Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Georgia was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Subfloor Preparation and Surface Conditioning

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the preparation of subfloors, specifically focusing on leveling layers up to 3/8 inch, priming cement surfaces, and ensuring the area is clean prior to the installation of flooring. This work is essential for creating an optimal base to support the subsequent flooring installation and to ensure the durability and quality of the finished floors. The subcontract is issued by the Fayette County Board of Education in Georgia, under the NAICS code 238390 which relates to building finishing contractors. Key deadlines include the posting date of May 29, 2026, and a response deadline set for June 10, 2026, at 2:00 PM. The contract is a subcontract opportunity, although details such as specific location, point of contact, or set-aside status are not provided. The project emphasizes the importance of proper subfloor conditioning to meet professional standards for flooring installations in educational facilities.

General Info

Subfloor leveling, priming, and cleaning for flooring installation; subcontract by Fayette County Board of Education.

Documents

This scope was carved out of PE-65615-NONST-2026-000000108.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Flooring Projects for Fayette County Public Schools (RFQ 26-033-075)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Fayette County Board of Education
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Preparation of subfloors including leveling (layers ≤3/8”), priming cement surfaces, and ensuring cleanliness prior to flooring installation.

More opportunities from Georgia → Fayette County Board of Education

Same awarding agency

NAICS: 336120
New
SLED
School Buses for Transportation (RFP 27-005-076)
Solicitation # PE-65615-NONST-2027-000000115
The Fayette County Board of Education is seeking a qualified contractor to establish a multiyear contract for the procurement of student transportation school buses. The scope includes the supply of 72-passenger general-use buses and 48- to 54-passenger special-needs buses, with an anticipated volume of approximately 15 buses per year over a five-year period. The initial contract term runs through June 30, 2027, with options to renew for up to five additional terms. Annual orders are expected in late fall or early winter, with a required delivery deadline before the last week of school in May. All deliveries must be made to the Goza Road Operations Center in Fayetteville, Georgia. Award selection is based on a 100-point weighted system evaluating proposal quality (40%), qualifications and experience (30%), and price and cost (30%). Technical requirements include a minimum three-year bumper-to-bumper warranty for both chassis and body, compliance with Georgia child check system specifications, and specific hardware such as Valeo Smart Hatches and remote-control heated mirrors. Contractors must provide a certificate of insurance, an IRS W-9 form, and manufacturer certifications verifying that all materials meet the minimum specifications. Proposals must be submitted as a single PDF document by December 3, 2026, and must adhere to ADA and Section 508 accessibility standards.
Heavy Duty Truck Manufacturing

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS