Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stream Bank Improvements and Erosion Control

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of RFB 27-54218.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB 27-54218 Burruss Park Bridge Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom RFB 27-54218 Burruss Park Bridge Construction
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Marietta
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → City of Marietta
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs improvements to the stream bank and site preparation for prime contractors on City of Marietta bridge projects. Executes excavation for culvert removal, grading, and stabilization of the stream bank using rip-rap or geotextiles to prevent erosion. Requires heavy machinery including excavators and loaders. Valid Contractor’s License required. Delivers a stabilized stream bank and cleared site for bridge installation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2027-05 CAT Plant Riverside Ferry Dock
Solicitation # 2027-05
The Chatham Area Transit Authority is soliciting proposals for the design and build of the Plant Riverside Ferry Dock and Shelter in Georgia. The project scope includes the construction of a 20 ft. by 120 ft. concrete floating dock, a 6 ft. by 80 ft. ADA-compliant aluminum gangway, a 15 ft. by 20 ft. concrete platform, solar-powered lighting, and a passenger landing shelter on the existing Riverwalk. The contractor is responsible for all permitting, except for the U.S. Army Corps of Engineers permit, and must ensure the dock system can withstand continuous 1.5-foot waves. Technical specifications require concrete with a minimum 28-day compressive strength of 4000 psi and galvanized welded wire fabric reinforcement. The site is accessible only by foot or river, and strict delivery restrictions apply regarding adjacent hotel and park areas. The contract is anticipated to span three years, with a project timeline of approximately 18 months. Award selection is based on a combination of experience and performance (50 points), approach and methodology (40 points), and cost (10 points). Bidders must provide a base bid for the dock, platform, and gangway, and an alternate bid for the shelter. Compliance with the Build America Buy America requirements, the Davis-Bacon Act, and the Copeland Anti-Kickback Act is mandatory. Proposals must be submitted by December 11, 2026, and must include a technical proposal and a separately sealed cost proposal, along with required certifications for DBE, lobbying, and government-wide debarment.
Chatham Area Transit Authority

POSTED

about 3 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
International
Diving Services
Solicitation # 26-220
The City of Delta is seeking a commercial diving company to provide turn-key diving services for the inspection, cleaning, repair, and maintenance of underwater infrastructure on an as-and-when-requested basis. The scope of work includes the maintenance of pump stations, culverts, flood boxes, irrigation and drainage control structures, and irrigation water intake systems, with a requirement for condition reporting via CCTV and occasional engineered design drawings. The contractor must provide all necessary personnel, equipment, and surface supports, and must be capable of responding to emergency requests within two to three hours. The contract runs from the date of award until December 31, 2027, with the option for the City to renew for four additional one-year periods, ending no later than December 31, 2031. The maximum annual liability for fees and disbursements is set at 20,000 dollars plus GST. Proposals must be submitted via a single email in PDF format to [email hidden] by December 8, 2026, at 2:00 PM Pacific time. Evaluation is based on the best value, with a heavy emphasis on price and the ability to meet specific scenario costs, such as the cleaning of the Tasker Pump Station intake screen. The selected contractor will act as the Prime Contractor and must comply with WorkSafeBC, the Diver Certification Board of Canada, and Transport Canada regulations. Payment is processed via Electronic Funds Transfer 28 days after the receipt of a detailed invoice or the satisfactory delivery of services. Award decisions may be influenced by a risk assessment of the proponent's financial resources and work history to ensure the City is not exposed to material risk.
City of Delta

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details

More opportunities from Georgia → City of Marietta

Same awarding agency

NAICS: 237310
New
SLED
RFB 27-54218 Burruss Park Bridge Construction
Solicitation # RFB 27-54218
The City of Marietta is soliciting bids for the Burruss Park Bridge Construction project, RFB 27-54218, to replace an existing triple 42-inch culvert drain under the Burriss Park main trail with a 60-foot prefabricated, vehicular rated bridge. The scope of work includes the removal of existing culverts, headwalls, trail surfaces, and trees, as well as the construction of bridge abutments and stream bank improvements. While the city will furnish the bridge to the site, the general contractor is responsible for installation and coordination. The project excludes roadway paving and improvements, with a required completion timeline of 90 calendar days and a 12-month guarantee period following final acceptance. The contract will be awarded to the lowest responsive and responsible bidder based on a single lump-sum base bid. Bidders must submit proposals electronically via BidNetDirect.com by December 4, 2026, including a bid bond or certified check of at least 5 percent of the bid. Successful bidders must provide a performance bond for 100 percent of the contract value and a labor and material payment bond for 110 percent. Mandatory requirements include compliance with the Georgia Security and Immigration Compliance Act, the submission of a Contractor Affidavit and Agreement, and adherence to Georgia DOT and Marietta Power and Water System specifications. Payment is issued 30 days after completion and acceptance of the work.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236220
SLED
Design Build for Dumpster Enclosure @ 90 Hansell Street
Solicitation # RFP-27-54174
The City of Marietta is soliciting proposals for a design-build project to construct a dumpster enclosure at 90 Hansell Street, Georgia. The project involves the demolition of existing asphalt, concrete curbs, and brick paving to install a new concrete slab, footings, and entry approach ramps. The enclosure must accommodate up to nine 8-yard front-load dumpsters and be constructed using concrete masonry units with a brick facade and split face block to align with the architecture of Marietta Square. Bidders are required to provide two separate quotes based on dimensions of 13'W x 60'L x 10'H and 13'W x 54'L x 10'H. The contractor is responsible for all permits and must employ a licensed architect to stamp the design, using the existing enclosure at 25 Winter Street as the quality and design standard. The anticipated construction start date is January 4, 2027, with a required completion timeframe of 90 days from the notice to proceed. Proposals will be evaluated based on overall project cost (30%), project duration and timeline (20%), concept renderings (20%), previous experience (15%), and references (15). Submission requirements include a conceptual sketch, proof of valid occupational and contractor licenses, and a bid bond or cashier's check for 5% of the total bid amount. Upon award, the contractor must provide performance and payment bonds for the full contract amount. All work must comply with OSHA, EPA, and Georgia state regulations, and the City of Marietta must be named as an additional insured on all insurance policies.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS