Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Templeton Community Services DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Templeton, CA, 93465, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260916049.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Evers Sports Park Improvement Project – Phase 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Templeton Community Services District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Templeton Community Services District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs stormwater piping and drains for prime contractors on Templeton Community Services District park projects. Installs stormwater conveyance piping and stormwater drains, including Filterra Bioretention Systems. Delivers an installed storm drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, an influent flow meter vault, updated pump systems, and the replacement of several surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline, two soil cement lined dewatering ponds, a new emergency generator pad, and a CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as grading, piping, and asphalt resurfacing. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes, including general building and specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary inquiries and submissions should be directed to Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves, including 54-inch and 132-inch diameter valves and tie-ins ranging from 54 to 145.5 inches. Additional structural requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope further encompasses electrical upgrades, instrumentation and controls, piping systems, and specialized civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details

More opportunities from California → Templeton Community Services District

Same awarding agency

NAICS: 238910
New
SLED
Evers Sports Park Improvement Project – Phase 1
Solicitation # 20260916049
The Evers Sports Park Improvement Project – Phase 1 is a public works construction solicitation issued by the Templeton Community Services District in Templeton, California. The project scope encompasses comprehensive site improvements, including site clearing, grading, retaining walls, paving, landscaping, and the installation of stormwater systems. Infrastructure enhancements are a primary focus, specifically involving the construction of sidewalks, ramps, walkways, and parking lot improvements designed to ensure ADA compliance. Technical requirements for the project include detailed irrigation methods, hydrozone charts, and specific standards for site metal fabrications. All work must adhere to the Project Geotechnical Report by Converse Consultants, Caltrans Standard Specifications, and the California Building Code. Bidders must submit sealed proposals to the Templeton Community Services District office by 4:00 PM local time on October 22, 2026. To be considered responsible and responsive, contractors must hold valid licenses from the California Contractors State License Board and be registered with the Department of Industrial Relations to perform public work. The solicitation requires a 10 percent bid bond, and the successful bidder must provide both a payment bond and a faithful performance bond for the full contract amount. Additionally, the project is subject to prevailing wage requirements, workers' compensation certification, and specific safety standards such as ANSI Z133. Once a Notice to Proceed is issued, the contractor is required to commence work within fifteen days.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS