Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Procurement for Construction Manager/General Contractor (CMGC), CHABOYA YARD ZERO‑EMISSION BUS (ZEB) CHARGING INFRASTRUCTURE PROJECT

Closed
C26069State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 18 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Santa Clara Valley Transportation Authority (VTA) is seeking a California-licensed Construction Manager/General Contractor (CMGC) for the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project. This initiative supports VTA's goal of transitioning to a 100% zero-emission bus fleet by 2040. The project involves installing battery electric bus charging infrastructure, including up to 32 overhead inverted pantograph-type dispensers (expandable to 55), gantry structures, and necessary electrical service upgrades. The estimated construction budget is between $15 million and $20 million, with a target for overall completion and system commissioning in Summer 2029. A critical milestone requires the installation of medium-voltage switchgear by December 31, 2028, to comply with the PG&E EV Fleet Program. The project is structured in two primary phases. The initial award is limited to Preconstruction Services, which must be completed within 240 calendar days. During this phase, the CMGC will collaborate with VTA's design consultant to perform constructability reviews, value engineering, and risk mitigation to optimize the design and establish a Guaranteed Maximum Price (GMP). If a GMP is successfully negotiated and approved by the VTA Board of Directors, the contract may be amended to authorize the construction phases. The CMGC must ensure that all work is sequenced to maintain 24/7 yard operations and maintenance activities. Selection is based on a best-value approach, evaluating qualifications, staffing, work plan, schedule, and cost proposals. The contract requires compliance with various regulatory standards, including the California Building Code, Buy America requirements, and prevailing wage laws.

General Info

VTA seeks a CMGC for ZEB charging infrastructure project, budget $15-20 million, completion 2029.

Documents

9

Appendix A - Scope of Services for Chaboya Yard ZEB Charging Infrastructure Project

PDF, High priority: read this firstsow
High

Attachment 1 to Cost Proposal for Chaboya Yard ZEB Charging Infrastructure Project

XLSX, High priority: read this firstcost-proposal
High

Attachment 1 to Cost Proposal - RFP for CMGC, Chaboya Yard ZEB Charging Infrastructure

XLSX, High priority: read this firstsow
High

Chaboya ZEB Infrastructure Improvements Electrical and Structural Plans

PDF, High priority: read this firstspecifications
High

CMGC Contract C26069 for Chaboya Yard ZEB Charging Infrastructure Project

PDF, High priority: read this firstcontract-document
High

CMGC RFP C26069 Chaboya Yard ZEB Charging Infrastructure Project

PDF, High priority: read this firstrfp
High

PG&E EV Fleet Electrification Program Contract with Santa Clara VTA

PDF, High priority: read this firstcontract-document
High

S23175 VTA Chaboya Division Zero Emission Bus Preliminary Design Report Nov 2025

PDF, High priority: read this first234 pages · preliminary-design-report
High

Appendix_B_-_4._PG&E_TTM_Preliminary_Design.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
Contacts2 people available
OfficeSan Jose, CA, 95134, USA
Office AddressSan Jose, CA, 95134, USA
Contacts
Karmjot SinghAssociate Transportation Engineer
Chris ValleContracts Administrator

Interested Companies (69)

Pacific Traffic ControlLOS ANGELES, CA
FindBids
Stacy and WitbeckAlameda, CA

See All 69 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
VTA seeks proposals (each a " Proposal ") from qualified firms (each a " Proposer ") to provide services to act as Construction Manager/General Contractor ("CMGC") for the project titled below and further described in the Scope of Services, attached as Appendix A (the " Project "): Chaboya Yard Zero‑Emission Bus (ZEB) Charging Infrastructure Project The purpose of the Proposal is to demonstrate the qualifications, competence and capacity of Proposer to perform preconstruction services and, if a Guaranteed Maximum Price ("GMP") can be agreed upon, to provide CMGC services for construction of the Project, as further described in this RFP, in conformity with the requirements of this RFP. The Proposal should demonstrate the qualifications of the Proposer and of the particular staff to be assigned to this Project. It should also specify a specific approach that will meet the RFP requirements. VTA intends to select and award a contract to a qualified, California-licensed General Contractor that is able to provide appropriately licensed contracting and professional services ("Construction Manager") to collaborate with VTA's retained design consultant ("Designer") and provide Preconstruction Services, as defined below, during development of the Plans, Specifications, and Estimate ("PS&E") for the Project. The project delivery method for this Project is CMGC in accordance with Public Utilities Code section 100150, et. seq. The successful Proposer will be expected to execute the Construction Manager/General Construction Manager Contract ("CMGC Contract" or "Contract") attached to this RFP. VTA intends to award the construction services for the Project to the Successful Proposer after the plans have been sufficiently developed and if a GMP has been successfully negotiated. The Successful Proposer will execute the CMGC Contract for Preconstruction Services, and complete the Preconstruction Services within 240 calendar days after the date VTA issues the Notice to Proceed with the Preconstruction Phase. The scope of Preconstruction Services is contained in Appendix A: Scope of Services . If a GMP is agreed upon, the CMGC contract may be amended to authorize construction services to be completed by the Guaranteed Completion Date(s), as defined in and as shall be established in accordance with the CMGC Contract. The Successful Proposer awarded the Contract, if any, is referred to as the " Contractor" or "Construction Manager ". CMGC is being used to manage cost and risk, accelerate delivery, and support features not feasible under traditional Design‑Bid‑Build. Specific Project goals and objectives include: Meet the Project delivery schedule for Stage 1 Construction Services. As part of the PG&E's EV Fleet Program that this Project is participating in, the medium‑voltage switchgear shall be installed no later than December 31, 2028; overall construction completion and system commissioning are targeted for Summer 2029. Deliver a high‑quality Project within the established construction budget (currently estimated between $15,000,000 - $20,000,000). Maintain Chaboya Division operations and maintenance throughout construction, including 24/7-yard access. Foster an effective partnership among VTA, Construction Manager, the Designer, and all stakeholders. The Construction Manager will work together with representatives from VTA's Engineering & Program Delivery ("EPD") Division, VTA Operations Division, and the Designer. This collaborative approach is designed to foster inclusion and generate an efficient progression of the pre-construction services to construction. The Construction Manager will provide VTA and the Designer with expertise and experience assisting in decision-making; conducting constructability reviews; presenting and assessing design and construction phasing and schedule recommendations and innovations to meet the Project schedule and budget requirements; supporting and participating in optional, formal value engineering (VE) workshops; providing innovative Project delivery approaches; analyzing innovation or VE proposals and providing potential design and construction-related modifications, if proposed; supporting scope, budget, and schedule control (generally, the "Preconstruction Services"). VTA seeks assistance in ensuring that the design allows for economical and efficient methods of construction incorporating the most current and cost-effective technology with minimal disruption to yard operations. VTA intends to select a Construction Manager who can best provide the Preconstruction Services needed to achieve these objectives, and who can best complete the Project in accordance with VTA's requirements. The Project has completed the Basis of Design report and 35% Preliminary Engineering drawing set, with selected components currently advancing to 65% PS&E. The Construction Manager shall collaborate with the Designer during the Preconstruction Services to optimize the design documents to incorporate the Construction Manager's recommended construction means and methods, provide continuous value engineering, continuously assess Project risks and develop mitigation measures, and optimize the construction phasing and schedule. The Preconstruction Services are described in detail in Appendix A: Scope of Services. The Preconstruction Services to be provided to VTA by Construction Manager consist of the following: • Task 1 – Project Management and Coordination • Task 2 – Preconstruction Services Designer Collaboration Task 3 may be authorized by written amendment, at VTA's sole discretion, following approval of the applicable design and specifications and acceptance of an agreed upon price for the task. • Task 3 – Procurement of Long-Lead Items If any Construction Services required to complete the Project are identified in Task 4 and Task 5. • Task 4 – Delivery of Construction Phase Stage 1 Construction Services • Task 5 – Delivery of Construction Phase Stage 2 Construction Services Early construction packages may be issued to maintain overall schedule, including procurement of long‑lead items (e.g., medium‑voltage switchgear, transformers, charging cabinets, overhead pantograph dispensers). The initial contract award will be limited to Preconstruction Services (Tasks 1 and 2), based on a negotiated lump sum fixed fee. Authorization of Stage 1 or Stage 2 Construction Services is contingent on negotiation of a GMP, approval by VTA's Board of Directors, and an amendment to authorize such services under the CMGC Contract is executed by both parties. Any decision to proceed with construction services will be in VTA's sole discretion. Stage 2 Construction Services (Task 5) is further subject to funding availability. This RFP neither commits VTA to enter into such Contract nor obligates VTA to pay for costs incurred in preparation or submission of Proposals or in anticipation of entry into a Contract. In the event that a GMP is not negotiated, VTA may award a contract for construction services utilizing any other procurement method authorized by law.

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 237310
New
SLED
US 101 Express Lanes Phase 5
Solicitation # C26031F
The US 101 Express Lanes Phase 5 project, solicitation C26031F, is a construction contract issued by the Santa Clara Valley Transportation Authority (VTA) to convert existing High Occupancy Vehicle (HOV) lanes into a dual express lane system. The project spans approximately 11 miles along US 101 from the US 101/SR 237 interchange in Sunnyvale to the Taylor Road Interchange in San Jose, passing through the cities of San Jose, Santa Clara, Sunnyvale, and Mountain View. Key construction activities include adding a second express lane in both directions, roadway widening, drainage construction, and the installation of tolling infrastructure. The work is estimated to take place between November 2026 and June 2031, with a total estimated construction cost within the right-of-way of 170.6 million dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price submitted on Bid Form 1B. Bidders must comply with several regulatory requirements, including a 7.8 percent Disadvantaged Business Enterprise (DBE) participation goal, Buy America certifications, and California Labor Code prevailing wage requirements. Technical specifications mandate adherence to Caltrans Highway Design Manual standards and the Americans with Disabilities Act (ADA). The scope of work is supported by extensive geotechnical and foundation reports for multiple retaining walls, FAA determinations for temporary mobile cranes, and encroachment permits from local municipalities. Bids are due by 2:00 p.m. Pacific Time on October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details
NAICS: 811192
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This initiative involves the removal and replacement of the existing light rail vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The comprehensive scope of work includes civil and trackwork, electrical upgrades, plumbing, the installation of industrial wash equipment with water reclamation and filtration, and the construction of a prefabricated canopy structure. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, firms must be approved through a rigorous pre-qualification process. Bidders are required to submit a Statement of Qualifications and a completed qualification questionnaire via the OpenGov portal by October 30, 2026, at 2:00 pm PT. Mandatory requirements include a California contractor's license with at least 10 years of experience as a Class A or B General Contractor, as well as registration with the California Department of Industrial Relations. Evaluation is based on essential requirements, organizational performance, and project experience, with specific minimum scoring thresholds and potential interviews required for qualification. Additional mandates include maintaining liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, and providing a notarized statement of sufficient bonding capacity from an admitted surety insurer. Because the work occurs in an active light rail environment and involves the agency's only wash facility, the selected contractor must adhere to strict safety procedures and coordinate closely with the authority to minimize operational disruptions.
Car Washes

POSTED

8 days ago

DEADLINE

in 3 days
View Details
NAICS: 238210
SLED
Cerone Security Enhancements
Solicitation # C26102
The Santa Clara Valley Transportation Authority (VTA) is soliciting bids for solicitation number C26102, titled Cerone Security Enhancements. This construction project involves comprehensive security upgrades at the Cerone main entrance, including the installation of 10-foot chain link fencing, vehicular swing gates, manual and pedestrian gates, and electronic security systems such as card readers, intercoms, and CCTV cameras. The scope of work also encompasses the necessary electrical infrastructure, communications integration, and demolition of existing asphalt concrete pavement. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price submitted on Bid Form 1B. The project is classified as public work under Section 1720 of the California Labor Code, requiring the payment of prevailing wages. Bidders must maintain active registration in the System for Award Management (SAM) and comply with Buy America requirements and VTA's Business Development Program for Small Business Enterprises (SBE). Technical requirements include adherence to NFPA 70 and NFPA 70E standards, with specific mandates for NEMA-rated enclosures and strict packaging and labeling protocols for fiber optic cables. Bids must be submitted electronically via the VTA Procurement Website by the deadline of September 17, 2026, at 2:00 PM Pacific Time.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

14 days ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
SLED
Pre-Qualification: Guadalupe Division - Guard House
Solicitation # C26146F Pre-Qual
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C26146F, the Guadalupe Division Guard House project. This effort is a mandatory preliminary step to establish a list of qualified bidders for a subsequent Invitation for Bids. The project involves the installation of a pre-fabricated guard house at the Younger Avenue entrance, including a base bid for road expansion, a concrete slab, electrical and data utilities, guard gates, bollards, CCTV, exterior lighting, and accessible walkways. An optional component includes the procurement and installation of the guard house itself along with water and sewer connections. The estimated contract value ranges from 591,000 dollars for the base bid to 1.85 million dollars including Option 1, with an estimated construction duration of 267 calendar days. To be eligible, bidders must hold a California contractor's license with classifications Class B, C-10, C-7, and C-36, though specialty requirements may be met through licensed subcontractors. The pre-qualification process requires the submission of a completed questionnaire, a Statement of Qualification Certification Form, audited financial statements, and notarized bonding information. Evaluation is based on a pass/fail assessment of essential requirements and a scoring system for project experience and interviews, where a minimum score of 55 is required to avoid disqualification. Because the project is federally funded, all materials must comply with Buy America provisions. The response deadline for pre-qualification is November 30, 2026, with the final bid opening anticipated for January 2027.
Commercial and Institutional Building Construction

POSTED

18 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS