Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Sunshade Structural Steel Fabrication

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and supply of four new sunshade structures for prime contractors supporting US Air Force projects at Creech AFB in Indian Springs, Nevada. Each structure measures 80 feet in length, 115 feet in width, and 28 feet in height. To eliminate the need for IBC special field weld inspections, all structural member connections must be completed during shop fabrication using structural steel and equipment that adheres to IBC standards. The project is designated as a total Small Business Set Aside under NAICS code 332312 and is managed by the Department of Defense through the FA4861 99 Cons Lgc agency. The scope of work concludes with the delivery of the four completed fabricated structures to the designated site.

General Info

Fabrication and supply of four sunshade structures for US Air Force at Creech AFB.

Agency

Department Of Defense → FA4861 99 Cons LgcView Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

Indian Springs, NV, 89018, USA

Set-Aside

SBA

Documents

This scope was carved out of F4FANG6133A001.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CANCELLATION NOTICE: EOU Sunshades Creech AFB

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4861 99 Cons Lgc
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA4861 99 Cons Lgc
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and supplies four new sunshade structures for prime contractors on US Air Force projects at Creech AFB, NV. Performs shop fabrication of all structural member connections to eliminate IBC special field weld inspections for structures measuring 80'L x 115'W x 28'H. Uses structural steel and shop-welding equipment per IBC standards. Delivers four fabricated sunshade structures to the site.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA4861 99 Cons Lgc

Same awarding agency

NAICS: 333120
New
Federal
801 RHTS Concrete Batch Plant
Solicitation # F3QCDK6132G004
This solicitation, identified by number F3QCDK6132G004, is a combined synopsis and request for quotation issued under FAR Part 12 for the acquisition of a single Mobile Concrete Batch Plant, designated as CLIN 0001, to be delivered to Nellis Air Force Base in Nevada. The requirement is set aside entirely for small businesses as defined by NAICS code 333120 with a size standard of 1,250 employees, and the contract will be awarded as a Firm Fixed Price agreement. The award will follow a Lowest-Priced, Technically Acceptable approach, where only offers rated “Acceptable” on technical capability will be considered, and the lowest evaluated price will determine selection. Proposals must include a complete Statement of Work describing compliance with all requirements, along with manufacturer details, model and part numbers, images, CAGE code, SAM Unique Entity ID, payment and discount terms, point of contact information, and a delivery schedule. All submissions must be sent electronically via email to Sedrina Welches by 1000 PDT on Friday, 28 August 2026, with no hard copies or alternative submission methods accepted. The Concrete Batch Plant must be a self-erecting, towable unit capable of producing 180 to 250 cubic yards per hour, fully equipped with a 10–12 cubic yard horizontal mixer, three 47 cubic yard aggregate bins, a 2000 cubic foot cement silo, dual cement feeders, 4-point load cells, an HVAC-equipped control station, and a DOT-compliant chassis. The system must operate using only end-user supplied materials and include two sets of operational, parts, and service manuals; Windows 10/11-compatible diagnostic software; a five-year warranty; and on-site 40-hour operator and maintenance training. All equipment must meet MIL-PRF-16173 Grade 4 and MIL-C-83933 standards for corrosion protection, with corrosion prevention having a minimum five-year life expectancy. Military marking is required, including nomenclature, make and model, serial and registration numbers, NSN, weights, warranty, contract number, and “US PROPERTY” labeling. Delivery is FOB Destination at Nellis AFB within 180 days after receipt of order. Contractor personnel must obtain base identification and vehicle passes through a formal request process and comply
Construction Machinery Manufacturing

POSTED

3 days ago

DEADLINE

in 3 days
View Details
NAICS: 238330
New
Federal
F3G3AA6218AG03 - 57 MXG Flooring
Solicitation # F3G3AA6218AG03
Solicitation F3G3AA6218AG03 is a Firm Fixed Price request for quotation for the replacement of approximately 2,800 square feet of rubber flooring in the Wheel and Tire Shop, Building 270, at Nellis Air Force Base, Nevada. The scope of work includes the removal and disposal of existing flooring and adhesive, concrete surface preparation, and the installation of black, slip-resistant, and chemical-resistant rubber flooring with a minimum thickness of 1/3 inch, specifically requesting EcoGrip brand name or equal. The project requires all seams to be flush and treated with seam welding. Performance must adhere to the International Building Code 2009 Edition, DoD Unified Facilities Criteria Standards, and NAFB Management Plan 12 for environmental protection. This is a total small business set-aside under NAICS code 238330. The government will award the contract to a single responsible vendor based on the lowest-priced, technically acceptable (LPTA) criteria. Delivery is required within 45 days after receipt of the order, with inspection and acceptance occurring at FOB Destination. Quotes must be submitted electronically to the contracting office by September 17, 2026, and must include the offeror's CAGE code, SAM Unique Entity ID, product specifications, and proposed delivery schedule. Standard working hours for the project are Monday through Friday, 7:00 am to 4:00 pm.
Flooring Contractors

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 332312
New
Federal
CANCELLATION NOTICE: EOU Sunshades Creech AFB
Solicitation # F4FANG6133A001
The Experimental Operations Unit at Creech Air Force Base is soliciting a firm fixed price contract for the design, procurement, and installation of four new CCA shade structures on the south ramp of the aircraft parking apron. Each new structure must feature four aircraft parking bays, LED lighting powered by a photovoltaic array with a 12-hour battery pack, service power outlets, and a solar battery powered obstruction light. The design must also include a vertical wall panel on the west end to provide afternoon shade and utilize double bolted connections for structural safety. In addition to the new construction, the contractor is responsible for relocating four existing sunshades to align perpendicularly with the new structures and demolishing one existing sunshade. This procurement is a total small business set aside under NAICS code 332312, with the award based on the lowest-priced, technically acceptable (LPTA) offer. The contractor is responsible for all design phases, including stamped calculations and FAA submissions, and must comply with the Buy American Act and various building codes such as the IBC and NEC. The total period of performance is 210 days after the award, consisting of 90 days for design and 120 days for construction. Performance takes place at Creech AFB in Nevada, requiring strict adherence to airfield safety protocols, including the use of hearing protection and the coordination of security escorts for personnel without appropriate clearances.
Fabricated Structural Metal Manufacturing

POSTED

4 days ago

DEADLINE

in 5 days
View Details