High-Voltage Electrical Installation for ZEB Charging Stations

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of medium- and high-voltage electrical infrastructure to enable charging operations for zero-emission battery electric buses, focusing on critical components such as switchgear, transformers, conduits, and utility interconnection systems. This work is essential to support the expansion of public transit electrification in California, ensuring reliable power delivery to multiple charging stations across the network. The scope requires compliance with industry standards for high-voltage installations and integration with existing utility grids to maintain operational safety and efficiency. The contract is classified as a subcontract under NAICS code 238210, which corresponds to Electrical Contractors and Other Wiring Installation Contractors. It was posted on July 15, 2026, with a response deadline of September 25, 2026, providing prospective bidders approximately two months to prepare and submit proposals. The work is being managed under the Engineering and Program Delivery division of the California agency, though specific location details and point of contact information are not provided. All performance activities are expected to take place within California, aligning with broader state initiatives to modernize public transportation infrastructure and reduce emissions.

General Info

Install medium- and high-voltage electrical infrastructure for zero-emission bus charging in California.

Agency

California → Engineering and Program DeliveryView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Engineering and Program Delivery
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of medium- and high-voltage electrical systems to support battery electric bus charging infrastructure, including switchgear, transformers, conduits, and utility interconnections.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction of a comprehensive camera system to enhance security and operational oversight in the Bagwell and North Cargo Operations areas of the Port of Seattle. The project will install 50 high-resolution cameras across 43 locations, significantly expanding and upgrading surveillance coverage beyond the current setup, which primarily focuses on conveyor systems and security doors. Enhanced visibility will be achieved along main terminal drive lanes and entrances in the Bagwell area, enabling more effective forensic investigations and improved enforcement of the Port’s movement rules and regulations. In the North Cargo Operations area, the system will introduce flexible, pan-tilt-zoom camera units capable of delivering user-controlled surveillance over broader surface areas, bridging gaps in existing coverage. The deployment is intended to provide adaptive, real-time monitoring capabilities tailored to dynamic cargo operations. The work is being managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and project manager Randa Williams. The solicitation, posted in July 2026, falls under NAICS code 238210 for electrical contractors and related work, and is positioned as a forecast for future procurement without a specified set-aside classification.
Aviation Project Management Group

POSTED

about 11 hours ago

DEADLINE

N/A
View Details

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 335313
New
SLED
Supply of BEB Charging Equipment and Power Conversion SystemsThe contract involves the supply and integration of battery electric bus charging equipment, including pantograph charging systems, power conversion modules, and software interfaces designed to ensure seamless compatibility and operational efficiency. All components must comply with applicable federal standards to guarantee safety, reliability, and interoperability within public transit infrastructure. The work requires end-to-end delivery, installation, and system integration to support the deployment of electric bus fleets, with a strong emphasis on performance, scalability, and long-term maintenance readiness. The solicitation is issued as a subcontract under the agency name Engineering and Program Delivery, with a response deadline of September 25, 2026. The North American Industry Classification System code 335313 applies, indicating the scope aligns with electrical equipment manufacturing for transportation applications. While the precise location of performance is not specified, the contracting entity is based in California, suggesting the equipment will support transit operations within the state. The project requires vendors to deliver fully integrated solutions with documented compliance, testing protocols, and support mechanisms to meet the operational demands of modern electric bus networks.
Switchgear and Switchboard Apparatus Manufacturing

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Procurement for Construction Manager/General Contractor (CMGC), CHABOYA YARD ZERO‑EMISSION BUS (ZEB) CHARGING INFRASTRUCTURE PROJECTThe Valley Transportation Authority (VTA) is seeking a qualified California-licensed General Contractor to serve as Construction Manager/General Contractor (CMGC) for the Chaboya Yard Zero-Emission Bus (ZEB) Charging Infrastructure Project, utilizing the CMGC delivery method as authorized under Public Utilities Code section 100150. The initial contract award will cover Preconstruction Services, including project management, close collaboration with the design consultant, constructability reviews, value engineering, risk assessment, and scheduling optimization to advance the design from 65% PS&E toward final plans. The Preconstruction Phase is limited to 240 calendar days from the Notice to Proceed and will be compensated via a negotiated lump sum fixed fee. Successful completion of preconstruction does not guarantee construction work; Stage 1 and Stage 2 construction services, estimated between $15 million and $20 million, are contingent upon VTA’s approval of a Guaranteed Maximum Price (GMP), Board of Directors authorization, and execution of a contract amendment. A mandatory project deliverable is the installation of medium-voltage switchgear no later than December 31, 2028, with overall project completion targeted for Summer 2029. The Contractor must ensure uninterrupted 24/7 operations at the Chaboya Yard throughout construction and demonstrate experience in BEB charging infrastructure, medium/high-voltage electrical systems, steel canopy structures, and CIDH piles, with two proven projects in each of the first two categories and one in the third. Key personnel must be identified by name, with resumes submitted and approval required for any changes. Subcontractors must meet the same experience thresholds and comply with strict flow-down requirements including prohibitions on covered telecommunications equipment from Huawei, ZTE, Hikvision, Dahua, and other entities tied to the Chinese government, as well as adherence to Buy America, nondiscrimination, anti-human trafficking, and lobbying compliance rules. Proposal evaluation is based on a Best Value approach with five equally weighted factors: qualifications, staffing and organization, work plan and project understanding, proposed schedule and effort, and cost proposal. Proposals must be submitted electronically no later than September 25, 2026, as two separate volumes: a Technical Proposal and a Cost Proposal, with standardized forms completed exactly as templated. Performance is required at 2240 S 7th Street, San Jose, CA 95112, with all work subject to VTA inspection and acceptance, which does not relieve
Power and Communication Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 2 months
View Details