Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Supply of BEB Charging Equipment and Power Conversion Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply and integration of battery electric bus charging equipment, including pantograph charging systems, power conversion modules, and software interfaces designed to ensure seamless compatibility and operational efficiency. All components must comply with applicable federal standards to guarantee safety, reliability, and interoperability within public transit infrastructure. The work requires end-to-end delivery, installation, and system integration to support the deployment of electric bus fleets, with a strong emphasis on performance, scalability, and long-term maintenance readiness. The solicitation is issued as a subcontract under the agency name Engineering and Program Delivery, with a response deadline of September 25, 2026. The North American Industry Classification System code 335313 applies, indicating the scope aligns with electrical equipment manufacturing for transportation applications. While the precise location of performance is not specified, the contracting entity is based in California, suggesting the equipment will support transit operations within the state. The project requires vendors to deliver fully integrated solutions with documented compliance, testing protocols, and support mechanisms to meet the operational demands of modern electric bus networks.

General Info

Supply and integrate battery electric bus charging systems compliant with federal standards for California transit operations.

Agency

California → Engineering and Program DeliveryView Agency

NAICS

335313 - Switchgear and Switchboard Apparatus ManufacturingView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Engineering and Program Delivery
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and integration of battery electric bus charging units, including pantograph systems, power conversion modules, and software interfaces, compliant with federal standards.

Similar Contracts

Same NAICS industry code

NAICS: 335313
New
DIBBS
Circuit Breaker Supply and ComplianceThe contract calls for the supply of one mercury-free circuit breaker identified by NSN 5925010396651 and Part Number 4976D04G45, ensuring full compliance with all applicable military and federal specifications including DLA technical requirements, MIL-STD-1916, and MIL-STD-129. The item must meet stringent environmental and performance standards to support defense operations, with particular emphasis on the elimination of hazardous substances such as mercury. Delivery is expected to be performed at the designated place of performance in Portsmouth, Virginia, with the zip code 23709-1001, and the contract is classified as a subcontract under NAICS code 335313, which pertains to other electrical equipment and component manufacturing. The solicitation was posted on July 20, 2026, with a firm response deadline of July 31, 2026, leaving a narrow window for prospective suppliers to submit proposals. The contracting authority is the Maritime Supply Chain ESOC Buys unit under the Department of Defense, indicating this requirement is part of a larger defense logistics effort. The contract is accessible via the DIBBS platform, and while no point of contact is listed, all inquiries must be submitted through the official portal prior to the deadline. Compliance with all technical and regulatory mandates is mandatory, and failure to meet specifications could result in rejection of the bid regardless of pricing or delivery terms.
MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details
NAICS: 335313
New
DIBBS
CIRCUIT BREAKERThis contract specifies the procurement of a circuit breaker with part number 4976D04G45 and NSN 5925-01-039-6651, with a single unit requirement to be delivered within five days of contract award. All supplies must strictly comply with the DLA Master List of Technical and Quality Requirements, which override any conflicting commercial standards, and mercury or mercury-containing compounds are prohibited except for specific functional uses such as batteries, fluorescent lamps, sensors, weapon systems, and chemical reagents approved by NAVSEA, with portable devices containing mercury requiring shockproof construction and secondary containment per NAVSEA 5100-003D. Sampling and inspection follow MIL-STD-1916 or ASQ H1331 with zero nonconformances required unless otherwise stated, and attributes are classified with verification levels VII, IV, and II for critical, major, and minor characteristics respectively. Packaging must adhere to MIL-STD-129 and RP001 DLA requirements, with hazardous materials compliant with FED-STD-313 and IP025, while non-hazardous items must meet ASTM D3951 unless superseded by DLA standards. Deliveries are FOB origin to the Norfolk Naval Shipyard in Portsmouth, VA, and must be shipped via the fastest traceable method, excluding parcel post. The required delivery date is July 21, 2026, with all items subject to destination inspection and acceptance, and labeling and unit packaging must conform exactly to the contract's specified Unit of Issue and Quantity per Unit Pack.
MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 10 hours ago

DEADLINE

in 11 days
View Details

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 238210
New
SLED
High-Voltage Electrical Installation for ZEB Charging StationsThe contract involves the installation of medium- and high-voltage electrical infrastructure to enable charging operations for zero-emission battery electric buses, focusing on critical components such as switchgear, transformers, conduits, and utility interconnection systems. This work is essential to support the expansion of public transit electrification in California, ensuring reliable power delivery to multiple charging stations across the network. The scope requires compliance with industry standards for high-voltage installations and integration with existing utility grids to maintain operational safety and efficiency. The contract is classified as a subcontract under NAICS code 238210, which corresponds to Electrical Contractors and Other Wiring Installation Contractors. It was posted on July 15, 2026, with a response deadline of September 25, 2026, providing prospective bidders approximately two months to prepare and submit proposals. The work is being managed under the Engineering and Program Delivery division of the California agency, though specific location details and point of contact information are not provided. All performance activities are expected to take place within California, aligning with broader state initiatives to modernize public transportation infrastructure and reduce emissions.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Procurement for Construction Manager/General Contractor (CMGC), CHABOYA YARD ZERO‑EMISSION BUS (ZEB) CHARGING INFRASTRUCTURE PROJECTThe Valley Transportation Authority (VTA) is seeking a qualified California-licensed General Contractor to serve as Construction Manager/General Contractor (CMGC) for the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project, utilizing the CMGC delivery method as authorized under Public Utilities Code section 100150. The initial contract award will cover Preconstruction Services, including project management, close collaboration with the design consultant, constructability reviews, value engineering, risk assessment, and scheduling optimization to advance the design from 65% PS&E toward final plans. The Preconstruction Phase is limited to 240 calendar days from the Notice to Proceed and will be compensated via a negotiated lump sum fixed fee. Successful completion of preconstruction does not guarantee construction work; Stage 1 and Stage 2 construction services, estimated between $15 million and $20 million, are contingent upon VTA’s approval of a Guaranteed Maximum Price (GMP), Board of Directors authorization, and execution of a contract amendment. A mandatory project deliverable is the installation of medium-voltage switchgear no later than December 31, 2028, with overall project completion targeted for Summer 2029. The Contractor must ensure uninterrupted 24/7 operations at the Chaboya Yard throughout construction and demonstrate experience in BEB charging infrastructure, medium/high-voltage electrical systems, steel canopy structures, and CIDH piles, with two proven projects in each of the first two categories and one in the third. Key personnel must be identified by name, with resumes submitted and approval required for any changes. Subcontractors must meet the same experience thresholds and comply with strict flow-down requirements including prohibitions on covered telecommunications equipment from Huawei, ZTE, Hikvision, Dahua, and other entities tied to the Chinese government, as well as adherence to Buy America, nondiscrimination, anti-human trafficking, and lobbying compliance rules. Proposal evaluation is based on a Best Value approach with five equally weighted factors: qualifications, staffing and organization, work plan and project understanding, proposed schedule and effort, and cost proposal. Proposals must be submitted electronically no later than September 25, 2026, as two separate volumes: a Technical Proposal and a Cost Proposal, with standardized forms completed exactly as templated. Performance is required at 2240 S 7th Street, San Jose, CA 95112, with all work subject to VTA inspection and acceptance, which does not relieve
Power and Communication Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 2 months
View Details