This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Supply and Install a Metal Storage Building at Bolivar Mitigation Area
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The U.S. Army Corps of Engineers, Vicksburg District, is seeking a firm-fixed price contract for the supply and installation of a pre-engineered metal storage building at the Bolivar Mitigation Area in Mississippi, with all work required to be completed within 90 days of award. This solicitation, numbered W912EE26QA027, is issued as a 100% total small business set-aside under NAICS code 332311, with a size standard of 750 employees, and follows FAR Subpart 12.2 for commercial item acquisition. Offerors must provide a clear project schedule, comprehensive delivery plan, and identification of a licensed professional engineer to supply stamped and sealed drawings, all of which are mandatory for a successful capability evaluation. The government will award the contract on a lowest price technically acceptable basis, with no discussions anticipated unless deemed advantageous. The site visit is scheduled for May 28, 2026, and all technical questions must be submitted exclusively through the ProjNet portal prior to the revised proposal deadline of June 5, 2026, at 2:00 PM CST. Amendment 0001 has extended the proposal date, removed the manufacturer tool kit requirement, and adjusted the period of performance to align with the 90-day installation window. Contract performance requires the contractor to lay concrete, deliver and install the building, provide a commercial warranty, and remove all job site debris, while adhering to USACE Safety and Occupational Health Requirements (EM 385-1-1). The contract includes mandatory clauses for cybersecurity compliance under DFARS 252.204-7012, payment by electronic funds transfer via SAM and WAWF, prompt payment under the Prompt Payment Act, and adherence to the prohibition on contracting with inverted domestic corporations and convict labor. Contractors must maintain current SAM registration with accurate EFT information and designate an electronic business point of contact for WAWF access. Subcontracting is limited to no more than 50% of the contract value going to non-similarly situated entities, and the use of the E-Verify program is required for employment eligibility verification. Invoices must comply with 5 CFR part 1315.9(b), be submitted electronically via WAWF, and include the required receiving report standards per DFARS Appendix F. The government retains the right to inspect and accept the work, with recourse to
General Info
Agency
NAICS
Place of Performance
Alligator, MS, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
W912EE
***Amendment 0001 has been issued. This amendment changes the period of performance to 120 days, it removes the mamufacturer tool kit requirement, and it extends the proposal due date to Friday, June 05, 2026 at 2:00 PM CST. All Projnet questions have been answered and added as an attachment to this amendmnt. No additional ProjNet inquiries will be answered. All terms and conditions remain the same.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.2, as supplemented with additional information included in this notice.
Solicitation Number W912EE26QA0027 is being issued as a request for quote (RFQ) with the intent to issue one Firm-Fixed Price Contract. This solicitation is being issued as a 100% total small business set-aside. The NAICS code for this requirement is 332311 - Prefabricated Metal Building and Component Manufacturing, the size standard is 750 employees. This procurement is being conducted in accordance with regulations at RFO Part 12 - Acquisition of Commercial Products and Commercial Services
The U.S. Army Corps of Engineers, Vicksburg District, requires the supply and installation of a pre-engineered storage building at the Bolivar Mitigation Area. The contractor shall lay the concrete, purchase, deliver, and install the storage building, and provide a commercial warranty and perform any rework, if necessary. All work shall be completed no later than 90 days after award.
All Offerors shall submit a quote with content as specified herein. Quotes submitted without the specified content may be determined non-responsive and removed from further consideration. Offers are encouraged to review all clauses that are incorporated into this solicitation.
The government intends to make one award for one firm fixed price contract. Offers for less than the required delivery will not be accepted. The Government intends to award without discussions while reserving the right to hold discussions if determined advantageous to the Government. Offerors are encouraged to provide the best proposed pricing in their initial offer.
A site visit will be held on Thursday, May 28, 2026, from 12pm-2pm CST at the project site. Please contact Chad Phillips at 601-415-8660 or John Hood at 601-831-0017 to confirm the time for your visit. Coordinates for this site are (34.122965, -90.799082). Government employees are not allowed to discuss project specifics. Any formal questions shall be submitted through the ProjNet portal. See information below.
More opportunities from Department Of Defense → W07V Endist Vicksburg
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
