Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Stormwater Utility Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W2SD Endist New YorkView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

NY

Set-Aside

NONE

Documents

This scope was carved out of W912DS26BA025.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W2SD Endist New York
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs stormwater management systems for prime contractors on US Army Corps of Engineers projects in Bridgewater Township, NJ. Performs installation of stormwater utilities and associated drainage structures using stormwater pipes and drainage components. Delivers a functional stormwater utility system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The contract encompasses electrical upgrades, instrumentation and controls, piping systems, and civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, managed by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. Support is available for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and the use of apprentices is encouraged.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

NAICS: 237990
New
Federal
FINDERNE FARMS WETLAND MITIGATION SITE, BRIDGEWATER, NJ
Solicitation # W912DS26BA025
Solicitation W912DS26BA025 is a firm fixed price construction project issued by the Department of Defense, W2SD Endist New York, for adaptive management measures and culvert replacement at the Finderne Farms Wetland Mitigation Site in Bridgewater, New Jersey. The scope of work includes mobilization, soil erosion and sediment control, landscaping, deer-exclusion fencing, and the replacement of a broken concrete pipe culvert with a 15-inch RCP culvert. The project is estimated to have a magnitude between 25 million and 100 million dollars, with a performance period of 1,014 calendar days from the notice to proceed. The contract is open for full and open competition with a 10 percent price evaluation preference for HUBZone small business concerns. The award will be granted to the responsible and responsive bidder offering the lowest total price for the basic work and options. Bidders must submit their proposals in Adobe PDF format via the PIEE website by the final response deadline of September 9, 2026. Key requirements include the provision of bid, performance, and payment bonds, compliance with the Davis-Bacon Act, and the hosting of a formal partnering session within 35 days of award. The project must adhere to New Jersey Department of Environmental Protection permits and Somerset-Union Soil Conservation District approved erosion control plans. Quality control is mandatory, with final acceptance based on a series of punch-out, pre-final, and final inspections.
Other Heavy and Civil Engineering Construction

POSTED

about 22 hours ago

DEADLINE

in 4 days
View Details