Sunset Complex Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Pasadena is undertaking a major infrastructure upgrade at the Sunset Reservoir Complex located at the northwest corner of Sunset Avenue and West Mountain Street in Pasadena, California, to modernize its water storage and treatment systems. The project involves replacing two aging reservoirs—Originally constructed in 1888 and 1900 with a combined capacity of 15.5 million gallons—with two new prestressed concrete reservoirs totaling 11 million gallons of capacity. Proposed Reservoir 1, with a 210-foot diameter and 4.9 million gallon capacity, will be positioned at the narrower southern end of the 7.17-acre site, while the larger Proposed Reservoir 2, with a 234-foot diameter and 6.1 million gallon capacity, will be located to the north. Both reservoirs will be partially buried with a minimum of 12 feet of backfill around their exteriors to provide structural stability and drainage away from the tanks. The project also calls for the demolition of several existing structures including the Sunset Well Building, Electrical Transformer Area, and the Disinfection Facility, with the latter being replaced by a new disinfection structure that will incorporate salvaged equipment such as existing chemical storage tanks. The Bangham Well Building will remain but will undergo significant internal upgrades including replacement of its retention pond, sump pump, valves, piping, and pumping equipment. Architectural improvements will be made to the Glorieta Booster Station façade and its electrical enclosure will be modified to accommodate an automatic transfer switch connected to a new standby generator. In addition to the reservoir replacements and demolition activities, the project includes the construction of a new 1,500 gallons per minute groundwater treatment plant with expansion capability to 4,500 gpm, utilizing ion exchange technology for perchlorate removal and liquid granular activated carbon for volatile organic compound reduction. The site will see enhancements to stormwater management, installation of solar canopies and rooftop photovoltaic panels, electric vehicle charging stations, a backwash tank, air gap structure, overflow and drain systems, and two backup generators to ensure continuity of operations. Site improvements include reconfigured access points with the main ingress/egress located at the northeast corner, expansion of the existing northern entrance along Sunset Avenue for improved traffic flow, upgraded fencing, new parking areas, and landscaping. The project’s grading plan results in a net export of approximately 3,700 cubic yards of material. All work must comply with California environmental regulations including

General Info

Pasadena upgrades Sunset Reservoir with two new tanks, treatment plant, solar panels, and infrastructure upgrades.

Agency

California → City of Pasadena

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Sunset Avenue and West Mountain Street, Pasadena, CA, 91103

Set-Aside

NONE

Documents

(6)

2022040167_DWR Comment on Sunset Complex Project EIR

PDFcomment-letter

Sunset Complex Project Environmental Impact Report July 2025

PDFenvironmental-impact-report

Summary Form for Document Submittal - Sunset Complex Project

PDFenvironmental-summary

Sunset Complex Project Notice of Completion

PDFnotice-of-completion

Sunset Complex Project Draft Environmental Impact Report Notice of Availability

PDFspecial-notice

EIR Notice of Preparation for Sunset Complex Project

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pasadena
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Pasadena
Office AddressN/A
Contacts
Jason RunyanSenior Environmental Project Manager

Interested Companies (1)

Show more
HELIX Environmental Planning
La Mesa, CA

Full Description

Show more
The Project, located at the City of Pasadena’s Sunset Reservoir Complex at the northwest corner of the intersection of Sunset Avenue and West Mountain Street (Pasadena, Los Angeles County, CA) consists of replacing two 125-plus-year-old reservoirs (15.5 million gallons) with new prestressed concrete reservoirs (11 million gallons), construction of a new 1,500 gallons per minute (gpm) Ion Exchange and Liquid Granular Activated Carbon groundwater treatment plant (GWTP) with room to expand to 4,500 gpm, and improving existing 1,500 gpm groundwater well. The proposed Project would be composed of multiple structures, including existing, replaced, and newly constructed structures. Additionally, the Project involves the removal and installation of piping, as well as other site improvements related to parking, ingress/egress, etc. The Project would demolish the two existing reservoirs on site, Existing Reservoir 1 and Existing Reservoir 2, including A-Basin. These structures were built in 1888 and 1900, respectively, and provide storage for the City of Pasadena’s water system. These structures would be removed in order to replace them with Proposed Reservoirs 1 and 2. There are several other structures that are being demolished as part of the proposed Project. The Sunset Well Building and Electrical Transformer Area would be removed in its entirety. The Disinfection Facility would be demolished and a new disinfection structure in a different area would be constructed utilizing some of the salvaged equipment, including the existing chemical storage tanks. The Project proposes improvements to several of the existing structures on the site, driveway entrances, fences, and landscaping. The Bangham Well Building will remain, but the well’s existing retention pond, sump pump, valves, elbows, tees, air relief valve, well pump discharge head, column and motor, concrete, fence and assorted piping would be replaced. Architectural modifications to the façade of the Glorieta Booster Station building would occur as part of the Project. Additionally, the Electrical Equipment Enclosure associated with the Glorieta Booster Station would be modified to add an automatic transfer switch for connection to the new standby generator. The Project would construct two new reservoirs at the 7.17-acre site, herein referred to as Proposed Reservoir 1 and Proposed Reservoir 2. Proposed Reservoir 1 would have an inside diameter of approximately 210 feet, a total footprint of 36,530 square feet, and a capacity of 4.9 million gallons (MG). Proposed Reservoir 2 would have an inside diameter of approximately 234 feet, a total footprint of 45,180 square feet, and a capacity of 6.1 MG. Collectively, the two reservoirs would provide a total capacity of 11.0 MG. The proposed reservoirs would be constructed at different sizes due to the geometry of the existing site, which narrows at the south end of the site. By installing the smaller reservoir (Proposed Reservoir 1) in the south end of the site, the Project would be able to preserve more space for the approximately 5,250-square-foot proposed groundwater treatment plant (GWTP) and parking at the north end of the site. Backfill would be placed around both reservoirs, as the reservoirs would be partially buried. The depth of the backfill would be a minimum of 12 feet deep all around the tanks and of sufficient depth to resist the sliding forces of the empty tanks. The finished grade would provide drainage away from the new tanks. The main ingress/egress would be located at the northeast corner of the site. The existing employee entrance to the north along Sunset Avenue would be widened to allow for safety and ease of traffic flow. Additional proposed project components include two backup generators, a groundwater treatment plant consisting of an ion exchange for perchlorate removal and granular activated carbon for volatile organic compound (VOC) removal, an air gap structure, stormwater treatment improvement, solar canopies and rooftop panels, electric vehicle charging stations, a backwash tank, a disinfection facility, and overflow and drains. The current grading plan results in an approximate net export of 3,700 cubic yards (CY).

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The Enlisted Unaccompanied Personnel Housing project at Eglin Air Force Base in Florida involves the construction of two two-story barracks buildings. Each 120-bed facility will feature 32 units, with each unit containing a kitchen, dining area, living area, and laundry room. Common areas within the buildings include a lobby, elevator, entrance vestibule, exercise room, day room, lounge, and dedicated mechanical, electrical, and communications rooms. The project scope extends to comprehensive sitework, including the installation of roadways, parking lots for vehicles and motorcycles, concrete sidewalks, grading, utilities, and a storm sewer system. Additional site amenities include a large open pavilion and both basketball and volleyball courts. Managed by Roy Anderson Corp under NAICS code 236220, this solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB entities. The scope of work encompasses a wide range of functional categories, from initial demolition and concrete work to specialized installations such as HVAC, fire protection, and elevators. The contract adheres to strict equal opportunity standards, incorporating Executive Order 11246, the Rehabilitation Act of 1973, and the Vietnam Era Veterans Readjustment Act of 1974. Bids for labor, materials, supervision, and equipment must be submitted by August 18, 2026.
Roy Anderson Corp

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center is seeking bids for a sub-contract opportunity to perform complete bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves renovating four distinct bathroom areas in Building 17, totaling approximately 944 square feet, and five distinct bathroom areas in Building 18, totaling approximately 1,260 square feet. These areas include multi-stall student showers, toilets, and vanity spaces across various floors. All work must adhere to ADA, OSHA, National Electrical Code, and NFPA Standard No. 101 Life Safety Code requirements. To maintain center operations, contractors must renovate the dormitories one at a time. This is a fee-for-service solicitation open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB. Bidders may submit a unified proposal for both buildings or standalone bids for each. Required submission materials include a completed bid sheet with an itemized cost breakdown separating labor and materials, a proposed project schedule, current Vermont state professional licensing, and standard vendor paperwork such as Form W-9 and a Certificate of Liability. Payment terms are net 30 days upon receipt of a proper invoice and proof of goods. ETR serves as the sole judge for bid selection, and the lowest bid does not guarantee an award. The response deadline is September 14, 2026.
Northlands Job Corps Center /ETR

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Federal
BEQ HP200 Area Paint & Flooring Repairs
Solicitation # N4008526R9055
Only General MACC Contractors listed on the General Requirements cover page are eligible to submit proposals for this project, which is titled BEQ HP200 Area Paint & Flooring Repairs under solicitation N4008526R9055. The solicitation, posted on July 21, 2026, has a response deadline of August 13, 2026, and is classified as a Total Small Business Set-Aside under FAR 19.5 with a NAICS code of 236220, restricting eligibility to small businesses. The work is to be performed at Camp Lejeune, North Carolina, and involves interior finishing services including resilient flooring installation and painting of interior and exterior surfaces. Flooring work must comply with ASTM D4078 and Section 07 92 00 for sealants, using approved underlayment and crack fillers, while paint and coating applications must originate from a single manufacturer and align strictly with the MPI Approved Product List. All work must adhere to detailed technical specifications in Combined DIV 01 DBB SPECS, 09 65 00 Resilient Flooring, 09 68 00 Carpeting, and 09 90 00 Paints & Coatings, requiring preconstruction submittals such as insurance certificates, surety bonds, a Baseline Network Analysis Schedule, shop drawings, a Quality Control plan, and an Environmental Protection Plan. Contractors must submit a detailed Schedule of Prices to the COR within 15 days of award, and payments are processed under FAR 52.232-27 and FAR 52.232-5 via WAWF, requiring invoices on NAVFAC Form 7300/30 certified by the QC Manager along with supporting documentation including monthly work-hour reports, progress schedules, safety self-evaluations, certified payrolls, and waste disposal reports. As-built records must be submitted in accordance with FAR 52.236.21, and final acceptance requires a DD Form 1354 completed at least 60 days prior, removal of temporary distribution lines, and manufacturer certifications dated after award. The contractor must utilize CPM scheduling, submit an equipment delivery schedule within 30 days of approved construction schedule, and update both schedules monthly. Environmental compliance is mandatory under EO 12088 and EO 1405
Navfacsyscom Mid-Atlantic

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
Federal
INDUSTRY DAY AND MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale-Hollywood International Airport
Solicitation # 697DCK-26-R-FLL01
The Federal Aviation Administration is conducting a market survey and Industry Day notice under solicitation 697DCK-26-R-FLL01 for the design and build of a new Air Traffic Control Tower at the Fort Lauderdale-Hollywood International Airport in Florida. The project is estimated to have a value between 75 million and 100 million dollars and is anticipated to utilize the Progressive Design Build method. The scope of work includes the construction of a tower with a total height of 245 feet AGL and a cab floor height of 210 feet AGL, requiring full environmental compliance and adherence to strict line-of-sight and operational safety standards. Interested sources must submit their responses via email by 5:00 PM ET on August 27, 2026. Submissions must be on company letterhead, limited to 10 pages, and include the company's Unique Entity Identifier, business size status, bonding capacity, and evidence of experience with vertical construction projects valued at 10 million dollars or more. This procurement is categorized under NAICS code 236220 and is managed by the 697DCK Regional Acquisitions Services office. The FAA is using this survey to identify capable sources and gauge industry interest through one-on-one discussions and Industry Day participation.
697DCK Regional Acquisitions Svcs

POSTED

about 9 hours ago

DEADLINE

in 13 days
View Details