Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from General Services Administration was posted on January 24, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

STORM WATER MANAGEMENT POND RECONSTRUCTION

Closed
GS-03P-13-QN-C-0028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 13 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$93,540

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

NEEDY ROAD BUILDING 244 NEEDY ROAD, MARTINSBURG, WV, 25405, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R3 Charleston Field Office
Contacts2 people available
OfficeCHARLESTON, WV, 25301, USA
Office AddressCHARLESTON, WV, 25301, USA

Full Description

Show more
Page 1 of 3 JANUARY 16, 2013 SCOPE OFWORK STORM WATER MANAGEMENT POND IMPROVEMENTS 244 NEEDY ROAD MARTINSBURG,WV 25405 I. SCOPE OF WORK CONTRACTOR WILL PROVIDE THE NECESSARY SUPERVISION, LABOR, EQUIPMENT, MATERIALS, AND PERMITS FOR THE STORM WATER MANAGEMENT POND IMPROVEMENTS. THE POND IMPROVEMENTS PROJECT IS LOCATED AT THE ATF FACILITY LOCATED AT 244 NEEDY ROAD, MARTINSBURG, WV 25405. A. PROVIDE ALL NECESSARY PERMITS PRIOR TO MOBILIZING TO THE JOBSITE. B. PROVIDE A PROJECT CPM SCHEDULE PRIOR TO MOBILIZATION. C. REMOVE FENCE AND INSTALL TEMPORARY GATE. D. CLEAN EXISTING 15" CMP UNDER ROAD, APPX. 30 LNFT. E. INSTALL RIP RAP AT EXISTING 15" CMP - 2 TONS. F. EXCAVATE THE POND FOR PLUMBING. G. INSTALL DIRT AND SEDIMENT BAGS TO PUMP THROUGH TO COLLECT THE SEDIMENT. H. CLEAR AND GRUB POND'S PERIMENTER. I. FURNISH AND INSTALL APPROPRIATE STORM WATER MANAGEMENT POND STRUCTURE WITH DEBRIS RACK. J. REGRADE SLOPES FOR BERMS AND DAMS. K. INSTALL RIP RAP AT THE 3 EXISTING PARKING LOT DRAINS, APPX. 300 LNFT. L. SEED AND MULCH TO STABILIZE ENTIRE SITE. M. REINSTALLATION OF THE SECURITY FENCE. N. THE SERVICEWILL CONSIST OF PUMPING, DEWATERING, REMOVAL AND DISPOSAL OF SLUDGE, TREE BRANCHES, LEAVES, SHRUBS AND ALL OTHER DEBRIS ASSOCIATED WITH THIS OPERATION. O. THE CONTRACTOR WILL PROVIDE POLYMER, CONVEYERS, TRACTORS, TRAILERS, BOXES, AND ANY OTHER EQUIPMENT NECESSARY FOR THE OPERATION AND DISPOSAL. P. THE ESTIMATED DURATION FOR THIS SERVICE IS 45 DAYS; HOWEVER IT MAY GO LONGER DUE TO UNFORESEEN CONDITIONS OR INCLAMENT WEATHER. Page 2 of 3 JANUARY 16, 2013 Q. THIS OPERATION WILL BE DONE DURING REGULAR HOURS; UNLESS OTHERWISE COORDINATED WITH THE GOVERNMENT. P. THE SUCCESSFUL BIDDER MUST DISPOSE OF ALL SLUDGE, TREE BRANCHES, LEAVES, SHRUBS, AND ALL OTHER DEBRIS ASSOCIATED WITH THIS OPERATION. Q. TRANSPORTATION AND COSTS TO BE BORN BY THE CONTRACTOR. R. LANDFILL TIPPING FEES TO BE BORN BY THE CONTRACTOR. II. EACH BIDDER SHALL PROVIDE: A. ITEMIZED COST BREAKDOWN. 1. PERMITTING 2. MOBILIZATION / DEMOBILIZATION 3. REMOVAL FENCE / TEMPORARY GATE 4. DEWATER POND 5. CLEAR & GRUB POND PERIMETER 6. DREDGE POND & REMOVE EXCESS 7. INSTALL SWM POND STRUCTUREWITH DEBRIS RACK 8. REGRADE SLOPES, BERMS, AND DAMS 9. RIP-RAP DITCH 10. SEED. MULCH, AND STABILIZE SITE III. GENERAL: A. EACH BIDDER IS ALLOWED TO INSPECT THE JOB SITE PRIOR TO BIDDING. BIDDER SHOULD VERIFY ABILITY TO LOCATE EQUIPMENT. B. THE BIDDER SHALL SUBMIT REFERENCE DATA ON THE PROPOSAL FORM OF THREE PROJECTS MINIMUM, OF SIMILAR COMPLEXITY, TYPE, AND COMPARABLE VALUE. C. ALL ONSITE LABOR AND SUPERVISION SHALL BE OF U.S. CITIZENSHIP. D. FAILURE TO PROVIDE ALL REQUIRED INFORMATION OR LACK OF A FAVORABLE REFERENCE MAY BE GROUNDS FOR REJECTION OF BID. IV. SAFETY: A. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS SAFETY PRACTICES, RULES AND INDUSTRIAL GUIDELINES SHALL BE CONSIDERED PART OF THESE SPECIFICATIONS, AND SHALL BE ADHERED TO BY ALL. THE WORK MAY INVOLVE EXPOSURE TO POTENTIALLY BIOLOGICALLY HAZARDOUS SUBSTANCES AND APPROPRIATE PROTECTIVE CLOTHING AND GLOVES SHOULD BEWORN. B. THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO FULLY COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS, INCLUDINGWVDEP PERMITTING REQUIREMENTS. Page 3 of 3 JANUARY 16, 2013 IV. POINTS OF CONTACT: FOR QUESTIONS RELATING TO THIS REQUEST FOR PROPOSAL, PLEASE CONTACT: GLENVILLE CATROW PROPERTY MANAGER PHONE: 304-262-5698 FAX: 304-267-0471 CELL: 304-590-0926 EMAIL: glenville.catrow@gsa.gov ***THERE WILL BE A MANDATORY PRE CONSTRUCTION MEETING HELD ON TUESDAY, FEBRUARY 19, 2013 AT 10:00 A.M.***

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS