Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Structural Concrete and Bridge Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Structural Concrete and Bridge Work involves performing specialized concrete services for wildlife crossings and intersection improvements on Lee County Board of County Commissioners projects. The scope of work includes the execution of formwork, rebar installation, and the pouring of high-strength concrete using pumps, all in strict accordance with Final Structure Plans. To qualify, contractors must hold FDOT Certification in the relevant structural concrete work classes to ensure the delivery of compliant road supports and crossing components. The opportunity is managed by Lee County, Florida, under NAICS code 238110. It was posted on September 4, 2026, with a response deadline of October 6, 2026. Interested parties must coordinate with prime contractors to provide these essential structural components for the county's infrastructure improvements.

General Info

Lee County subcontract for FDOT-certified structural concrete and bridge work by October 6.

Agency

Florida → Lee CountyView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of B260313LND.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Alico Road Widening Phase 1-A

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Lee County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Lee County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural concrete work for wildlife crossings and intersection improvements for prime contractors on Lee County Board of County Commissioners projects. Executes formwork, rebar installation, and pouring of high-strength concrete per Final Structure Plans using concrete pumps. Requires FDOT Certification in structural concrete work classes. Delivers completed structural components for crossings and road supports.

Similar Contracts

Same NAICS industry code

More opportunities from Florida → Lee County

Same awarding agency

NAICS: 237990
SLED
Boca Grande 5th St. Access Reconstruction - Hurricane Milton - FEMA
Solicitation # B260358KLB
Lee County, Florida, is soliciting bids for the reconstruction and improvement of the beach access facility located at 505 5th Street West, Boca Grande, Florida. This project, identified as solicitation B260358KLB, involves the demolition of existing facilities and the construction of a new accessible beach access system, including a prefabricated aluminum truss ADA ramp, foundation and support systems, and the reconstruction of adjacent parking and pedestrian areas. Additional requirements include site grading, drainage improvements, erosion and sediment control, pavement markings, signage, and final restoration. Because the project is funded in part or in whole by the Federal Emergency Management Agency (FEMA), all prime and subcontractors must be active in the System for Award Management (SAM.gov) and comply with Federal Grant Requirements under 2 CFR part 200. Eligible bidders must hold a Certified General Contractor license and be registered to practice in the State of Florida. Required submission documents include a completed bid schedule, a bid bond, and various certifications regarding E-Verify, background screening, and foreign ownership. Bids must be submitted by October 13, 2026, at 2:30 PM ET via the Ion Wave portal or hand-delivered to the Procurement Management Director in Fort Myers.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 25 days
View Details
NAICS: 237310
SLED
Alico Road Widening Phase 1-A
Solicitation # B260313LND
Lee County, Florida, is soliciting bids for the Alico Road Widening Phase 1-A project, identified as solicitation B260313LND. Funded in part or whole by the Florida Department of Transportation under Project 457161-1-54-01, the project involves construction services for roadway improvements in Fort Myers. The scope of work includes the construction of two wildlife crossings, the realignment of the Green Meadow Road and Alico Road intersection into a conventional T-intersection, and various clearing, grading, and drainage improvements to support future widening. Bids must be submitted by October 6, 2026, at 2:30 PM ET via the Ion Wave portal or hand-delivered to the Procurement Management Division. To be considered, bidders must be FDOT Certified in the required work classes, either as a prime contractor, subcontractor, or a combination of both. The selection process involves a public opening of sealed bids, with a strong emphasis on responsiveness; submissions with blank forms, modified bid schedules, or corrupted documents may be disqualified. Required documentation is extensive and includes a bid bond, a completed bid schedule in Excel format, and various compliance affidavits such as E-Verify registration, Public Entity Crime forms, and FDOT certifications regarding lobbying and debarment. The contractor is responsible for providing all necessary labor, materials, and equipment in accordance with the technical specifications and project plans. Invoicing is handled through the Lee County Clerk of Court.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS