This Solicitation opportunity from Department Of The Interior was posted on April 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Z--SUCR SECONDARY SEWER LINE INSTALLATION

Closed
140P1526Q0049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additionally, the project encompasses site improvements, flow control facility components, pavement removal and restoration, traffic control, utility coordination, and the final commissioning, disinfection, and startup of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and materials testing. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes and bids are due by September 18, 2026, at 2:00 PM PT. The project is designated for various set-asides, including Small Business, Small Disadvantaged Business, and Women-Owned Small Business entities.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include the installation of six native trees and approximately 345 native plants, as well as necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. The project also encompasses limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization, cleanup, and restoration. This opportunity specifically seeks subcontractors and suppliers from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business categories including HUBZone and Veteran-Owned Small Businesses. Interested parties are encouraged to form consortiums if individual bid items are too large for a single small business to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for the solicitation include Jennifer Wilson and Jonah Leith.
Harbel, Inc.

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. Bids are due by September 29, 2026, and the project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract involves the installation of a secondary sanitary sewer line at Sunset Crater Volcano National Monument to service seven Recreational Vehicle (RV) spots. The scope includes constructing a new sewer main, connecting sewer services for the RV sites, and building a cleanout for the existing apartment building’s sanitary sewer connection, with surfacing of asphalt upon completion. This is a construction contract set aside entirely for small businesses under the Small Business Administration program, with an estimated project value ranging from $25,000 to $100,000 in accordance with FAR guidelines. A mandatory site visit is scheduled for March 24, 2026, at 9:00 a.m. MST at the Visitor Center Parking Lot in Flagstaff, Arizona. Questions regarding the solicitation must be submitted electronically within three days following the site visit, with government responses provided as amendments. Offers should be submitted electronically by April 16, 2026. For submissions exceeding $35,000, a payment bond is required within ten days of contract award. The contracting office is the Department of the Interior located in Flagstaff, and all communications are to be directed to the listed primary point of contact via the provided email.

General Info

Install secondary sewer line for seven RV spots at Sunset Crater; small business set-aside, $25K-$100K.

Agency

Department Of The Interior → Imr ARIZONA(12400)View Agency

Contract Value

$78,500

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Flagstaff, AZ, 86004

Set-Aside

SBA

Awardee

SEPTECH ATL LLCView Profile

Award Issued Date

Documents

(2)

Sol_140P1526Q0049.pdf

PDF

Amendment 0001 to Solicitation 140P1526Q0049 for SUCR Secondary Sewer Line

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Imr ARIZONA(12400)
Contacts1 person available
OfficeFLAGSTAFF, AZ, 86001, USA
Organization / Agency
Department Of The Interior → Imr ARIZONA(12400)
View Agency Profile
Office AddressFLAGSTAFF, AZ, 86001, USA
Contacts

Full Description

Show more
Sunset Crater Volcano National Monument (SUCR) requires the installation of a secondary sewer line in order to service 7 Recreational Vehicles (RV) spots. Work consists of constructing new sanitary sewer main and services for recreation vehicle sites, construct a clean out for the existing apartment building sanitary sewer service as surfacing asphalt. Please see attached for additional specifications.

AMENDMENT 0001 issued to provide Government responses to questions received and an additional document.

This requirement is being conducts as a construction contract.

This requirement is a 100% Total Small Business Set-Aside.

IAW FAR 36.204, the magnitude for the project is between $25,000.00 and $100,000.00

Offerors are reminded that in accordance with FAR 52.223-18, any offer over $35,000.00 requires the submission of a Payment Bond. Bonds are due within ten (10) days of receipt of award.

Site Visit scheduled for Tuesday, March 24, 2026 at 9:00am Mountain Standard Time. Meeting location is Visitor Center Parking Lot at SUCR. See 52.236-27 for additional details. Questions are due electronically to lindsay_mclaughlin@ios.doi.gov three (3) days after site visit. Government responses will be posted as an amendment to the solicitation to any question(s) received.

All quotes are to be submitted electronically to lindsay_mclaughlin@ios.doi.gov by the date and time set forth in this solicitation.

More opportunities from Department Of The Interior → Imr ARIZONA(12400)

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS