Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Procurement for Construction Manager/General Contractor (CMGC), CHABOYA YARD ZERO‑EMISSION BUS (ZEB) CHARGING INFRASTRUCTURE PROJECT

Active
C26069State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Valley Transportation Authority (VTA) is seeking a qualified California-licensed General Contractor to serve as Construction Manager/General Contractor (CMGC) for the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project, utilizing the CMGC delivery method as authorized under Public Utilities Code section 100150. The initial contract award will cover Preconstruction Services, including project management, close collaboration with the design consultant, constructability reviews, value engineering, risk assessment, and scheduling optimization to advance the design from 65% PS&E toward final plans. The Preconstruction Phase is limited to 240 calendar days from the Notice to Proceed and will be compensated via a negotiated lump sum fixed fee. Successful completion of preconstruction does not guarantee construction work; Stage 1 and Stage 2 construction services, estimated between $15 million and $20 million, are contingent upon VTA’s approval of a Guaranteed Maximum Price (GMP), Board of Directors authorization, and execution of a contract amendment. A mandatory project deliverable is the installation of medium-voltage switchgear no later than December 31, 2028, with overall project completion targeted for Summer 2029. The Contractor must ensure uninterrupted 24/7 operations at the Chaboya Yard throughout construction and demonstrate experience in BEB charging infrastructure, medium/high-voltage electrical systems, steel canopy structures, and CIDH piles, with two proven projects in each of the first two categories and one in the third. Key personnel must be identified by name, with resumes submitted and approval required for any changes. Subcontractors must meet the same experience thresholds and comply with strict flow-down requirements including prohibitions on covered telecommunications equipment from Huawei, ZTE, Hikvision, Dahua, and other entities tied to the Chinese government, as well as adherence to Buy America, nondiscrimination, anti-human trafficking, and lobbying compliance rules. Proposal evaluation is based on a Best Value approach with five equally weighted factors: qualifications, staffing and organization, work plan and project understanding, proposed schedule and effort, and cost proposal. Proposals must be submitted electronically no later than September 25, 2026, as two separate volumes: a Technical Proposal and a Cost Proposal, with standardized forms completed exactly as templated. Performance is required at 2240 S 7th Street, San Jose, CA 95112, with all work subject to VTA inspection and acceptance, which does not relieve

General Info

VTA seeks CMGC for ZEB charging project with 2028 switchgear deadline, $15M–$20M construction contingent on GMP approval.

Agency

California → Engineering and Program DeliveryView Agency

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(8)

Chaboya ZEB Infrastructure Improvements Electrical and Structural Plans

PDFspecifications

CMGC Contract C26069 for Chaboya Yard ZEB Charging Infrastructure Project

PDFcontract-document

Appendix A - Scope of Services for Chaboya Yard ZEB Charging Infrastructure Project

PDFsow

Appendix_B_-_4._PG&E_TTM_Preliminary_Design.pdf

PDF

S23175 VTA Chaboya Division Zero Emission Bus Preliminary Design Report Nov 2025

PDFpreliminary-design-report

PG&E EV Fleet Electrification Program Contract with Santa Clara VTA

PDFcontract-document

CMGC RFP C26069 Chaboya Yard ZEB Charging Infrastructure Project

PDFrfp

Attachment 1 to Cost Proposal for Chaboya Yard ZEB Charging Infrastructure Project

XLSXcost-proposal

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
Contacts2 people available
OfficeSan Jose, CA, 95134, US
Organization / Agency
California → Engineering and Program Delivery
View Agency Profile
Office AddressSan Jose, CA, 95134, US
Contacts
Karmjot SinghAssociate Transportation Engineer
Chris ValleContracts Administrator

Interested Companies (4)

Show more
Virginkar and Associates
Siemens SI IIS
Balfour Beatty Infrastructure
La Verne, CO

See All 4 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
VTA seeks proposals (each a " Proposal ") from qualified firms (each a " Proposer ") to provide services to act as Construction Manager/General Contractor ("CMGC") for the project titled below and further described in the Scope of Services, attached as Appendix A (the " Project "): Chaboya Yard Zero‑Emission Bus (ZEB) Charging Infrastructure Project The purpose of the Proposal is to demonstrate the qualifications, competence and capacity of Proposer to perform preconstruction services and, if a Guaranteed Maximum Price ("GMP") can be agreed upon, to provide CMGC services for construction of the Project, as further described in this RFP, in conformity with the requirements of this RFP. The Proposal should demonstrate the qualifications of the Proposer and of the particular staff to be assigned to this Project. It should also specify a specific approach that will meet the RFP requirements. VTA intends to select and award a contract to a qualified, California-licensed General Contractor that is able to provide appropriately licensed contracting and professional services ("Construction Manager") to collaborate with VTA's retained design consultant ("Designer") and provide Preconstruction Services, as defined below, during development of the Plans, Specifications, and Estimate ("PS&E") for the Project. The project delivery method for this Project is CMGC in accordance with Public Utilities Code section 100150, et. seq. The successful Proposer will be expected to execute the Construction Manager/General Construction Manager Contract ("CMGC Contract" or "Contract") attached to this RFP. VTA intends to award the construction services for the Project to the Successful Proposer after the plans have been sufficiently developed and if a GMP has been successfully negotiated. The Successful Proposer will execute the CMGC Contract for Preconstruction Services, and complete the Preconstruction Services within 240 calendar days after the date VTA issues the Notice to Proceed with the Preconstruction Phase. The scope of Preconstruction Services is contained in Appendix A: Scope of Services . If a GMP is agreed upon, the CMGC contract may be amended to authorize construction services to be completed by the Guaranteed Completion Date(s), as defined in and as shall be established in accordance with the CMGC Contract. The Successful Proposer awarded the Contract, if any, is referred to as the " Contractor" or "Construction Manager ". CMGC is being used to manage cost and risk, accelerate delivery, and support features not feasible under traditional Design‑Bid‑Build. Specific Project goals and objectives include: Meet the Project delivery schedule for Stage 1 Construction Services. As part of the PG&E's EV Fleet Program that this Project is participating in, the medium‑voltage switchgear shall be installed no later than December 31, 2028; overall construction completion and system commissioning are targeted for Summer 2029. Deliver a high‑quality Project within the established construction budget (currently estimated between $15,000,000 - $20,000,000). Maintain Chaboya Division operations and maintenance throughout construction, including 24/7-yard access. Foster an effective partnership among VTA, Construction Manager, the Designer, and all stakeholders. The Construction Manager will work together with representatives from VTA's Engineering & Program Delivery ("EPD") Division, VTA Operations Division, and the Designer. This collaborative approach is designed to foster inclusion and generate an efficient progression of the pre-construction services to construction. The Construction Manager will provide VTA and the Designer with expertise and experience assisting in decision-making; conducting constructability reviews; presenting and assessing design and construction phasing and schedule recommendations and innovations to meet the Project schedule and budget requirements; supporting and participating in optional, formal value engineering (VE) workshops; providing innovative Project delivery approaches; analyzing innovation or VE proposals and providing potential design and construction-related modifications, if proposed; supporting scope, budget, and schedule control (generally, the "Preconstruction Services"). VTA seeks assistance in ensuring that the design allows for economical and efficient methods of construction incorporating the most current and cost-effective technology with minimal disruption to yard operations. VTA intends to select a Construction Manager who can best provide the Preconstruction Services needed to achieve these objectives, and who can best complete the Project in accordance with VTA's requirements. The Project has completed the Basis of Design report and 35% Preliminary Engineering drawing set, with selected components currently advancing to 65% PS&E. The Construction Manager shall collaborate with the Designer during the Preconstruction Services to optimize the design documents to incorporate the Construction Manager's recommended construction means and methods, provide continuous value engineering, continuously assess Project risks and develop mitigation measures, and optimize the construction phasing and schedule. The Preconstruction Services are described in detail in Appendix A: Scope of Services. The Preconstruction Services to be provided to VTA by Construction Manager consist of the following: • Task 1 – Project Management and Coordination • Task 2 – Preconstruction Services Designer Collaboration Task 3 may be authorized by written amendment, at VTA's sole discretion, following approval of the applicable design and specifications and acceptance of an agreed upon price for the task. • Task 3 – Procurement of Long-Lead Items If any Construction Services required to complete the Project are identified in Task 4 and Task 5. • Task 4 – Delivery of Construction Phase Stage 1 Construction Services • Task 5 – Delivery of Construction Phase Stage 2 Construction Services Early construction packages may be issued to maintain overall schedule, including procurement of long‑lead items (e.g., medium‑voltage switchgear, transformers, charging cabinets, overhead pantograph dispensers). The initial contract award will be limited to Preconstruction Services (Tasks 1 and 2), based on a negotiated lump sum fixed fee. Authorization of Stage 1 or Stage 2 Construction Services is contingent on negotiation of a GMP, approval by VTA's Board of Directors, and an amendment to authorize such services under the CMGC Contract is executed by both parties. Any decision to proceed with construction services will be in VTA's sole discretion. Stage 2 Construction Services (Task 5) is further subject to funding availability. This RFP neither commits VTA to enter into such Contract nor obligates VTA to pay for costs incurred in preparation or submission of Proposals or in anticipation of entry into a Contract. In the event that a GMP is not negotiated, VTA may award a contract for construction services utilizing any other procurement method authorized by law.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Solar Construction on New BuildingThis solicitation, numbered 1232SA26Q0880, is a combined synopsis and request for quotation for the installation of a new 12.47 kV solar array on the rooftop of an existing building at the Southwest Watershed Research Center in Tucson, Arizona, with associated patch and repair work to the roof membrane. The procurement is structured as a Total Small Business Set-Aside under NAICS code 237130, with a small business size standard of $45 million, and is open only to responsible small business concerns. The contract will be awarded using the Lowest Priced Technically Acceptable methodology, with technical acceptability, past performance, submission completeness, and amendment acknowledgment serving as mandatory pass/fail gates. Failure to meet any of these criteria renders an offer non-responsive. The scope includes full electrical installation to the existing transformer, project management, quality control, and compliance with stringent environmental, safety, and labor standards. All materials must be delivered in unopened manufacturer-sealed containers with clear labeling, and equipment must be affixed with official manufacturer nameplates—not those of distributors—while field-fabricated nameplates must adhere to specific ASTM D709 standards for thickness, finish, and lettering. Performance is expected over a 200-calendar-day period from the Notice to Proceed, with final acceptance contingent on successful punch-out, pre-final, and final inspections attended by designated contractor and government personnel. The offeror must submit an SF 1442, a summary cover letter with SAM UEI and TIN, and all attachments, including the Statement of Work, project specifications, PV drawings, a pricing schedule, and the applicable wage determination for Arizona. Compliance with labor standards is mandatory under the Davis-Bacon Act, requiring certified payroll records and adherence to the AZ20260040 wage determination. The Contractor must also maintain an on-site superintendent with five years of relevant experience and familiarity with EM 385-1-1 safety protocols, appoint a formally designated Site Safety and Health Officer, and submit a Site-Specific Safety Plan within ten days of award. Insurance and performance and payment bonds as required by FAR 52.228-15 are mandatory, and bid bonds using SF 24 from a Treasury-listed surety are required due to the project’s value exceeding $35,000. All pricing must remain firm for 90 days post-submission deadline, and invoices must
USDA Ars Afm Apd

POSTED

about 15 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237130
New
SLED
Packaged SubstationPublic Utility District No. 1 of Lewis County is soliciting bids for a packaged substation including all associated equipment and delivery as specified in Exhibit C, with the project scoped for Phase 1 only and requiring the entire system to fit within a 294'x144' fence while complying with NESC code and referencing design standards JH-E-100 and JH-C-101 to 110. The substation must include transmission and distribution equipment such as circuit breakers, potential transformers, disconnect switches, bus conductors, insulators, ground grid, conduit, control enclosure, and foundation designs for all steel structures. Deliverables are split into two shipping packages: Package 1 containing anchor bolts, templates, and foundation drawings must be delivered by April 30, 2027, to 124 Habein Rd, Chehalis, WA, and Package 2 with steel structures, pipe bus, switches, and components by July 16, 2027, to 2844 Jackson Hwy, Chehalis, WA, with final delivery of the complete system required on or before February 2028. All equipment must be packaged to prevent damage, labeled with the purchase order number on every document and container, accompanied by packing lists and MSDS for hazardous materials, and shipped F.O.B. destination with risk of loss transferring upon district acceptance. Bids must be submitted by August 4, 2026, in sealed physical form to 321 N.W. Pacific Avenue, Chehalis, WA, via the procurement system, with electronic submissions allowed only through the portal and no faxes, emails, or informal quotes accepted. The solicitation requires submission of the vendor bid form, detailed bid data spreadsheet, and optional alternates on separate sheets. For bids totaling $120,000 or more, a bid guarantee of five percent of the bid amount is required, and awardees must furnish a ten percent performance bond within ten business days, acceptable as certified check, cashier’s check, irrevocable letter of credit, performance bond, or savings account assignment issued by a Washington-admitted insurer with a Best’s Rating of A-, Class VII or better. The contractor must maintain general liability insurance of $1,000,000 per occurrence and $2,000,000 general aggregate, workers’ compensation as required by law, and automobile
Public Utility District No. 1 of Lewis County

POSTED

3 days ago

DEADLINE

in 30 days
View Details
NAICS: 237130
New
SLED
IFB 2026-01 Fork Union Community Center Generator ProjectThe Offeror is responsible for delivering a complete turnkey solution for the Transitional Shelter generator project at the Fork Union Community Center in Virginia, encompassing all labor, materials, equipment, and services required from procurement to final commissioning. This includes ordering and delivering the generator, pouring and preparing a concrete pad, securing all necessary building code inspections, coordinating Dominion Power downtime, excavating and trenching for electrical conduits, burying and protecting wiring, restoring the site with seeding and recovery, terminating all electrical connections, and performing comprehensive testing to ensure full operational functionality. The Offeror must also provide hands-on operational training for Fluvanna County staff to ensure proper and safe use of the system. All work must be completed in accordance with local and state regulations, including compliance with VA 811 utility location requirements and proper coordination with utility providers. The solicitation, identified as IFB-2026-01 with reference number IFB-124625, was posted on July 17, 2026, and responses are due by August 4, 2026. The project is managed by Fluvanna County through the Virginia state government, with Linda Mills as the point of contact for inquiries. Performance is required at the Fork Union Community Center located at 5725 James Madison Highway, Fork Union, VA 23055, and the successful bidder must be prepared to manage every aspect of the project from start to finish with full accountability for timelines, quality, and regulatory compliance.
Fluvanna County

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
Federal
U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRIDThis procurement, identified as solicitation W9123826RA016, is a total small business set-aside under NAICS code 237130 with a size standard of $45,000,000 for the U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid project located in Mountain View, California. The objective is to design, install, and commission a fully operational microgrid system capable of providing 14 or more days of energy resilience for mission-critical functions at the reserve center. The system includes a 750kW ground-mounted photovoltaic solar array, a 750kWh battery energy storage system, an 800kW diesel backup generation unit with a 10,000-gallon fuel storage tank, a master microgrid controller, and automatic smart switches to manage power distribution. The microgrid must operate autonomously in island mode, seamlessly connect to and disconnect from the utility grid, and be installed on a closed restricted network requiring an Authority to Operate under DODI 8510.01 with cybersecurity design aligned to UFC 4-010-06. All proposals must be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE) by July 31, 2026, at 7:00 PM PDT, following strict formatting guidelines that require two separate volumes: a technical volume limited to 15 pages and a price volume containing the SF 1442 and supporting documentation. Offerors and subcontractors must be actively registered in both SAM.gov and PIEE, with registration completed at least one week prior to the solicitation release. Proposals will be evaluated using the Lowest Price Technically Acceptable method, with technical acceptability determined by past performance and schedule narrative, and a firm fixed-price contract is anticipated. No contract award will be made until appropriated funds become available, as noted under FAR 52.232-18. Liquidated damages of $3,100 per calendar day of delay for construction are specified, and the period of performance is set at 732 days from notice to proceed. Key compliance requirements include adherence to MIL-STD-161 for piping and tank marking, use of NATO symbol F-34 for JP-8, mandatory manufacturer nameplates with serial and model numbers, compliance with ASTM D709 for field-fabric
W075 Endist San Fran

POSTED

4 days ago

DEADLINE

in 11 days
View Details
NAICS: 237130
New
Federal
Tower Maintenance IDIQ Radar Operations CenterThe U.S. Department of Commerce, NOAA, is seeking to establish a five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract for comprehensive maintenance services supporting the Next Generation Weather Radar (NEXRAD) WSR-88D radar tower network, exclusively set aside for small businesses under FAR 19.5. The contract will be awarded through three contract line items: CLIN 0001 for tower inspection and engineering evaluations, CLIN 0002 for structural repair, replacement, and galvanic coating restoration, and CLIN 0003 for engineering data and change proposals related to tower coatings. All work will be performed across 160 designated WSR-88D tower sites nationwide, with the primary point of coordination based in Norman, Oklahoma. Offerors must submit a complete proposal package including Volume I (Price Quote), Volume II (Technical Proposal), and Volume III (Past Performance) as detailed in Section L, with failure to provide all required documentation resulting in a nonresponsive submission. Proposals must include a comprehensive safety plan adhering to OSHA CFR 1910-268, ANSI Z359 and Z490, and NATE CTS standards, along with verifiable certifications for all tower climbers and equipment, and must be submitted by the extended deadline of July 29, 2026. All personnel performing tower work must use OSHA CFR 1926.954 compliant personal protective equipment, and contractors must notify the Contracting Officer Representative at least seven days in advance of arriving at any site, except in urgent cases. Once awarded, the contractor will be responsible for delivering all materials in new, unused condition and ensuring that repair work restores towers to a “like new” state, including foundation replacements, lightning system repairs, corrosion mitigation, bird proofing, and power washing of chloride deposits. Non-OEM parts may be used if proven interchangeable and of equal quality. Reports for inspections and engineering evaluations must be submitted digitally via email to the COR within 30 days of completion, including contract number, CLIN, date of completion, and on-site POC, with a requirement of fewer than two errors per report and responses to government clarifications within three business days. Quality assurance site completion checklists, signed by both contractor and government personnel, must be submitted with each task order, verifying all work was completed, soluble salt tests were conducted, and the site was returned to its original
Department Of Commerce Noaa

POSTED

4 days ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
Federal
Nez Perce-Clearwater NF - Seed Orchard Disconnect and Electrical Life Safety RehabThe contract solicitation 1240LU26Q0068 for the Seed Orchard Disconnect and Electrical Life Safety Rehab project at the Salmon River Seed Orchard Pump Station in Idaho is a total small business set-aside under NAICS code 237130, with a size standard of $45 million, restricting eligibility exclusively to small business concerns. The scope of work involves relocating existing overhead power to underground service, installing a new 400A, 480V, three-phase Type 4 electrical disconnect and post, replacing outdated pump controls and electrical backboards with new NEMA Type 4 Motor Control Center mounting assemblies, and addressing hazardous electrical deficiencies to ensure operational safety. Performance must begin within 10 calendar days of notice to proceed and be completed within 250 calendar days, with the revised period of performance now spanning from August 15, 2026, to October 15, 2026. The project requires full compliance with NFPA 70-2020 (NEC), NESC, NECA, and UL standards, along with OSHA regulations, and mandates third-party inspections, quality assurance reports, and submission of closeout documentation including wiring diagrams, test reports, and a written certification of completion. A firm fixed price contract is anticipated, and all quotations must include pricing for base items to be considered responsive. Quotations are due by July 22, 2026, at 12:00 p.m. Mountain Time and must include the completed SF-1442, Schedule of Items, Experience Questionnaire (Attachment 7), and acknowledgment of any amendments. A mandatory site visit is scheduled for July 7, 2026, to assess site conditions and accessibility under inclement weather. Performance and payment bonds at 100% of the contract value are required if the award exceeds $150,000, while payment protection bonds or irrevocable letters of credit are required if the contract value is between $35,000 and $150,000, both due within 10 days of award. The contractor must be registered in SAM.gov at the time of submission and award, and is responsible for securing all permits, providing safety equipment including first aid kits and fire extinguishers, and ensuring site security against theft and vandalism. Evaluation will prioritize experience, past performance, and fair and reasonable pricing
Csa Intermountain 9 Usda-Fs

POSTED

4 days ago

DEADLINE

in 1 day
View Details
NAICS: 237130
New
SLED
Burbank Grid Forward 4kV to 12kV Distribution System UpgradeThe Burbank Grid Forward project by Burbank Water and Power will modernize the city’s aging 4kV electrical distribution system by upgrading it to a 12kV system across two priority corridors in Burbank, California. This initiative involves the sequential decommissioning and safe removal of existing 4kV lines and equipment, followed by the installation of new overhead and, in select areas, underground 12kV feeder circuits spanning 30 circuit miles. The upgrade includes installing 2,121 poles, 913 transformers, switchgear, protective relays, vaults, and conduit systems to support the enhanced infrastructure. Once construction is complete, all new components will go through a thorough commissioning process to ensure safe and reliable operation. The project will result in the retirement of two outdated 4kV substations—Victory and Winona—leading to long-term reductions in operational and maintenance expenses. By transitioning to a more resilient 12kV system, Burbank aims to significantly improve grid reliability, accommodate future growth, and better serve communities identified as California Climate Investments priority areas. The initiative is managed by the City of Burbank, with Michael Wang, Principal Electrical Engineer, serving as the primary point of contact for project-related inquiries. The project is forecasted and publicly listed with a posted date of July 17, 2026.
City of Burbank

POSTED

4 days ago

DEADLINE

N/A
View Details

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 335313
New
SLED
Supply of BEB Charging Equipment and Power Conversion SystemsThe contract involves the supply and integration of battery electric bus charging equipment, including pantograph charging systems, power conversion modules, and software interfaces designed to ensure seamless compatibility and operational efficiency. All components must comply with applicable federal standards to guarantee safety, reliability, and interoperability within public transit infrastructure. The work requires end-to-end delivery, installation, and system integration to support the deployment of electric bus fleets, with a strong emphasis on performance, scalability, and long-term maintenance readiness. The solicitation is issued as a subcontract under the agency name Engineering and Program Delivery, with a response deadline of September 25, 2026. The North American Industry Classification System code 335313 applies, indicating the scope aligns with electrical equipment manufacturing for transportation applications. While the precise location of performance is not specified, the contracting entity is based in California, suggesting the equipment will support transit operations within the state. The project requires vendors to deliver fully integrated solutions with documented compliance, testing protocols, and support mechanisms to meet the operational demands of modern electric bus networks.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 238210
New
SLED
High-Voltage Electrical Installation for ZEB Charging StationsThe contract involves the installation of medium- and high-voltage electrical infrastructure to enable charging operations for zero-emission battery electric buses, focusing on critical components such as switchgear, transformers, conduits, and utility interconnection systems. This work is essential to support the expansion of public transit electrification in California, ensuring reliable power delivery to multiple charging stations across the network. The scope requires compliance with industry standards for high-voltage installations and integration with existing utility grids to maintain operational safety and efficiency. The contract is classified as a subcontract under NAICS code 238210, which corresponds to Electrical Contractors and Other Wiring Installation Contractors. It was posted on July 15, 2026, with a response deadline of September 25, 2026, providing prospective bidders approximately two months to prepare and submit proposals. The work is being managed under the Engineering and Program Delivery division of the California agency, though specific location details and point of contact information are not provided. All performance activities are expected to take place within California, aligning with broader state initiatives to modernize public transportation infrastructure and reduce emissions.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

6 days ago

DEADLINE

in 2 months
View Details