Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Iowa was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Straw Wattle Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract seeks the installation of biodegradable straw wattles along slopes and drainage pathways to mitigate erosion and capture sediment from runoff, targeting environmental stabilization in Floyd County. The work involves precise placement of these natural fiber barriers to filter contaminants and reduce soil displacement, aligning with best practices in land stewardship and erosion control. The solicitation is structured as a subcontract under NAICS code 238990, with a response deadline of August 26, 2026, and was posted on August 4, 2026, under the Iowa division of the Agriculture and Land Stewardship agency. All work must be performed within the specified location, and contractors are expected to meet technical standards for material durability, installation technique, and environmental compliance without formal set-aside designations.

General Info

Install biodegradable straw wattles in Floyd County to control erosion and capture sediment by August 26, 2026.

Place of Performance

Floyd County, IA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-07.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-07 Floe971628B (Floyd)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Placement of biodegradable straw wattles along slopes and drainage paths to control erosion and filter sediment-laden runoff.

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237110
SLED
26-13 Wor982210D (Worth)
Solicitation # 26-13
The Wor982210D Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of East and West wetland systems in Worth County, Iowa. The scope of work includes selective clearing, excavation of approximately 7,500 cubic yards of earthwork, installation of 700 linear feet of pipe, and the placement of 129 tons of riprap. Key infrastructure deliverables include three solar pump systems, two modified SW-512 intake concrete structures, three modified SW-513 outlet concrete structures, and two modified SW-401 and 402 lift station concrete structures, concluding with 2.5 acres of seeding. The estimated construction cost is between $225,000 and $325,000. The contract will be awarded to the lowest responsible bidder, with a bid submission deadline of November 12, 2026. Performance requirements include a 10% bid bond and a performance/payment bond equal to 100% of the contract price, which must remain in place for one year following final acceptance. All work except seeding must be completed by September 1, 2027, with all seeding finalized by December 15, 2027. Project administration includes a 3% retainage on progress payments and requires strict adherence to OSHA safety standards and NRCS specifications. Final acceptance is contingent upon a written certification from the engineer, Bolton & Menk, and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS