Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Public Works- Roads was posted on May 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Streambed and Road Restoration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

1 day ago

DEADLINE

in 11 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

1 day ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The Streambed and Road Restoration subcontract, issued by Public Works- Roads, focuses on environmental and infrastructure recovery following construction activities. The primary scope of work involves restoring natural streambed morphology and reconstructing the roadway approach, which includes essential tasks such as grading, installing base rock, and completing surface restoration. This opportunity was posted on May 7, 2025, with a response deadline of May 29, 2025. Classified under NAICS code 237990, the project seeks qualified subcontractors to execute these specialized restoration services to ensure the site is returned to its required natural and functional state.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of CMP 1610.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Van Ornum Crk at Bunker Crk Rd. (MP 2.681) Barrier Removal Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPublic Works- Roads
ContactsNo contacts available
OfficeN/A
Organization / AgencyPublic Works- Roads
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Restore natural streambed morphology post-construction and reconstruct the roadway approach, including grading, base rock, and surface restoration.

More opportunities from Public Works- Roads

Same awarding agency

NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Jones Road MP 1.71 Culvert Replacement Project
Solicitation # 90-21F171900171
The Jones Road MP 1.71 Culvert Replacement Project is a public works initiative managed by the Board of County Commissioners of Lewis County, Washington. The primary scope of work involves improving Jones Road at milepost 1.71 by replacing an existing culvert with a 38-foot long by 33-foot wide pre-stressed slab girder bridge featuring steel pipe abutments. The project also includes related infrastructure improvements such as shoulder finishing, the application of 195 tons of HMA, the installation of beam guardrails, and the implementation of erosion and water pollution control measures. All construction must adhere to the 2021 International Building and Residential Codes, the Washington State Energy Code, the Lewis County Master Site Plan, and WSDOT and City of Centralia standards. Proposals must be submitted by 12:15 p.m. on December 3, 2026, to the Public Works Contract Team in Chehalis, WA. Required submission documents include a bid bond, a non-collusion declaration, certification of wage law compliance, a local agency subcontractor list, and company UBI and UEI numbers. The contract mandates strict quality controls, including hydrostatic pressure testing of pipes at 25 PSI and compaction of backfill to 95 percent density. Payments are to be made via certified check to the Lewis County Treasurer, and the Lewis County Engineer serves as the primary authority for contract alterations.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS