Summit Street Power Plant Cooling Tower Replacement

Open
KSU-27S036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Kent State University is soliciting Statements of Qualifications from engineering firms for the design and planning of the Summit Street Power Plant cooling tower replacement project (KSU-27S036). The project involves replacing four original cross-flow cooling towers that have reached the end of their useful life. The new all-stainless steel cross-flow towers must be fully winterized with EM-powered heat trace and insulation, and integrated with the existing Johnson Controls BAS and JCI’s Central Plant Optimization software. Key technical requirements include the installation of digital water level sensors, the modification of bypass piping to return warmer water to cold basins, and the replacement of the 800A 480/3 CHPMCC-5 with a new distribution panel. The design must ensure that the power plant remains operational during construction, requiring close coordination with KSU personnel. The current funding is limited to design services only, with a budget of $450,000. The selected A/E firm will be responsible for a comprehensive scope including program verification, schematic design, design development, construction document preparation, and construction administration. Evaluation criteria focus on project vision, relevant experience in campus utility design, personnel qualifications, and the implementation of Building Information Modeling (BIM) according to State of Ohio standards. Applicants must submit Form F110-330 by January 13, 2027, and must commit to a 5.0% EDGE participation goal. There is no specific set-aside status for this solicitation.

General Info

Kent State seeks engineering firms to design a cooling tower replacement project.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 54 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 54 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Kent State University
Contacts1 person available
OfficeN/A
Organization / AgencyOhio → Kent State University
Office AddressN/A

Full Description

Show more
Project number: KSU-27S036
The existing Summit Street Power Plant (SPP) cross-flow cooling towers 1 through 4 are original to the construction of SPP in approximately 2001.They are at the end of their useful life and need to be replaced as detailed below. Project funding is limited to design-only at this time. The design efforts will inform the necessary construction budget with the intent of funding through critical deferred maintenance funds. The existing cross-flow cooling towers 1 through 4 serve two (2) dual-compressor electric centrifugal chillers of the same vintage. Each existing chiller is rated at 2,000 tons. The cooling towers (CT-1, 2, 3, and 4) are no longer providing adequate heat rejection capacity during hot and humid weather and high cooling load conditions. These cooling towers are also not winterized, and must be drained during cold weather; this causes undesirable operating parameters for research areas and process loads in buildings served by this chilled water system. The existing cooling towers, electric chillers, and the steam turbine chiller and towers at SPP are all controlled through KSU’s Johnson Controls BAS, with optimization through JCI’s Central Plant Optimization / EOS / OpenBlue software and team. The new cooling towers (CT-1/2/3/4) will be located at the same physical location within the plant, with modifications provided to the existing steel support structure (both dunnage steel under the towers and columns to the building steel structure, as required) and all make-up, equalizer, TWS, and TWR piping below the towers to accommodate the new cooling towers. New cooling towers shall be cross-flow type, with all-stainless steel construction (structure, hot and cold basins/covers, fan deck) with velocity recovery outlet cones, hot deck railings, access ladders, anti-vortex cold basin outlet, and basin sweepers and dedicated piping connections. New cooling towers shall be sized to provide heat rejection capacity above the design values of the existing towers; towers shall be capable of a maximum flow of 3,500 gpm per cell cooled from 95°F EWT to 85°F LWT with an 80°F EWB. New basin sweeper separators and pumps shall be provided at the SPP Lower Level near the existing sidestream filtration equipment. Dedicated piping between the new basin sweepers and the separators/pumps shall be routed through the main plant floor and coordinated with KSU SPP personnel during design. Two (2) sweeper systems shall be provided, with one system per pair of towers (CT-1+2 and CT-3+4). Shell and tube heat exchangers (steam in tubes, tower water reverse-piped in shell) shall be provided in sweeper system discharge piping to provide freeze protection at the cooling tower cold basins. The new cooling towers shall be fully winterized. EM-powered heat trace and insulation and jacket shall be provided for all exterior piping and shall extend at least 24” into the building interior, and heat trace shall be controlled using the existing SPP heat trace control system. Cooling tower fans and VFDs shall be capable of reversing air flow when signaled by the BAS. Cold basins shall be heated using the basin sweeper system heat exchangers; note that this requires the use of EM power for basin sweeper equipment. Automatic 2-position valves shall be used to drain the TWR piping up to the hot water basins into the equalizer or cold water basin and tower-specific make-up piping when towers are disabled. Cooling tower bypass piping shall be modified as required to provide improved and more complete bypass during cold weather operation of the operating chillers. Existing cooling tower bypass piping and control occurs within the plant, and does not return water discharged from the chillers’ condensers to the cold basin of the cooling towers. When full tower bypass occurs, water is stagnant in the cold basins, TWS/TWR piping, and equalizer piping. It is desired under this project to return the warmer water discharged from the chillers to the cold water basins through the equalizer piping. Existing equalizer piping appears to be under-sized, and uneven cold basin water levels have been observed by KSU plant personnel during tower operations. Equalizer piping shall be analyzed and replaced to provide improved cold basin level maintenance. Make-up water piping to each cooling tower shall be controlled through the BAS using a digital water level sensor (5 probes, 4 level indications) and a solenoid type control valve. All make-up water piping shall be heat traced from existing piping to the cooling tower cold basin connections. Manual 1” ball valves with hose thread adapters shall be provided at the makeup piping below the new towers for intermittent cleaning of the towers and other roof mounted equipment. Each cooling tower shall be provided with individual TWR/TWS control valves at the hot water inlet to the tower and the cold water outlet from the tower. Manual valves shall be provided at the hot inlet, cold outlet, equalizer, make-up, cold basin drain, and basin sweeper piping connections at each tower cell. Existing TWR, TWS, and equalizer headers under all 6 cooling towers are capable of cross-connection so all towers can serve all chillers. Under this project, these manual valves shall have actuators added to permit automatic actuation of these valves. Existing cooling tower fan VFDs are located in the SPP lower level electrical room. New cooling tower VFDs and load/line-side reactors will be located in place of the current tower fan VFDs. The existing 800A 480/3 CHPMCC-5 with one VFD providing power to CT-1/2/3/4 shall be replaced with a distribution panel with spare capacity for connection of future equipment. Note that this project will take place during winter months when cooling loads are expected to be low, but operation of the SPP steam turbine chiller and CT-5/6 is likely for at least some time period during the Work. The team will be required to ensure operation of the remaining cooling plant equipment during the project. Operations of the Power Plant will continue during the project; coordination of access and any equipment shutdowns will be required with KSU Power Plant personnel.
Scope of Services: Kent State University is soliciting Statements of Qualifications from qualified engineering firms to provide professional design and planning services for an HVAC infrastructure project at the Kent Campus Stewart Hall. The Program of Requirements for this phase of work has been developed by the Office of the University Architect, and work will commence with Design. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. During the construction period, provide not less than four hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. Please list all major scope services needed to complete the selection process for successful project delivery. The specific scope of services must state particular building types, functional design or specialized professional services required to evaluate the level of experience of each applicant firm (e.g. parking garage, kitchen design, correctional facility, medical facility). The scope of services should also define the types of basic and additional professional design and administration services necessary for the project (e.g. previous experience with local jurisdiction or similar sites, previous experience working with the State of Ohio, Building Information Modeling (“BIM”) experience and training, specific BIM and Owner- defined requirements, level of development to be achieved within BIM models, BIM deliverables, and Owner’s intended use of BIM models after construction). This information will be used by each applicant to populate the Relevant Project Experience Matrix in Section F of Form F110-330. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1) Project Delivery Method: General Contracting 2) Role on Project: A/E 3) Campus Central Utilities and Plant Design 4) Work in Occupied Buildings 5) Cross-Flow Cooling Tower Design 6) Designing for construction during ongoing plant operations and occupancy 7) Higher Education Experience 8) 9) 10)

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
FMP-8A Kasch Park Zero Emissions Phase 1 & Underground Storage Tanks Replacement - Construction Management Services
Solicitation # 2026-156
Community Transit is soliciting Request for Qualification 2026-156 for Construction Management Services (CMS) to oversee two concurrent capital improvement projects at the Kasch Park Campus in Everett, Washington. The first project, Facilities Master Plan Phase 8A, focuses on the installation of Battery Electric Bus (BEB) charging infrastructure to support the transition from diesel to electric fleets. The second project involves the replacement of aging underground storage tanks with a new high-capacity aboveground storage tank system. The selected Construction Management Team will be responsible for project management, preconstruction, field inspection, and quality documentation, including the provision of one full-time on-site inspector to monitor progress and safety. The contract is structured as a Cost Plus Fixed Fee (CPFF) agreement, with a projected timeline starting in April 2027 and anticipated completion in October 2028. Award selection follows a Qualifications Based Selection (QBS) process based on the Brooks Act or RCW 39.80, evaluating firm qualifications (50 points), key personnel (40 points), and small business and equity commitments (10 points). Proposals must be submitted via the agency portal by January 6, 2027, and must include a Statement of Qualifications limited to 15 pages, a completed questionnaire, and a conflict of interest certification. There is no specified set-aside status for this solicitation.
Community Transit

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
International
Red Deer Polytechnic - Negotiated Request for Proposal - Campus Fire Alarm Modernization-Consulting Service
Solicitation # 270655
Red Deer Polytechnic is seeking consulting services for a multi-year, multi-phase Campus Fire Alarm Modernization program in Red Deer, Alberta. The project focuses on replacing the existing Edwards EST3 platform and upgrading campus fire alarm, life safety, and emergency voice communication systems. The selected consultant will act as an independent technical adviser and co-project-management resource, delivering a scope of work divided into four phases. Key deliverables include existing systems audits, gap analysis against the 2023 Alberta editions of the National Building Code and National Fire Code, drafting a Request for Information (RFI), developing sealed design documents, and performing predictive acoustic modeling and Speech Transmission Index analysis. The procurement process utilizes a multi-stage evaluation based on mandatory submission and technical requirements, non-price rated criteria, and pricing submitted as binding fixed lump-sum fees in Canadian funds. Successful proponents must provide evidence of Workers' Compensation Board coverage in good standing and comply with Alberta Occupational Health and Safety laws. The contract term begins upon execution and continues until deliverables are complete, though Red Deer Polytechnic reserves the right to authorize phases individually. Payment is issued within 30 days of receiving accurate invoices. There is no specified set-aside status for this solicitation.
Red Deer Polytechnic

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
RFQ to Provide Enfineering Services
Solicitation # RFQ 002-2026
The City of Avondale Estates is soliciting Statements of Qualifications (SOQs) from qualified engineering and design firms for the Downtown Avondale Multimodal Improvements – Shared Streets project (GDOT PI 0021589). Located in the Central Business District of DeKalb County, Georgia, the project encompasses approximately thirteen blocks across Olive, Washington, Franklin, Oak, Center, and Parry Streets. The objective is to create a safe, connected multimodal network using shared-street design principles, incorporating traffic calming, pedestrian and bicycle accommodations, streetscape improvements, landscaping, lighting, and drainage. The project is divided into several phases, with preliminary engineering and design anticipated from October 18, 2027, to March 8, 2030, followed by right-of-way acquisition through April 1, 2031, and construction beginning July 15, 2031. The selection process is based on the best interest of the sponsor, with evaluation weights assigned to the technical approach (40%), project manager and resource capacity (20%), and past performance (10%). All participating firms must meet GDOT prequalification requirements and comply with non-discrimination mandates, including Title VI of the Civil Rights Act of 1964 and Title 49 CFR Part 21. Required submissions include a notarized certification form, a Georgia Security and Immigration Compliance Act affidavit, and a detailed SOQ. There is no set-aside status for this solicitation. Final contract fees will be determined through negotiations with the highest-ranked consultant.
City of Avondale Estates

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Ohio → Kent State University

Same awarding agency

NAICS: 541310
SLED
Library Tower Renovations
Solicitation # KSU-27S031
Kent State University is soliciting Statements of Qualifications from architectural firms for project KSU-27S031, which involves the phased renovation and space optimization of the Main University Library on the Kent Campus. The project aims to modernize the first-floor infrastructure, including the circulation desk, computer lab, and escalator connections, to better support contemporary digital scholarship and multipurpose student engagement. With a construction budget of 4,740,000 dollars and an estimated basic fee range of 8 to 9 percent, the selected A/E firm will provide comprehensive services including program verification, schematic design, design development, construction document preparation, bid support, and construction administration. The project is scheduled to begin professional services in March 2027, with substantial completion expected by December 2028 and final professional services concluding in February 2029. The selection process utilizes a point-based scoring system evaluating project and design leads, technical staff, BIM experience, and knowledge of the Ohio Capital Improvements process. Applicants must demonstrate experience with high-rise buildings, higher education libraries, and phased construction in occupied spaces using a General Contracting delivery method. Requirements include the use of the OAKS capital improvement management system and adherence to state prevailing wages. Additionally, firms must commit to the Encouraging Diversity, Growth and Equity program with a participation goal of 5.0 percent of the initial total A/E fee. All proposals must be submitted via Form F110-330 in PDF format by December 15, 2026.
Architectural Services

POSTED

15 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS