performed within the last five years, and a mandatory Domestic Supply Chain Plan with a signed commitment attestation. Financial security requirements include a bid security equal to 10% of the total tender price, and upon award, the successful bidder must provide performance and labour and material payment bonds totaling 100% of the contract price. The Town will evaluate submissions based on compliance, related experience, and past performance, noting that the lowest price may not be the sole factor in the award decision. Additionally, the successful contractor must maintain specific insurance limits, including $2,000,000 per occurrence for commercial general liability and $5,000,000 for automobile liability, while adhering to all provincial health, safety, and accessibility regulations.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237110
International
Church St. N Storm Sewer Servicing
Solicitation # PW-35-2026-RFT
The Town of St. Marys has issued Request for Tender PW-35-2026-RFT for the installation of storm sewer servicing on Church Street North. The project involves the complete supply of labor, equipment, and materials for storm service piping, including HDPE for directional drilling or PVC SDR-28 for open-cut installations, and the installation of service cleanouts. All work must adhere to Ontario Provincial Standard Specifications, specifically OPSS.MUNI 401, 410, 501, 517, and 805. Key deliverables include the installed infrastructure and required testing reports, such as CCTV inspections and mandrel deflection testing. The contract must be completed in its entirety by November 30, 2026. Bidders must submit their proposals by 2:30 p.m. on September 25, 2026, including a bid bond equal to 10% of the total bid price, a Mandatory Domestic Supply Chain Plan, and a health and safety compliance form. Awarding is not strictly based on the lowest price, as the Town reserves the right to evaluate bidder competency. The successful contractor must provide both performance and labor and material payment bonds equal to the contract value. Payment is processed monthly via email invoices, with a specific amendment requiring a Gantt chart construction schedule for contracts exceeding 1,000,000 dollars. Detailed claims must be submitted within 30 calendar days of the completion of the affected work.
Water and Sewer Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS