Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on November 1, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Submersible Pumps

Closed
W912ES24Q0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333914
New
DIBBS
LUBRICANT PACKER, BEARI
Solicitation # SPE8EE-27-T-0265
Solicitation SPE8EE-27-T-0265 is a fixed-price request for quotations issued by the DLA Troop Support Construction and Equipment Manufacturing and Construction office for the procurement of 14 units of Lubricant Packer, Bearing (NSN 4930-00-052-1764). The requirement falls under NAICS code 333914 and is managed under the First Destination Transportation program with shipping terms set as FOB Origin. Delivery is required within 167 days after the order, with a need ship date of April 26, 2027, and a destination of DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to technical and quality standards, including MIL-STD-130N for identification and MIL-STD-129 for shipment marking. Packaging must comply with MIL-STD-2073-1E and DLA requirement RP001, with specific instructions to apply P-19 preservative to exterior bare ferrous metal surfaces. Invoicing and receiving reports must be processed electronically through the Wide Area WorkFlow system. Evaluation of offers requires a complete data package, and the government will not consider items produced via additive manufacturing. Additionally, the procurement incorporates various DFARS and FAR clauses regarding cybersecurity, the Buy American Act, and HUBZone price evaluation preferences. Quotations must be submitted via the DIBBS portal by November 9, 2026.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 18 hours ago

DEADLINE

in 11 days
NAICS: 333914
New
DIBBS
SLEEVE, SHAFT, PUMP
Solicitation # SPE7M0-26-T-9435
Solicitation SPE7M0-26-T-9435 is a request for quotations issued by the Department of Defense, specifically the DLA Land and Maritime Maritime Supply Chain ESOC Buys, for the procurement of one pump shaft sleeve identified by NSN 4320-01-123-0197. The requirement specifies a delivery timeline of five days after the order is placed, with the destination and acceptance point located at W8VP NJ ARNG CSMS 1 in Manchester, New Jersey. The procurement is categorized under NAICS code 333914 and includes specific approved part numbers from Curtiss-Wright Electro-Mechanical. The contract mandates strict adherence to packaging and marking standards, requiring compliance with ASTM D3951 and MIL-STD-129, while noting that the DLA Master List of Technical and Quality Requirements takes precedence over ASTM standards. Palletization must follow RP001 requirements. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including the Buy American and Balance of Payments Program, safeguarding of covered defense information under DFARS 252.204-7012, and prohibitions on the acquisition of certain telecommunications equipment. Evaluation for award will consider the HUBZone price evaluation preference, and offers utilizing additive manufacturing are ineligible unless specifically authorized.
MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 18 hours ago

DEADLINE

in 4 days

General Info

NAICS

333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing

Place of Performance

Hastings, MN, 55033, USA

Set-Aside

SBA

Documents

1

Solicitation W912ES24Q0015 - Submersible Pumping Equipment

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
SUBMERSIBLE PUMPING EQUIPMENT PART 1 GENERAL 1.1.1 SCOPE: This section covers the requirements to supply three (3) electric, portable, submersible, trash type pumps for the dewatering work at Lock and Dam 2. 1.2 APPLICABLE PUBLICATIONS: The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of this section to the extent referenced: 1.2.1 American Society for Testing and Materials (ASTM): A27 (2020) Steel Castings, Carbon, for General Application. A 36 (2019) Structural Steel. A 48 (2021) Gray Iron Castings. A 276 (2017) Stainless and Heat-Resisting Steel Bars and Shapes. A 285 (2017) Pressure Vessel Plates, Carbon Steel, Low and Intermediate Tensile Strength. A 516 (2015) Pressure Vessel Plates, Carbon Steel, for Moderate and Lower Temperature Service. A 564 (2019) Hot-Rolled and Cold-Finished Age-Hardening Stainless and Heat- Resisting Steel Bars and Shapes. A 576 (2017) Steel Bars, Carbon, Hot Rolled, Special Quality. A 668 (2020) Steel Forgings, Carbon and Alloy, for General Industrial Use. B 148 (2018) Aluminum-Bronze Sand Castings. B 584 (2014) Copper Alloy Sand Castings for General Applications. 1.2.4 National Fire Protection Association (NFPA): No. 70 (2020) National Electrical Code (NEC). 1.3 SUBMITTALS: Government approval is required for the following submittals: 1.3.1 Shop Drawings including catalog cuts and manufacturer's data, shall be submitted for approval. Shop drawings shall be neat, legible, and of sufficient size to be easily read and/or reproduced. The following items shall be submitted: a) Outline drawings of proposed pumps showing all pertinent dimensions and weight of the various components of the pumps. A listing of previous pumps produced, and their installation locations shall be furnished. A description of the pump service facility and location shall be submitted. b) Dimensioned cross-sectional drawings of the pumps and components and motors. Motor data shall be furnished that shows dimensional data and operating speed. Wear ring system shall be indicated. Bearing system and bearing life data shall be provided. Pump shaft seal system shall be submitted. c) The proposed coating (painting) systems and procedures for the pumps and components. d) Factory certified pump capacity-head curves shall be provided with the brake horsepower (BHP) and the net positive suction head required (NPSHR) requirements presented; operating points shall be indicated. Efficiency data shall be plotted. e) Warranty. A copy of the pump warranty for each pump provided shall be submitted. f) Discharge Elbow and floor stand. Submit material and dimensional data. g) Motor controllers and starters and disconnects. 1.3.2 Installation and Erection Instructions: The Contractor shall submit five copies of a printed and bound manual describing the procedures, to be followed for erecting, assembling, and installing the pumps. The proposed manuals shall be submitted with the pump shop drawing submittals. It shall describe all special procedures and outline special precautions. It shall also include such things as bolt torque values, permissible wear ring clearances, recommended instrument set-ups, recommended gages and instruments, bearing clearances, and similar details. 1.3.3 Operation and Maintenance Manual: The Contractor shall submit, prior to delivery of any pumps, manuals containing complete information in connection with the operation, lubrication, adjustment, routine and special maintenance, disassembly, repair, and re-assembly of the pumps and accessories. A total of 5 copies shall be submitted. The manual shall also have a listing of special tools required for working on the pumps. The manual shall include complete diagnostic information on the pumps and all approved shop drawing submittals on the pumps. 1.3.3.1 Parts list: The operation and maintenance manual shall have a complete parts list for the pumps. The list shall clearly show all details and parts, and all parts shall be adequately described and have identification markings and include sources for all parts. 1.3.3.2 Manuals shall be made up with hard cover post type binders or 3-ring binders and printed on 8-1/2 x 11 paper with indexed, tabbed section dividers. Large sheets shall be neatly folded and installed with post hole reinforcements such that sheets can unfold without need to open binder posts. Drawings, sketches, and parts lists incorporated in the manual may be reduced to page size provided such reductions are clear and easily legible, otherwise they may be folded into the manual. PART 2 PRODUCTS 2.1.2 Standard Products: All pumps supplied shall be the product of a pump manufacturer who has produced at least 200 units of the same style pump required under this contract. Half of these units shall have been operating in the United States for at least five years prior to the contract award date. A record of this shall be furnished as a shop drawing. All pumps furnished under this contract shall be from the same pump manufacturer. 2.1.3 Service Availability. The pumps furnished shall be supported by a service organization. Service and parts shall be available within 300 miles of the Minneapolis, Minnesota area. This information shall be provided in a shop drawing. 2.1.5 Nameplates: Each major item of equipment shall have the manufacturer's name, address, type/style, model, serial number, and catalog number on a plate secured to the item of equipment. Nameplates shall be made of corrosion resisting metal with raised or depressed lettering on a contrasting-colored background. 2.1.6 Instruction Plates: As necessary, each item of equipment shall be equipped with suitably installed instruction plates including warnings and cautions describing special and important procedures to be followed during starting, operating, and servicing the equipment. The plates shall be made of corrosion resisting metal with raised or depressed lettering on a contrasting-colored background. 2.2 MATERIALS: 2.2.1 Materials not specifically described shall, as far as practicable, conform to the latest approved industry standard(s) covering the appropriate class or types of materials. 2.2.2 Designated items shall conform to the following: Item Requirements Cast Iron ASTM A 48, Class No. 30A, 30B and 30C Cast Steel ASTM A 27, Grade 65-35, annealed. Copper Alloy Castings ASTM B 584, Alloy No. C93700 or C86300 Structural Steel ASTM A 36 Cold Rolled Steel Bars ASTM A 108, Minimum Working Strength 65,000 pounds per square inch Hot Rolled Steel Bars ASTM A 576, Grades: G10200, G10450, G11410 Hot Rolled Stainless ASTM A 564, Grade 517400 Bars and Shapes: Steel Plates, Structural ASTM A 285, Grade B Steel Plates, Pressure ASTM A 516, Grade 55 Vessel Steel Forgings ASTM A 668, Class F 2.2.3 Discharge Elbows. Each pump shall have a pump discharge elbow furnished. The elbow shall be a flanged, 90 long radius, 8-inch discharge. 2.2.4 Stands. Each trash pump shall come equipped with a stand capable of supporting the pump and discharge elbow. The stand must allow the pump assembly to be positioned flat on the lock floor. Floor stand size shall be minimized to extent possible to save space. These pumps will be installed by the Government next to other pumps in a sump area of the lock. 2.3 ELECTRIC SUBMERSIBLE PUMPS: 2.3.1 Portable Trash Pump Requirements. The Contractor shall supply a portable trash pump. The pumps shall be the electric, centrifugal, submersible type with closed non-clog impellers. Pumps shall be 8-inch diameter. Each pump shall be capable of pumping solids up to 3" in diameter. Pumps shall be capable of pumping solids and suspended solids including sand and debris commonly found in river water. 2.3.2 Pump Quantities, Capacities, and Total Dynamic Head (T.D.H): Pump Quantity, capacities, and required pumping head as follows: Quantity Pump Capacity Total Dynamic Head in Feet of Water (T.D.H) Three (3) 2500 gpm 40 (1) Primary condition point: Discharge not less than pump size stated against a Total Dynamic Head in Feet of Water (TDH) as stated. Pumps shall be minimum 75% overall efficient at the condition point stated above. The Net Positive Suction Head (NPSH) required by the pump, at any point throughout the range of capacities and heads against it will operate, shall not be more than the NPSH available. The NPSH available shall be computed at the site elevation for Minneapolis, Minnesota and a water temperature of 75-85 degrees Fahrenheit. 2.3.3 Speed: The speed of the pumps shall not exceed values stated below. Pumps will be rejected if speeds exceed these values. Pump Size Speed 2500 gpm 1200 RPM 2.3.4 Pump casings: Pump casings shall be made of ASTM A 48, Class 30, cast iron. The casing shall be of single piece design and shall have smooth fluid passages. 2.3.5 Nuts and bolts: All bolts used in assembling each pump and its supporting members shall be of corrosion resisting steel and shall be hexagonal type. Stainless steel cap screws conforming to ASTM A 276, Type 316, and used with silicon bronze nuts or stainless-steel nuts, will be permitted as will silicon bronze cap screws with tapped casting holes. 2.3.6 A wear ring system shall be installed to provide efficient sealing between the volute and impeller. The wear ring shall consist of a stationary ring made of bronze insert press-fitted into the volute inlet, and a rotating stainless-steel ASTM A276, Type 316 ring force-fitted into the impeller runner. 2.3.7 Impellers: Impellers shall be gray cast iron conforming to ASTM A48 Class 30, or of aluminum bronze conforming to ASTM B 148 Grade D; and non-clogging design having a long thrulet without acute turns. The impellers shall be capable of handling solids found in stormwater such as trash and fibrous materials. Impellers shall be capable of passing 3 solids. Impellers shall be capable of handling suspended solids such as sand and debris commonly found in river water. 2.3.7.1 Minor surface imperfections shall be filled and/or ground down as necessary to preserve the correct contour and outline of the impeller and restore the surface imperfections to the same degree of finish as the surrounding surfaces. Surface pits, depressions, projections, or overlaps showing greater than 1/16 of an inch variation from the general contour for that section shall be corrected. 2.3.8 Shafts and Seals: Pump and drive shaft shall be a single combined shaft. The pump shaft and drive shaft shall be of ASTM A276, Type 420 stainless steel or an alternate stainless steel, as approved, and shall be completely isolated from the pumped liquid. Carbon steel pump shafts with a stainless-steel sleeve will not be acceptable. 2.3.9 The pump shall be provided with a tandem mechanical rotating shaft seal system. Seals shall run in an oil reservoir. Lapped seal faces must be hydrodynamically lubricated at a constant rate. The lower seal unit, between the oil sump and the volute, shall contain the following: Lower Seal Unit: One stationary silicon carbide and one positively driven silicon carbide rotating ring. The upper seal unit, between the motor housing and oil sump, shall contain: Upper Seal Unit: One positively driven silicon carbide rotating ring and one stationary silicon carbide seal. Alternate seal materials will not be accepted. Positively driven means the rotating seal is driven from the shaft by virtue of a mechanical connection (i.e., set screw, clip, key, etc.). The use of an elastomeric sealing member driving the seal face by friction on the shaft surface shall not be permitted. Each seal interface shall be held in contact by its own spring system. The seals shall require neither maintenance nor adjustment but shall be easily inspected and replaceable. Shaft seals without a positively driven rotating member or conventional double mechanical seals containing a common single spring acting between the upper and lower unit shall not be accepted. Each pump shall be provided with an oil chamber for the shaft sealing system. The oil chamber shall be designed to assure that air is left in the oil chamber, to absorb the expansion of the oil due to temperature variations. The drain and inspection ports, with positive anti-leak seal, shall be easily accessible from the outside of the pump. 2.3.10 Bearings: The pump shaft shall rotate on at least two permanently lubricated bearings. The upper bearing shall be the angular contact ball type and the lower bearing shall consist of two or more rows of angular contact ball bearings. Each bearing shall have a minimum B10 bearing life (100,000 hours). The bearing life data shall be shown in a shop drawing. 2.3.11 Pump Lifting System: Each furnished pump shall be equipped with a lifting bar to facilitate handling. The lifting bars shall be manufactured of stainless steel. The bar shall be so designed and arranged to allow safe handling of the pump as required during shipping, installation, and maintenance. 2.3.12 Cooling System: Each pump unit shall have an adequately designed cooling system, consisting of a water jacket which encircles the stator housing. The water jacket shall be provided with a separate circulation of the pumped liquid. Cooling media channels and ports shall be non-clogging by virtue of their dimensions. All cooling paths or ports shall be internal to the pump and motor water jacket to preclude clogging or physical abuse. Cooling system shall be designed to allow for continuous pump operation at rated capacity with the external water level at the minimum pump submergence level. 2.3.13 Torsional Vibration and Critical Speeds: The assembled pumping unit, consisting of the motor and pump shall be free of critical speeds or harmful torsional vibrations at all speeds encountered within the operating range. 2.3.14 Painting: Pump exteriors shall be painted with a PVC epoxy primer and a chloric rubber paint or epoxy paint or manufacturer's standard paint system, as approved. 2.3.15 Electrical: Pump motors shall be squirrel-cage, induction, shell type design, housed in an air-filled watertight chamber, and NEMA Design B type. Oil filled motors will not be acceptable. The pump unit and motor unit shall be closed coupled to form a single integral unit. The stator winding and stator leads shall be insulated with moisture resistant Class F insulation which will resist a temperature of 155 oC. The stator shall be dipped and baked three times in Class F varnish. The motor shall be designed for continuous duty, capable of sustaining a minimum of ten starts per hour. The rotor bars and short circuit rings shall be made of copper or aluminum. Thermal switches shall be embedded in the stator lead coils to monitor the temperature of each phase winding. 2.3.15.1 Rating: Each motor shall be wound for 3-phase, 60 Hz, alternating current, and 480-volt operation. The motor shall be designed for operation in a 20'C ambient temperature and all temperature rises shall be above this ambient temperature. The rated horsepower of the motor shall be not less than 110 percent of the determined maximum load requirement for the full capacity-head curve of the pump. The motor shall have a service factor of 1.15. The temperature rise above the ambient temperature for the class of insulation used shall be in accordance with paragraph MG 1-12.42 of NEMA MG 1. 2.3.16 Pump cables: Each pump shall be supplied with 100' of electrical cable. Each motor cable shall be suitable for submersible pump application and such information shall be indicated by a code or legend permanently embossed on the cable. Cable sizing for pump motors shall conform to NFPA No. 70. 2.3.16.1 Cable entry: The cable entry water seal design shall preclude specific torque requirements to insure a watertight and submersible seal. Cable entry system shall be the same for both the power and control cables. The cable entry shall be comprised of a single cylindrical elastomer grommet, flanked by washers, all having a close tolerance fit against the cable outside diameter and the entry inside diameter. The assembly shall bear against a shoulder in the pump top. The cable entry junction chamber and motor shall be separated by a stator lead sealing gland or terminal board, which shall isolate the motor interior from foreign material gaining access through the pump top. The junction chamber, containing the terminal board, shall be sealed from the motor by elastomeric compression seal O-ring. Connection between the cable conductors and stator leads shall be made with threaded compressed type binding post permanently affixed to a terminal board and shall be made leak proof. 2.3.17 Alarms: The following alarm features shall be provided: a) Over temperature alarm: The motor over temperature alarm circuit shall be actuated by three thermal sensors embedded in the stator windings of the pump motor (one switch in each stator phase). The pump motor shall stop on over temperature and not restart until the over temperature alarm is manually reset and the motor temperature has cooled to the appropriate temperature. b) Overload alarm: The motor overload circuit on the pump motor shall stop the motor upon overload and not restart until the overload condition is corrected and manually reset. c) Lower seal failure alarm: Leakage sensor shall be provided in the oil chamber. The sensor shall activate an alarm when water concentration exceeds 30%. d) Stator Leakage Sensor: Sensor shall activate an alarm and stop the motor when any water is detected. 2.3.18 Pump Interface Modules. Pump supplier shall furnish any electrical interface modules necessary for the pump sensors to communicate with the control system. Interface modules shall be adaptable to any type of standard control system. Interface modules shall be match marked to each pump. 2.3.19 Float Switches. Provide each trash pump with attached float switch. Float switch shall be on-off only. 2.3.20 Motor Controllers with Disconnect Switch. The trash pump unit shall be equipped with a motor controller with integral disconnect switch. The motor controller shall include starters and be Full Voltage Non-Reversing single speed type. One controller for each pump. 2.3.21 Controller Features. Controllers shall have on/off selector switch. Switch shall be of the heavyduty, oil-tight type; rated 600 volts ac. Contacts shall be rated for 10 amperes. Provide switch with escutcheon plate clearly marked to show operating positions - On and - Off. Motor overload protective devices and power monitor devices shall be connected in motor control circuit in "On" position. 2.3.21.1 The motor controller shall include a manually operated, lockable, non-fused switch which disconnects motor from power supply source. Provide disconnecting means capable of being locked out to prevent unexpected startup or release of stored energy in accordance with 29 CFR 1910.147. Motor Controller enclosure shall be type 3R as specified in NEMA 250. 2.3.22 Controller Requirements. The motor control shall include a 120-volt ac control relay. Relay shall be of the electrically operated, magnetically held, self-reset, open type, suitable for mounting inside the motor controller enclosure. Contacts shall be rated for 10 amperes. Motor controller shall be provided with three NEMA Class 20 thermal overload relay protection, one in each phase of the motors. Size of the Overload protective heater elements to be installed shall be based on motor nameplate data and shall include a manual reset-type pushbutton on outside of motor controller case. 2.3.22.1 The motor controller shall have a magnetic type undervoltage protection, size 3 contactor and shall have one spare normally open and one spare normally closed auxiliary contact that do not share common electrical connections. Motor control wire shall be stranded tinned copper switchboard wire with 600-volt flame-retardant insulation Type SIS meeting UL 44, or Type MTW meeting UL 1063. Hinge wire shall have Class K stranding. The minimum size of control wire shall be No. 14 AWG. Power wiring for 480-volt circuits and below shall be of the same type as control wiring and the minimum size shall be No. 12 AWG. Special attention shall be given to wiring and terminal arrangement on the terminal blocks to permit the individual conductors of each external cable to be terminated on adjacent terminal points. Control circuit terminal blocks for control wiring shall be molded or fabricated type with barriers, rated not less than 600 volts. The terminals shall be removable binding, fillister or washer head screw type, or of the stud type with contact and locking nuts. The terminals shall be not less than No. 10 in size and shall have sufficient length and space for connecting at least two indented terminals for 10 AWG conductors to each terminal. The terminal arrangement shall be subject to the approval of the Contracting Officer and not less than four (4) spare terminals or 10 percent, whichever is greater, shall be provided on each block or group of blocks. Modular, pull apart, terminal blocks will be acceptable provided they are of the channel or rail-mounted type. 2.3.22.2 Load terminal blocks rated not less than 600 volts and of adequate capacity shall be provided for the conductors for NEMA Size 3 motor controllers and for other power circuits, except those for feeder tap units. The terminals shall be of either the stud type with contact nuts and locking nuts or of the removable screw type, having length and space for at least two indented terminals of the size required on the conductors to be terminated. For conductors rated more than 50 amperes, screws shall have hexagonal heads. Conducting parts between connected terminals shall have adequate contact surface and cross-section to operate without overheating. Each connected terminal shall have the circuit designation or wire number placed on or near the terminal in permanent contrasting color. 2.4 SPARE PARTS AND SPECIAL TOOLS: 2.4.1 The Contractor shall furnish all specials tools that are unique to the pump for proper installation, testing, operation, and/or maintenance. Special tools shall be delivered with the pumps. Provide two sets of any special tools. 2.4.2 Spare Parts: All spare parts shall be duplicates of the original parts furnished and shall be interchangeable with those parts. The Contractor shall furnish at a minimum the following spare parts: (a) One complete set of seal assemblies (upper and lower) for one 2500 gpm pump. (b) One complete replacement set of: wear rings, stationary and rotating for one 2500 gpm pump. (c) One complete replacement set of O-rings for one 2500 gpm pump. PART 3 EXECUTION 3.1 FABRICATION AND MACHINING: 3.1.1 Machine Work: All tolerances, allowances, and gauges for metal fits between plain, non-threaded cylindrical parts shall conform to ASME B4.1 for the class of fit required. 3.1.2 Castings: Each casting shall have a mark number cast or stamped upon it. In addition, each casting weighing more than 500 pounds shall have the heat number cast or stamped upon it. Warped or otherwise distorted castings that are oversize to an extent that could interfere with proper fit with other parts of the machinery or structure will be rejected. Cracked castings of non-weldable materials (i.e., cast iron, etc.) will be rejected. Repairs to castings shall not be made without prior approval. 3.1.2.1 Casting repair: Castings shall have all unsound material or defects removed by chipping, machining, air-arc gouging, or grinding; and shall be repaired by welding. Welding repairs shall conform to the welding procedures which shall have been submitted and approved for the type material involved. Stress relief annealing, where required, shall be accomplished prior to final machining. 3.1.3 Bolted Connections: Bolts, nuts, and washers shall conform to the applicable requirements of PARAGRAPH: MATERIALS AND MATERIAL STANDARDS for the types required. 3.1.4 Holes for regular bolts shall be drilled or sub-drilled and reamed in the shop. Holes shall be accurately located, smooth, perpendicular to the member, and cylindrical. 3.1.5 Holes for fitted bolts shall be match-reamed or drilled in the shop. Holes shall be smooth, perpendicular to the member, and cylindrical. Burrs resulting from reaming shall be removed. The threads shall be entirely outside of the holes. The body diameter of the bolt shall have tolerances as recommended by ASME B4.1 for the class of fit required. Fitted bolts shall be fitted in reamed holes by selective assembly to provide an LN-2 fit. 3.1.6 Holes for high-strength bolts shall be accurately spaced, perpendicular to the member, and cylindrical. If the thickness of the material is greater than the diameter of the bolt, the holes shall be either drilled full size or shall be sub-drilled and then reamed to full size. Poor matching of holes will be cause for rejection. Drifting done during assembly shall not distort the metal or enlarge the holes. For slight mismatching, reaming to a larger diameter for the next standard size bolt will be allowed. 3.2 FACTORY TEST: 3.2.1 General: All pumps provided shall be factory tested and have certified factory test curves. No pumps shall be delivered to the project work site until the factory testing has been completed for that pump and the Government has accepted the factory test results. Testing shall be in accordance with HI "Standards for Centrifugal, Rotary and Reciprocating Pumps". 3.2.2 Performance Test: The test shall be sufficiently extensive and complete to demonstrate that the proposed pump operates without instability and complies with the required performance. Compliance with the contract requirements will be determined from the curves required below. The temperature of the water used for testing shall be approximately the same for all test runs. 3.2.3 Pump performance: The performance of the furnished pumps shall be determined by a series of test points sufficient in number to develop a constant speed curve over the range of total heads, from 5.0 feet to 50.0 feet (or to shut off head) inclusive, for the speeds involved. Tests shall be made using specified heads and a suction water elevation above the motor. Head differentials between adjacent test points shall not exceed 2.0 feet. If the plot of the data indicates a possibility of instability in the head versus capacity curve, a sufficient number of additional points shall be made to clearly define the head-capacity characteristics. 3.2.4 Test results: The results of the tests shall be plotted to show total head, brake horsepower, net positive suction head required, and efficiency as ordinates; all plotted against the pump discharge in gallons per minute as the abscissa. The above curves shall be plotted to a scale that shall permit reading head directly to five-tenths of one foot, capacity to 100 gallons per minute, efficiency to one percent, and power input to 2 horsepower. Net positive suction head required data may be based on original design data or previous test information. 3.2.5 Test Report: Each test report shall include as a minimum the following: (a) A description of test procedure used. (b) A discussion of test results. (c) Conclusions. (d) Copies of all recorded test data. (e) Curves showing performance of furnished pump. 3.3 SHIPPING AND DELIVERY: 3.3.1 The Government work force shall be responsible for the installation and operation of the portable trash pumps. 3.3.2 Delivery. By November 14, 2023, the Contractor shall deliver all materials required by the provisions of this contract to: Mississippi River Lock and Dam 2 1350 Lock and Dam Road Hastings, MN 55033 3.3.3 Acceptance. Payment for pumping equipment shall be made upon acceptance at the designated point of shipment. Within five calendar days after delivery to the designated point of shipment, the items shall be inspected by the Government. The inspection shall include an accounting of the items delivered and a visual inspection to determine any possible damage during shipment. If this inspection reveals any defects or deviations from contract requirements which could render the items unsuitable for the use intended, the Contractor shall repair each such identified deficiency. In the event deficiencies cannot be acceptably corrected, the equipment will be subject to rejection. 3.3.4 Packaging and Marking: The Contractor shall insure to have the pumps delivered as completely assembled and wired as feasible to minimize site installation work. The manufacturer's standard packing method, as approved, for the pumps shall be submitted at least 10 calendar days prior to the shipping date. Items to be shipped shall be protected against moisture or water damage and always kept dry. The pumps shall be crated to protect them from damage during shipment and storage: crating shall allow vertical storage. Any relay or other device which cannot withstand the hazards of shipment when mounted in place shall be carefully packed and shipped separately. 3.3.5 Spare Parts and Special Tools: Spare parts and special tools shall be packed separately using the manufacturer's standard packing method as approved. Spare parts shall be clearly labeled and marked. 3.3.6 Packing Lists: Packing lists shall accompany all items shipped and be placed in moisture-proof containers securely fastened to the side of each item. Two copies of each packing list shall be submitted to the Government at least ten calendar days prior to each shipment date. 3.4 PUMP WARRANTY 3.4.1 Pumps shall be covered under a 5-year industry standard warranty. Warranty period shall start from the date of delivery. Parts and Labor shall be covered for 2-1/2 years and parts only for an additional 2-1/2 years.

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

about 23 hours ago

DEADLINE

in 11 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

about 23 hours ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS