Sunset Weir and Pumps Fish Passage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sunset Weir and Pumps Fish Passage Project, managed by the California Department of Water Resources, focuses on restoring natural fish migration and upgrading water diversion infrastructure on the Feather River near Live Oak in Sutter and Yuba counties. The primary objective is the removal of the Sunset Weir to provide unimpeded passage for protected species, including green sturgeon, chinook salmon, and steelhead, across 28.5 miles of the river. To maintain water supply obligations under new hydraulic conditions, the project includes replacing and upgrading the Sunset Pump Station with a new wet well, rehabilitating discharge pipelines, and installing five fish screens that comply with current state and federal standards. Additionally, the project involves stabilizing the eroded left bank of the river using bioengineering and vegetated rock slope protection, and capping the downstream scour pool with spawning grade gravel. Construction is scheduled to occur over three consecutive years between April 2027 and September 2029, adhering to specific work windows for dry work and in-water activities. The project is subject to strict environmental compliance under CEQA and NEPA, with specific mandates for hazardous waste handling, secondary containment of fluids, and the protection of tribal cultural resources through active monitoring and established work-stoppage protocols. Lead agency contact for the project is Kevin Marr. The project has undergone comprehensive environmental review, resulting in a Final Supplemental Environmental Impact Report and Notices of Determination confirming that the project will not have a significant environmental effect.

General Info

DWR project removing Sunset Weir and upgrading pumps for fish passage 2027-2029.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Paseo Road, McDonald Avenue, Kent Avenue, Live Oak, CA, 95953

Set-Aside

NONE

Documents

(10)

Sunset Weir and Pumps Fish Passage Project Notice of Completion

PDF3 pagesnotice-of-completion

Sunset Weir and Pumps Fish Passage Project Draft Supplemental Environmental Impact Report Jan 2026

PDFenvironmental-impact-report

Notice of Determination for Sunset Weir and Pumps Fish Passage Project

PDF1 pagenotice-of-determination

Notice of Determination for Sunset Weir and Pumps Fish Passage Project

PDF1 pagedetermination-and-findings

Notice of Determination - Sunset Weir and Pumps Fish Passage Project

PDF1 pagenotice-of-determination

Sunset Weir and Pumps Fish Passage Project Summary Form

PDF2 pagesenvironmental-summary

2026 Environmental Document Filing Fee Cash Receipt - Sunset Weir and Pumps Fish Passage Project

PDF1 pagereceipt

CDFW Comments on Sunset Weir and Pumps Fish Passage Project DSEIR

PDF4 pagescomment

Sunset Weir and Pumps Fish Passage Project Final Supplemental Environmental Impact Report May 2026

PDF198 pagesenvironmental-impact-report

Sunset Weir and Pumps Fish Passage Draft SEIR Notice of Availability

PDF2 pagesspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Kevin MarrEnvironmental Scientist, Riverine Stewardship Program, Division of Multibenefit Initiatives

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The Proposed Project consists of removal of the Sunset Weir and restoration of natural, volitional passage conditions for protected migratory fish species; replacement and upgrade of the Sunset Pump Station to operate at a lower surface water elevation and rehabilitation of existing pump discharge pipelines; installation of new fish screens that meet current State and federal standards for protecting fish; and stabilization of eroded Feather River left bank downstream of the weir, incorporating bioengineering techniques. Removal of the Sunset Weir would restore unimpeded passage so that migratory fish could access the 28.5 miles of the Feather River from the Sunset Weir (River Mile 38.5) upstream to the existing Feather River Fish Barrier Dam (River Mile 67). Weir removal would also allow for a more natural riverine morphology with variable and distinct habitat types (e.g., deep pools and shallow riffles) as compared to the current backwatered and more slough-like conditions that persist for miles upstream of the existing weir; in this way, weir removal would restore natural fish passage conditions for the Feather River channel. Concurrent with weir removal and river restoration, the Sunset Pumps would be replaced and upgraded to be able to operate under the lowered riverine hydraulic conditions to meet existing water supply obligations. This would involve replacing the pumps and motor units and slip-lining or replacing associated discharge piping, constructing a new cast-in-place concrete structure (i.e., wet well) that would house the pumps and motor units, and installing contemporary fish screens that meet current criteria. Bank stabilization work on the left bank of the Feather River would be implemented as part of the Proposed Project. The work would involve flattening the eroding bank to a 3 horizontal to 1 vertical slope and protecting most of it against further failure and erosion using vegetated rock slope protection and bioengineering methods. The toe and lower portion of the vegetated rock slope protection would be stabilized with rock slope protection up to the ordinary high-water mark, with longitudinal peak stone toe protection, and with willow pole baffles planted perpendicularly to the flow. The left bank stabilization area below the ordinary high-water mark would be allowed to fill in naturally over time, with the final grade designed to benefit native fish as potential off channel refugia for out-migrating salmon and sturgeon during their seasonal migration periods at higher flows.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS