Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The US 101 Express Lanes Phase 5 project, solicitation C26031F, is a construction contract issued by the Santa Clara Valley Transportation Authority (VTA) to convert existing High Occupancy Vehicle (HOV) lanes into a dual express lane system. The project spans approximately 11 miles along US 101 from the US 101/SR 237 interchange in Sunnyvale to the Taylor Road Interchange in San Jose, passing through the cities of San Jose, Santa Clara, Sunnyvale, and Mountain View. Key construction activities include adding a second express lane in both directions, roadway widening, drainage construction, and the installation of tolling infrastructure. The work is estimated to take place between November 2026 and June 2031, with a total estimated construction cost within the right-of-way of 170.6 million dollars.
The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price submitted on Bid Form 1B. Bidders must comply with several regulatory requirements, including a 7.8 percent Disadvantaged Business Enterprise (DBE) participation goal, Buy America certifications, and California Labor Code prevailing wage requirements. Technical specifications mandate adherence to Caltrans Highway Design Manual standards and the Americans with Disabilities Act (ADA). The scope of work is supported by extensive geotechnical and foundation reports for multiple retaining walls, FAA determinations for temporary mobile cranes, and encroachment permits from local municipalities. Bids are due by 2:00 p.m. Pacific Time on October 29, 2026.
General Info
VTA contract for US 101 express lane conversion costing 170.6 million dollars.
PDF, High priority: read this first61 pages · specifications
HighAI Summary for 04 1K5534 - US 101 Express Lanes Phase 5 Materials Report: Materials Report dated January 30, 2026, for the US 101 Express Lanes Phase 5 Project (EA 04 1K5534). Prepared for Caltrans District 4 and VTA, the document provides technical data on geotechnical testing, site geology, groundwater, pavement strategies, corrosion evaluation, and material sources for the conversion of HOV lanes to express lanes in Santa Clara County.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 04-1K553-SCI-101 Water Quality Information Form: A Caltrans District 4 Water Quality Information Form for the US 101 Express Lanes project (EA 04-1K553-SCI-101). The document provides technical project data including impervious area measurements, disturbed soil area (36.98 ac), total construction site area (326.4 ac), and estimated roadway/structure costs for the PS&E phase.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum 1: The document is identified as Addendum 1, but the provided content consists of a list of generic document placeholders (Document1 through Document17) without specific procurement details.
XLSX
XLSX, High priority: read this first10 pages · bid-schedule
HighAI Summary for Bid Form 1B-C26031F: A detailed bid pricing form for project C26031F, containing a comprehensive list of 99 line items for construction services. Key items include roadway excavation, asphalt work, traffic control, and structural concrete. The document requires bidders to provide unit and total pricing for each specified item.
XLSX
XLSX, High priority: read this firstbid-schedule
HighAI Summary for Bid Form 1B-C26031F (Revision 1): A detailed bid pricing form (Revision 1) for project C26031F, containing a comprehensive list of 99 line items for construction services, including roadway excavation, asphalt work, traffic control, and structural concrete. It serves as the official bid schedule for bidders to enter unit and total pricing.
PDF
PDF, High priority: read this first131 pages · ifb
HighAI Summary for C26031F - US 101 Express Lanes Phase 5 IFB: Invitation for Bids (IFB) issued by the Santa Clara Valley Transportation Authority (VTA) on September 21, 2026, for the US 101 Express Lanes Phase 5 construction project. The document outlines procurement schedules, bidder instructions, federal funding compliance, and required bid forms. Bids are due by October 29, 2026, at 2:00 p.m. PT.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for C26031F US 101 Express Lanes Phase 5 - Plans & Drawings (Revision 1): Volume 3-2 of the plans and drawings for Contract C26031F (US 101 Express Lanes Phase 5), issued for bid on September 21, 2026. The document contains detailed pavement delineation quantities, including stationing, markers, and specifications for thermoplastic traffic stripes and warranty tapes.
PDF
PDF, High priority: read this first26 pages · industry-day
HighAI Summary for C26031F US 101 Express Lanes Phase 5 Pre-Bid Meeting Presentation: Presentation from the October 6, 2026, pre-bid meeting for Contract C26031F (US 101 Express Lanes Phase 5). It outlines the procurement schedule, electronic submission requirements via OpenGov, mandatory bid forms, prequalification deadlines (October 29, 2026), DBE goals, prevailing wage requirements, and project constraints including noise control and safety precautions.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for C 26031 F - US 101 Express Lanes Phase 5 Supplemental Project Information Handout: A supplemental project information handout for Contract C 26031 F (US 101 Express Lanes Phase 5). The document provides a comprehensive list of supporting technical files, including foundation reports, geotechnical design reports, pavement recommendations, materials reports, encroachment permits for San Jose, Sunnyvale, and Santa Clara, FAA determinations, and UPRR construction agreements.
PDF
PDF, High priority: read this first207 pages · specifications
HighAI Summary for C26031F - US 101 Express Lanes Phase 5 Technical Specifications: Volume 2 of the technical specifications for Contract C26031F, US 101 Express Lanes Phase 5, issued for bid on September 21, 2026. This document provides a comprehensive list of applicable standard plans, including details for pavement markers, concrete barriers, guardrail systems, drainage, and erosion control.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Caltrans Sheet No-1057 Revision 1: Technical drawing and specification sheet from the California Department of Transportation (Caltrans), identified as Sheet No-1057 Revision 1. The document contains elevation data, measurement scales, and references to multiple exhibits (A through K), focusing on site dimensions and slope measurements for bridge/roadway work.
PDF
PDF, High priority: read this first391 pages · contract-document
HighAI Summary for Contract C26031F - US 101 Express Lanes Phase 5: Construction contract for the US 101 Express Lanes Phase 5 project by the Santa Clara Valley Transportation Authority (VTA). The document includes the formal contract agreement, a comprehensive table of contents for 22 exhibits (including technical specifications, wage determinations, and project labor agreements), and defines the scope of work and order of precedence.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract C26031F - US 101 Express Lanes Phase 5 Plans & Drawings (Revision 1): This document contains the Plans and Drawings (Volume 3-1, Revision 1) for Contract C26031F, US 101 Express Lanes Phase 5, administered by the Santa Clara Valley Transportation Authority and Caltrans. Issued for bid on September 21, 2026, it includes an extensive index of plans covering typical cross sections, layouts, construction details, drainage, utility, and structure plans for the SR.87/US101 separation in Santa Clara County.
PDF
PDF, High priority: read this first210 pages · specifications
HighAI Summary for Contract C26031F - US 101 Express Lanes Phase 5 Technical Specifications (Revision 1): Volume 2 Technical Specifications (Revision 1) for Contract C26031F, US 101 Express Lanes Phase 5, issued for bid on September 21, 2026. The document includes professional certifications for roadway, structures, electrical, hydraulics, and utilities engineering, as well as an extensive list of applicable standard plans covering pavement markers, concrete barriers, guardrail systems, and drainage details.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for EA 04 1K553 4 - Foundation Report RW No. 2: Foundation Report dated February 13, 2026, for Retaining Wall No. 2 (RW No. 2) as part of the US 101 Express Lanes Phase 5 Project in Santa Clara, California. The document provides geotechnical investigations, subsurface conditions, seismic hazard assessments, and specific engineering recommendations for the design and construction of a soil nail wall at the Bowers Avenue Overcrossing.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for EA 04 1K553 4 - Retaining Wall RW No. 1 Foundation Report: Foundation Report dated February 13, 2026, for Retaining Wall No. 1 (RW No. 1) as part of the US 101 Express Lanes Phase 5 Project in San Jose, CA. The document provides geotechnical investigations, seismic hazard assessments, and design recommendations for a proposed soil nail wall, including subsurface conditions and construction considerations for Caltrans and VTA.
PDF
PDF, High priority: read this first24 pages · specifications
HighAI Summary for EA 04 1K553 4 - Retaining Wall RW No. 3 Foundation Report: Foundation Report dated February 13, 2026, for Retaining Wall No. 3 (RW No. 3) as part of the US 101 Express Lanes Phase 5 Project in Sunnyvale, California. The document provides geotechnical investigations, seismic hazard assessments, and engineering recommendations for the design and construction of a concrete cantilever wall, including bearing capacity, settlement, and global stability analyses.
PDF
PDF, High priority: read this first23 pages · specifications
HighAI Summary for EA 04 1K553 4 - Retaining Wall RW No. 4 Foundation Report: Foundation Report dated February 13, 2026, for Retaining Wall No. 4 (RW No. 4) as part of the US 101 Express Lanes Phase 5 Project in Sunnyvale, California. The document provides geotechnical investigations, subsurface conditions, seismic hazard assessments, and engineering recommendations for the design and construction of a concrete cantilever semi-gravity wall.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for EA 04-1K5534: US 101 Express Lanes Phase 5 Geotechnical Design Report: Geotechnical Design Report (GDR) dated February 4, 2026, for the US 101 Express Lanes Phase 5 Project in Santa Clara County. The document provides geotechnical engineering studies, subsurface exploration results, and design recommendations for 36 overhead sign (OHS) structures, tolling gantry foundations, and geosynthetic reinforced embankments (GRE) for shoulder widening. It includes specific data on CIDH pile foundations and soil corrosion evaluations.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for EA 04-1K553 - TOS Element(s) Information Handout: Dated May 5, 2026, this memorandum from the Office of Electrical Systems identifies existing State-maintained Traffic Management System (TMS) elements within the project limits for Project ID 0417000233 (EA 04-1K553). It mandates the inclusion of Bid Item 870009 for maintaining these elements during construction and provides a detailed inventory of CCTV, TMDS, ramp meters, traffic signals, and signs, including their IMMS IDs and geographic locations.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for IFB C26031F Addendum No. 3 - US 101 Express Lane Phase 5: Addendum No. 3 to IFB C26031F for the US 101 Express Lane Phase 5 project. This document modifies the DBE goal to 0% across multiple sections, including the Contract Goal, Bid Form 4, and the Business Development Program, citing a temporary pause in DBE goal setting by VTA. It also replaces the Project Labor Agreement attachment with Amendment No. 2 (Revision 1).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for IFB C26031F Addendum No 4 - US 101 Express Lanes Phase 5: Addendum No 4 dated 10/27/2026 for IFB C26031F (US 101 Express Lanes Phase 5). This document modifies the solicitation by replacing Bid Form 1B-C26031F and updating multiple plans and drawings within Volume 3-1 and Volume 3-2 to Revision 1.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for IFB C26031F US 101 Express Lanes Phase 5 - Addendum 2: Dated 10/2/2026, this addendum modifies IFB C26031F for the US 101 Express Lanes Phase 5 project. It replaces two UPRR agreement attachments in Appendix B and updates sheet no. 1057 in Volume 3-2 of the Plans & Drawings.
PDF
PDF, High priority: read this first20 pages · specifications
HighAI Summary for Median Widening 'A' Line Design Cross Section (127950-129600): Technical design cross-section plans for the 'A' Line Median Widening project, prepared by AECOM for the Santa Clara Valley Transportation Authority and the State of California Department of Transportation. The document contains engineering data, scales, and specific station coordinates (e.g., 1279+50, 1280+00) dated September 3, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Plan DP-3, DP-15 (Revision 1) - Drainage Systems: Technical specifications and drainage profiles for Drainage Systems No. 16, 17, 65, 66, and 68. Document includes capacity data, tie bolt requirements, and connection details to existing systems. Revision 1 is dated October 19, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Plant Removal Plan - Volume 3-2 (Revision 1): Technical plant removal and protection plans for the Santa Clara Valley Transportation Authority, involving Route 101 and Wildwood Ave. This document is Revision 1, dated October 19, 2026, and includes specific plan sheets (e.g., PR-11) approved for plant removal and protection work only.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 00000000001 - Northbound Widening Design Cross Section: Technical design cross-section documents for the Northbound Widening 'A' Line, prepared by AECOM for the Santa Clara Valley Transportation Authority. Dated 7/2/2010, the file contains engineering scales and project number 00000000001.
PDF
PDF, High priority: read this first233 pages · specifications
HighAI Summary for SB Widening Design Cross Section - US 101: Technical design cross-section plans for the Southbound Widening project on US 101 (36.7/47.7), involving the California Department of Transportation (Caltrans) and Santa Clara Valley Transportation Authority. The document contains detailed engineering coordinates, scale specifications, and cross-sectional data for stations 1462+50 through 1464+50, prepared by AECOM.
PDF
PDF, High priority: read this first60 pages · contract-document
HighAI Summary for UPRR Agreement No. 04R483 - N. San Jose Underpass: A signed agreement (No. 04R483) between UPRR and VTA/State regarding the State Highway 101 Express Lane (N. San Jose Underpass) project. The document outlines terms and conditions for the use of the Crossing Area, construction requirements for the structure, liability for property damage, and maintenance responsibilities.
PDF
PDF, High priority: read this first53 pages · contract-document
HighAI Summary for UPRR Agreement No. 04R486 - Agnew Avenue Underpass: Construction and Maintenance Agreement dated August 28, 2026, between Union Pacific Railroad Company, Santa Clara Valley Transportation Authority (VTA), and the State of California. The agreement concerns the Agnew Avenue Underpass (DOT 749979P) as part of VTA's Highway 101 Express Lane Project. It outlines contractor right-of-entry requirements, insurance obligations, and a cost estimate of $143,750.00 for Railroad work and oversight to be borne by VTA.
PDF
PDF, High priority: read this first97 pages · specifications
HighAI Summary for US 101 Express Lanes Phase 5 - Pavement Recommendation Memorandum: Dated July 9, 2025, this memorandum by AECOM provides technical pavement recommendations for the US 101 Express Lanes Phase 5 project in Santa Clara County. It details structural adequacy evaluations for median shoulder conversions, new pavement designs for inside and outside widening, and Crack, Seat and Overlay (CSOL) strategies for rigid pavements to meet specific Traffic Index (TI) requirements concurred by Caltrans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for US 101 Express Lanes Phase 5 - Preliminary Site Investigation Summary Report: A preliminary site investigation summary report prepared by AECOM for Caltrans District 4 regarding the US 101 Express Lanes Phase 5 in Santa Clara County. The document includes site vicinity maps, project site maps, and detailed boring location plans specifying shallow, environmental, and deep soil boring depths, as well as excavation depth requirements for roadway widening and overhead signs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Volume 3-1, Plan DD-4, DD-5 (Revision 1): Technical drawing and specification document (Revision 1, dated October 19, 2026) detailing biosfiltration swale details, concrete backfill cases, and cap inlet details for a project in SCI County on Route 101. Includes material specifications for RSP fabric and drainage details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Volume 3-1 Plan DQ-3, DQ-14, DQ-15, DQ-16, DQ-18 (Revision 1): Technical drainage quantity plans and specifications for a California Department of Transportation (Caltrans) project on Route 101 in Santa Clara County. The document includes drainage system details, culvert specifications, and railway cable layouts, dated August 31, 2026, with Revision 1 dated October 19, 2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Volume 3-2 Plan Q-10 (Revision 1) - Summary of Quantities: Technical quantity takeoff document dated October 19, 2026 (Revision 1), detailing earthwork, soil nail retaining wall quantities, concrete cantilever wall data, and roadway materials. Includes specific measurements for excavation, backfill, and structural concrete.
PDF
PDF, High priority: read this first5 pages · bid-form
HighAI Summary for VTA Bid Form 4: Listing of DBE Bidder or Subcontractors: This document is Bid Form 4 (Revision 1) from the Santa Clara Valley Transportation Authority (VTA), dated 8/20/26. It is used by bidders to list first-tier and lower-tier Disadvantaged Business Enterprise (DBE) subcontractors and suppliers, calculate DBE commitment percentages, and certify whether the DBE contract goal has been met. It includes specific credit rules for manufacturers, suppliers, distributors, and brokers.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for VTA Project Labor Agreement Amendment No. 2: Amendment No. 2 to the Project Labor Agreement between the Santa Clara Valley Transportation Authority (VTA) and the Santa Clara and San Benito Counties Building & Construction Trades Council. The primary purpose of this amendment is to extend the term of the agreement through December 21, 2026, to allow additional time for discussions regarding the operation and potential long-term extension of the agreement. Signed in October 2026.
PDF
PDF, Low priority16 pages · contract-document
LowAI Summary for 04R483 DOT 750116V Execution Audit Report: This is a Final Audit Report and electronic signature log for document 04R483 DOT 750116V, dated September 8, 2026. It records the creation, emailing, and e-signing of the agreement by Tiaira Moering.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Agreement No. 04R486 - Agnew Avenue Underpass: Construction and Maintenance Agreement dated August 28, 2026, between Union Pacific Railroad Company, Santa Clara Valley Transportation Authority (VTA), and the State of California. The agreement concerns the Bayshore Freeway/US 101 Express Lane project at the Agnew Avenue Underpass (DOT 749979P). It outlines the terms for project work, contractor right-of-entry, insurance requirements, and the Railroad's cost estimate of $143,750.00 to be borne by VTA.
LowAI Summary for ASN 2025-AWP-11422-OE - Determination of No Hazard to Air Navigation: Issued on 10/01/2025 by the FAA Southwest Regional Office, this document provides a determination of no hazard to air navigation for a temporary mobile crane located in Santa Clara, CA, for the Santa Clara Valley Transportation Authority. While the structure exceeds certain obstruction standards, it is deemed not a hazard provided specific marking, lighting, and notification conditions are met. The determination expires on 04/01/2027.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for ASN 2025-AWP-11424-OE - Determination of No Hazard: Issued December 2, 2025, this FAA aeronautical study determines that a temporary mobile crane (OS 1389+60-CL_12C_13C) located in Santa Clara, CA, for the Santa Clara Valley Transportation Authority, would not be a hazard to air navigation provided specific conditions are met. The structure exceeds obstruction standards by 17 feet. Requirements include marking/lighting per FAA AC 70/7460-1M, lowering the crane to the ground between sunset and sunrise, and providing 3-day advance notification to the FAA and San Jose Intl Airport/ATCT upon erection and removal.
LowAI Summary for ASN 2025-AWP-15505-OE - Determination of No Hazard: Issued on 11/20/2025 by the FAA Southwest Regional Office, this document determines that a temporary mobile crane structure for the Santa Clara Valley Transportation Authority does not constitute a hazard to air navigation. The determination is valid until 05/20/2027, provided the structure is lowered when not in use and the manager of Moffett Federal Airfield is notified prior to erection and removal.
LowAI Summary for ASN 2025-AWP-15600-OE - Determination of No Hazard: FAA aeronautical study determination issued on 11/20/2025 for a temporary mobile crane structure in Santa Clara, California, for the Santa Clara Valley Transportation Authority. The FAA determined the structure is not a hazard to air navigation, provided it is lowered when not in use and the manager of Moffett Federal Airfield is notified. The determination expires on 05/20/2027.
PDF
PDF, Low priorityother
LowAI Summary for Bridge 37-0037 Guadalupe River Inspection Report: A Bridge Inspection Report and inventory record for Bridge 37-0037 (Guadalupe River) on U.S. Highway 101 in San Jose, CA. The document includes construction history (built 1937, widened 2005), load ratings, structural condition assessments, and specific work recommendations for bridge identification painting.
PDF
PDF, Low priority5 pages · other
LowAI Summary for Bridge As-Built 37-0041 San Tomas Aquino Creek Bridge: A cover page or system-generated header from the California Department of Transportation's Bridge Inspection Records Information System (BIRIS) regarding the San Tomas Aquino Creek Bridge (37-0041).
PDF
PDF, Low priority7 pages · specifications
LowAI Summary for Bridge As-Built 37-0152 Lawrence Expressway OC: Bridge inspection records and as-built documentation for the Lawrence Expressway (37-0152) generated by the California Department of Transportation's BIRIS system. The document contains roadway and elevation photos dated 04/28/2010.
PDF
PDF, Low priority5 pages · specifications
LowAI Summary for Bridge As-Built 37-0490 Brokaw Rd UC: As-built bridge inspection records for structure 37-0490 on Brokaw Rd, generated by the Caltrans Bridge Inspection Records Information System (BIRIS).
PDF
PDF, Low priorityother
LowAI Summary for C26031F Prebid Meeting Attendance Sheet: A document recording attendance for a pre-bid meeting associated with project C26031F, containing certification and witness information.
PDF
PDF, Low priority6 pages · other
LowAI Summary for Caltrans Encroachment Permit Application - US 101 Express Lanes Phase 5: A Standard Encroachment Permit Application (DOT TR-0100) submitted to the California Department of Transportation for the US 101 Express Lanes Phase 5 Project. The project involves converting HOV lanes to express lanes and adding a second express lane in each direction between East Taylor Street and Ellis Street. Work includes roadway widening, drainage construction, tolling system installation, and electrical services. Estimated construction costs within the right-of-way are $170.6M, with a project duration from November 2026 to June 2031.
PDF
PDF, Low priority40 pages · other
LowAI Summary for City of Sunnyvale Encroachment Permit Application: A permit application form and requirements document from the City of Sunnyvale Department of Public Works for encroachment work within public rights-of-way or utility easements. It includes application fields, fee schedules, required submission items (insurance, site plans, traffic control), and general conditions for contractors.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
3 updates
PhaseSolicitation
Posted
Solicitation
Deadline changed
Response deadline changed from Oct 29, 2026 to Nov 12, 2026.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Response Deadline
Submission deadline
Response Deadline
Ready to pursue this opportunity?
Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.
Organization & Contact Information
Show more
AgencyCalifornia → Engineering and Program Delivery
Convert existing High Occupancy Vehicle (HOV) lanes to express lanes (also known as High Occupancy Toll (HOT) lanes) and will also construct a new 2nd express lane to create a dual express lane system along United States 101 (US101) from the US101/SR237 interchange in Sunnyvale to Taylor Road Interchange in San Jose. Addendum #1: Addendum 1: Modified Schedule dates and attached Vol. 2 Revision 1, Vol. 3-1 and 3-2 Revision 1. Attachments: Addendum_1.pdf, C26031F_Volume_2_Technical_Specifications_(Revision_1).pdf, C26031F_Volume_3-1_Plans_&_Drawings_(Revision_1).pdf, C26031F_Volume_3-2_Plans_&_Drawings_(Revision_1).pdf Official Notice #1: Pre-Bid Meeting: PowerPoint Presentation and Attendance sheet. Attachments: C26031F_-_Prebid_Meeting_Presentation_(10-06-2026).pdf, C26031F_-_Prebid_Meeting_Attendence_Sheet.pdf Addendum #2: Addendum #2 - The addendum is to replace reference documents for the Agnews Underpass and San Jose Underpass and revised drawing for Sheet No. 1057. Attachments: C26031F_Addendum-2.pdf, Q-14_UPRR_CnM_agmt_04R483_NSanJoseUnderpass_signed_(Revision_1).pdf, P-13_UPRR_CnM_agmt_04R486_AgnewUnderpass_signed_(Revision_1).pdf, Sheet_No-1057_Revision1.pdf Addendum #3: Addendum 3: DBE Goal and PLA modification Attachments: IFB_C26031F-Addendum_No._3.pdf, Bid_Form_4_(Revision_1).pdf, Exhibit_7_PLA_(Reviosn_1).pdf Addendum #4: Addendum 4-Modification Bid Form 1B and Volume 3 Plans and Drawings Attachments: C26031F_Addendum_4.pdf, Bid_Form_1B-C26031F_Attachment_(Revision_1).xlsx, Volume_3-1,_Plan_DD-4,_DD-5_(Revision_1).pdf, Volume_3-1,_Plan_DP-3,_DP-15_(Revison_1).pdf, Volume_3-2,_Plan_PR-8,_PR-11,_PR-17,_PR-19,_PR-20,_PR-23,_PR-28,_PR-30,_PR-31_(Revision_1).pdf, Volume_3-2,_Plan_Q-10_(Revison_1).pdf, Volume_3-1_Plan_DQ-3,_DQ-14,_DQ-15,_DQ-16,_DQ-18_(Revision_1).pdf