Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Studios Energy South Chiller Expansion

Closed
ITB # C007094State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 10 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The contract encompasses the expansion of the Studios Energy South Chiller Plant located at 397 Cypress Drive in Lake Buena Vista, Florida, with a comprehensive scope that includes the installation of new owner-furnished equipment such as chillers, chilled and condenser water pumps, cooling tower systems, and all associated piping, appurtenances, and controls. A new concrete cooling tower basin and separate pump pit will be constructed, with the cooling tower itself to be field-erected by the manufacturer TEI under the contractor’s coordination. An underground 24-inch equalizer pipe will link the new and existing basins, integrating with prior infrastructure. The project also involves full electrical system upgrades including lighting and lightning protection, a dedicated fire protection branch connected to the existing dry valve system, new make-up water and overflow drain systems, and waterproofing of the cooling tower basin. Site modifications include removing and relocating an existing yard drain, demolishing and reconstructing perimeter sidewalks along the east and south sides of the cooling tower yard, and adjusting the surrounding fenceline. The award will go to the lowest responsible bidder across all line items, with a required 5 percent bid bond. The solicitation number is ITB # C007094, posted on May 27, 2026, with bids due by June 26, 2026, under the NAICS code 237990, managed by the Utilities Services Department of the Central Florida Tourism Oversight District.

General Info

Expand chiller plant in Florida with new chillers, cooling tower, piping, electrical, and site modifications, owner-furnished equipment.

Place of Performance

5300 N Center Drive, Lake Buena Vista , FL - Bolt Conference Room., CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Utilities Services Department of Central Florida Tourism Oversight District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.
The construction site is located at 397 Cypress Drive – Lake Buena Vista, FL 32830.
SCOPE OVERVIEW: A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls; B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls; C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project; D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls; E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area; F. New make-up water and overflow drain systems at new cooling tower; G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system; H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed; I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline; J. Waterproofing of new cooling tower basin.
Notes: Basis of award is the low bidder of the total of all line items.
Bid Bond: 5.00%

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS