Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on April 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Sewer Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. Bids must be submitted using the EJCDC C-410 Bid Form and must include a bid bond. The successful contractor will be required to provide performance and payment bonds and proof of insurance. Performance is governed by EJCDC standard general and supplementary conditions, with substantial completion determined through joint inspections by the owner, contractor, and engineer. Payment is processed monthly via applications for payment, with funds becoming due 30 days after presentation to the City of Belmont.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Requested services and supplies specifically include lead abatement, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and bypass pumping. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, ahead of the project bid date on November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract involves the installation of storm sewer lines utilizing 24-inch and 30-inch reinforced concrete pipes (RCP), covering lengths of 320 linear feet and 200 linear feet respectively. The scope includes all associated excavation activities such as trenching, as well as preparation and restoration tasks like bedding and backfilling of the sewer lines. This work is classified under NAICS Code 237110, indicating that it falls within the scope of water and sewer line construction. Issued by the Engineering Services Division in Georgia, the subcontract opportunity was posted on April 16, 2026, with a response deadline set for May 20, 2026. No specific details regarding set-aside types or organization classifications are provided, and location details remain unspecified. Interested parties can find more information or submit responses through the provided procurement portal.

General Info

Install 24-inch and 30-inch RCP storm sewer lines with excavation, bedding, and backfilling.

Documents

This scope was carved out of IFB26-037.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NORTH GLYNN RECREATION SIDEWALK PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Engineering Services Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 24-inch and 30-inch RCP (Reinforced Concrete Pipe) storm sewer lines (320 LF and 200 LF respectively), including trenching, bedding, and backfill.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS