Procurement for Construction Manager/General Contractor (CMGC), CHABOYA YARD ZERO‑EMISSION BUS (ZEB) CHARGING INFRASTRUCTURE PROJECT

Active
C26069State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clara Valley Transportation Authority (VTA) is seeking a California-licensed Construction Manager/General Contractor (CMGC) for the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project. This initiative supports VTA's goal of transitioning to a 100% zero-emission bus fleet by 2040 and involves installing battery electric bus charging infrastructure, including up to 32 overhead inverted pantograph-type dispensers, gantry structures, and necessary electrical service upgrades. The project is estimated to cost between 15 million and 20 million dollars, with a target for overall construction completion and system commissioning in Summer 2029. A critical milestone requires the installation of medium-voltage switchgear by December 31, 2028, to comply with the PG&E EV Fleet Program. The contract is structured in two primary phases. The initial phase consists of Preconstruction Services to be completed within 240 calendar days, during which the contractor will collaborate with VTA's design consultant to perform constructability reviews, value engineering, and risk mitigation. If a Guaranteed Maximum Price (GMP) is successfully negotiated and approved by the VTA Board of Directors, the contract may be amended to authorize construction services. The construction phase is expected to last approximately seven months and must be sequenced to ensure 24/7 operational continuity at the Chaboya Division. The project adheres to Public Utilities Code section 100150, California Building Code seismic requirements, and CARB's Innovative Clean Transit regulations. Selection is based on best value, evaluating qualifications, staffing, work plan, schedule, and cost proposals. The successful contractor must provide performance and payment bonds and comply with California prevailing wage laws, Buy America requirements, and ADA standards. Payment is administered via an open-book arrangement, requiring detailed cost substantiation including payrolls and receipted invoices. The project also requires strict adherence to a Site Management Plan for all underground activities due to environmental deed restrictions.

General Info

VTA seeks CMGC for ZEB charging project with 2028 switchgear deadline, $15M–$20M construction contingent on GMP approval.

Agency

California → Engineering and Program DeliveryView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(9)

Chaboya ZEB Infrastructure Improvements Electrical and Structural Plans

PDFspecifications

CMGC Contract C26069 for Chaboya Yard ZEB Charging Infrastructure Project

PDFcontract-document

Appendix A - Scope of Services for Chaboya Yard ZEB Charging Infrastructure Project

PDFsow

Appendix_B_-_4._PG&E_TTM_Preliminary_Design.pdf

PDF

S23175 VTA Chaboya Division Zero Emission Bus Preliminary Design Report Nov 2025

PDF234 pagespreliminary-design-report

PG&E EV Fleet Electrification Program Contract with Santa Clara VTA

PDFcontract-document

Attachment 1 to Cost Proposal - RFP for CMGC, Chaboya Yard ZEB Charging Infrastructure

XLSXsow

CMGC RFP C26069 Chaboya Yard ZEB Charging Infrastructure Project

PDFrfp

Attachment 1 to Cost Proposal for Chaboya Yard ZEB Charging Infrastructure Project

XLSXcost-proposal

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
Contacts2 people available
OfficeSan Jose, CA, 95134, USA
Organization / Agency
California → Engineering and Program Delivery
View Agency Profile
Office AddressSan Jose, CA, 95134, USA
Contacts
Karmjot SinghAssociate Transportation Engineer
Chris ValleContracts Administrator

Interested Companies (69)

Show more
Pacific Traffic Control
LOS ANGELES, CA
FindBids
Stacy and Witbeck
Portland, OR

See All 69 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
VTA seeks proposals (each a " Proposal ") from qualified firms (each a " Proposer ") to provide services to act as Construction Manager/General Contractor ("CMGC") for the project titled below and further described in the Scope of Services, attached as Appendix A (the " Project "): Chaboya Yard Zero‑Emission Bus (ZEB) Charging Infrastructure Project The purpose of the Proposal is to demonstrate the qualifications, competence and capacity of Proposer to perform preconstruction services and, if a Guaranteed Maximum Price ("GMP") can be agreed upon, to provide CMGC services for construction of the Project, as further described in this RFP, in conformity with the requirements of this RFP. The Proposal should demonstrate the qualifications of the Proposer and of the particular staff to be assigned to this Project. It should also specify a specific approach that will meet the RFP requirements. VTA intends to select and award a contract to a qualified, California-licensed General Contractor that is able to provide appropriately licensed contracting and professional services ("Construction Manager") to collaborate with VTA's retained design consultant ("Designer") and provide Preconstruction Services, as defined below, during development of the Plans, Specifications, and Estimate ("PS&E") for the Project. The project delivery method for this Project is CMGC in accordance with Public Utilities Code section 100150, et. seq. The successful Proposer will be expected to execute the Construction Manager/General Construction Manager Contract ("CMGC Contract" or "Contract") attached to this RFP. VTA intends to award the construction services for the Project to the Successful Proposer after the plans have been sufficiently developed and if a GMP has been successfully negotiated. The Successful Proposer will execute the CMGC Contract for Preconstruction Services, and complete the Preconstruction Services within 240 calendar days after the date VTA issues the Notice to Proceed with the Preconstruction Phase. The scope of Preconstruction Services is contained in Appendix A: Scope of Services . If a GMP is agreed upon, the CMGC contract may be amended to authorize construction services to be completed by the Guaranteed Completion Date(s), as defined in and as shall be established in accordance with the CMGC Contract. The Successful Proposer awarded the Contract, if any, is referred to as the " Contractor" or "Construction Manager ". CMGC is being used to manage cost and risk, accelerate delivery, and support features not feasible under traditional Design‑Bid‑Build. Specific Project goals and objectives include: Meet the Project delivery schedule for Stage 1 Construction Services. As part of the PG&E's EV Fleet Program that this Project is participating in, the medium‑voltage switchgear shall be installed no later than December 31, 2028; overall construction completion and system commissioning are targeted for Summer 2029. Deliver a high‑quality Project within the established construction budget (currently estimated between $15,000,000 - $20,000,000). Maintain Chaboya Division operations and maintenance throughout construction, including 24/7-yard access. Foster an effective partnership among VTA, Construction Manager, the Designer, and all stakeholders. The Construction Manager will work together with representatives from VTA's Engineering & Program Delivery ("EPD") Division, VTA Operations Division, and the Designer. This collaborative approach is designed to foster inclusion and generate an efficient progression of the pre-construction services to construction. The Construction Manager will provide VTA and the Designer with expertise and experience assisting in decision-making; conducting constructability reviews; presenting and assessing design and construction phasing and schedule recommendations and innovations to meet the Project schedule and budget requirements; supporting and participating in optional, formal value engineering (VE) workshops; providing innovative Project delivery approaches; analyzing innovation or VE proposals and providing potential design and construction-related modifications, if proposed; supporting scope, budget, and schedule control (generally, the "Preconstruction Services"). VTA seeks assistance in ensuring that the design allows for economical and efficient methods of construction incorporating the most current and cost-effective technology with minimal disruption to yard operations. VTA intends to select a Construction Manager who can best provide the Preconstruction Services needed to achieve these objectives, and who can best complete the Project in accordance with VTA's requirements. The Project has completed the Basis of Design report and 35% Preliminary Engineering drawing set, with selected components currently advancing to 65% PS&E. The Construction Manager shall collaborate with the Designer during the Preconstruction Services to optimize the design documents to incorporate the Construction Manager's recommended construction means and methods, provide continuous value engineering, continuously assess Project risks and develop mitigation measures, and optimize the construction phasing and schedule. The Preconstruction Services are described in detail in Appendix A: Scope of Services. The Preconstruction Services to be provided to VTA by Construction Manager consist of the following: • Task 1 – Project Management and Coordination • Task 2 – Preconstruction Services Designer Collaboration Task 3 may be authorized by written amendment, at VTA's sole discretion, following approval of the applicable design and specifications and acceptance of an agreed upon price for the task. • Task 3 – Procurement of Long-Lead Items If any Construction Services required to complete the Project are identified in Task 4 and Task 5. • Task 4 – Delivery of Construction Phase Stage 1 Construction Services • Task 5 – Delivery of Construction Phase Stage 2 Construction Services Early construction packages may be issued to maintain overall schedule, including procurement of long‑lead items (e.g., medium‑voltage switchgear, transformers, charging cabinets, overhead pantograph dispensers). The initial contract award will be limited to Preconstruction Services (Tasks 1 and 2), based on a negotiated lump sum fixed fee. Authorization of Stage 1 or Stage 2 Construction Services is contingent on negotiation of a GMP, approval by VTA's Board of Directors, and an amendment to authorize such services under the CMGC Contract is executed by both parties. Any decision to proceed with construction services will be in VTA's sole discretion. Stage 2 Construction Services (Task 5) is further subject to funding availability. This RFP neither commits VTA to enter into such Contract nor obligates VTA to pay for costs incurred in preparation or submission of Proposals or in anticipation of entry into a Contract. In the event that a GMP is not negotiated, VTA may award a contract for construction services utilizing any other procurement method authorized by law.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, intends to issue a Request for Proposal for the Power Construction and Services II (PCS II) Multiple-Award Task Order Contract (MATOC). This firm-fixed-price IDIQ contract will support power construction and services in contingency or austere environments for the US Government, Coalition Forces, and Host-Nation Governments. The scope of work covers the United States Central Command Area of Responsibility (CENTCOM AOR) and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The contract will have a total shared capacity of 249,000,000 dollars, with a target of three to seven awards to a pool of contractors who will then compete for individual task orders. The contract features a five-year ordering period with a six-month extension option under FAR 52.217-8. Task orders may include the construction of low and medium voltage electrical systems for power plants and distribution, as well as power-as-a-service activities such as assessing power needs, operating and maintaining generator sets, and providing technical training. This is a full and open competition under NAICS 237130, and awards will be based on a Best Value Trade-off process evaluating technical approach, past performance, and price. The solicitation is expected to be issued around September 14, 2026, via SAM.gov and the PIEE Solicitation Module, with proposals due at least 30 days after issuance.
W2SD Endist Philadelphia

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
Federal
CJAG Underground Utilities Construction
Solicitation # W9136426QA076
Solicitation W91364-26-Q-A076 is a 100% small business set-aside for the construction of underground utilities at the Load Line 6 area of Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project, valued between $500,000 and $1,000,000, involves the installation of approximately 9,900 linear feet of open-cut trenching, 60 linear feet of dual-wall fuel lines with four termination points, and 500 linear feet of grounding rods. The scope also includes electrical and communications conduit routes, concrete-encased roadway crossings, pull boxes, backfill, compaction, and stone-road restoration. All work must be completed within a 60-day period of performance following the notice to proceed. The government will award a firm-fixed-price purchase order based on a best-value determination, evaluating quotations for technical acceptability, relevant past performance in medium-voltage electrical or distribution infrastructure, and price reasonableness. Offerors must provide a bid guarantee with their submission and are required to furnish performance and payment bonds within 10 days of receiving the order. Key deliverables include a Quality Control Plan due within 10 days of award, material submittals, and final as-built documentation. Quotations are due by September 24, 2026, at 10:00 AM EDT, and must be submitted electronically to the designated point of contact.
W7NU Uspfo Activity Oh Arng

POSTED

1 day ago

DEADLINE

in 12 days
View Details

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 541330
SLED
I-280 Comprehensive Multimodal Corridor Plan
Solicitation # S26117
The Santa Clara Valley Transportation Authority (VTA) is soliciting proposals for the I-280 Comprehensive Multimodal Corridor Plan (CMCP) for I-280/Winchester. This project serves as an update to the October 2017 I-280 Corridor Study and aims to identify transportation improvements that relieve congestion, enhance safety, and improve operations. A critical requirement of the plan is to ensure that identified improvements are VMT neutral, meaning they must either reduce or not cumulatively increase Vehicle Miles Traveled. The selected contractor will provide engineering services to develop technical memoranda, conduct corridor traffic analysis, and ensure compliance with the December 2025 California Transportation Commission guidelines, as well as Caltrans and Federal Highway Administration standards. The contract is structured as a cost-plus-fixed-fee agreement with a primary performance period of six months, and a VTA option to extend for an additional six months. Compensation includes reimbursement for direct and indirect labor, subcontractor costs, and other direct costs, with a negotiated fixed fee of 10 percent per invoice. Award selection is based on a best-value process, evaluating qualifications, staffing, and work plan approach without initial pricing. Preference is given to local firms, with specific point awards for the percentage of work performed locally. The contractor must also adhere to strict quality management standards, including an independent Quality Assurance/Quality Control Manager and a formal Quality Management Plan. Proposals are due by September 18, 2026, via the VTA procurement portal.
Engineering Services

POSTED

25 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS