Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Supply of Hot-Mix Asphalt (HMA)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the supply and delivery of hot-mix asphalt that complies with AASHTO and ASTM quality standards, ensuring the material is delivered to the project site in Madison, South Dakota, at specified temperature ranges to maintain workability and performance. All deliveries must be accompanied by comprehensive quality testing documentation to verify compliance with contractual specifications and to ensure the asphalt meets required engineering and safety criteria for pavement applications. This is a subcontract under a Small Business Set Aside, classified under NAICS code 324121, and is managed by the Department of the Interior through its agency Gaoa Fws. The solicitation was posted on July 28, 2026, with a response deadline of August 17, 2026, at 6:00 PM. The place of performance is limited to Madison, SD, and while specific address details are not provided, the obligation is strictly tied to delivery at that location. The contract is intended to support infrastructure needs through a procurement channel prioritizing small business participation.

General Info

Supply of AASHTO/ASTM-compliant hot-mix asphalt to Madison, SD, for small business set-aside project.

Agency

Department Of The Interior → Gaoa FwsView Agency

NAICS

324121 - Asphalt Paving Mixture and Block ManufacturingView NAICS

Place of Performance

VA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Gaoa Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and deliver hot-mix asphalt meeting AASHTO/ASTM standards to the project site in Madison, SD, within required temperature ranges and with quality testing documentation.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of The Interior → Gaoa Fws

Same awarding agency

NAICS: 237310
New
Federal
Madison Waterfowl Production Area Autotour RehabThe contract solicitation for the Madison Waterfowl Production Area Autotour Rehab is a sealed bid solicitation under the Small Business Set Aside - Total program, issued by the U.S. Fish and Wildlife Service under the Department of the Interior, with solicitation number 140FGA26Q0049 and a NAICS code of 237310. The work involves pavement preservation on the Auto Tour Road at the FWS Madison WMD site in Madison, South Dakota, including crack sealing and patching to extend pavement life, with performance mandated to occur between September 14, 2026, and December 13, 2026, and all work to be completed within 90 days of notice to proceed. Proposals must be submitted electronically via email to Samantha_LaGue@fws.gov by August 17, 2026, at 2:00 PM EST, with questions due by August 6, 2026. The solicitation requires a complete SF 1442, signed amendments if applicable, a detailed price schedule with line-item breakdowns, contractor evaluation documentation, and mandatory representations and certifications under FAR 52.204-8, with compliance verified through SAM.gov registration and UEI/CAGE code disclosure. The contract is awarded under a Lowest-Price Technically Acceptable (LPTA) methodology, prioritizing price as the dominant factor, with technical acceptability determined by past performance, vendor responsibility, and adherence to the 15-page Statement of Work and referenced standards such as AASHTO T 27, ASTM D4791, and federal environmental laws including the Clean Water Act and NEPA. Offerors must submit up to three recent, relevant projects within five years demonstrating comparable magnitude and complexity to qualify as technically acceptable, and vendor responsibility is assessed through FAPIIS/CPARS and SAM.gov records. All administrative submissions must be clearly marked with the contract number, and contractors are required to pay postage fees for all correspondence to the Contracting Officer or Contracting Officer’s Representative. Payment will be processed exclusively through the Invoice Processing Platform (IPP), with no provision for WAWF or other systems. Key personnel identified in the proposal are contractually bound, and substitutions require written approval by the Contracting Officer. No physical packaging, preservation, or item-level marking requirements such as UID, GTIN, or MIL-STD apply, as this solic
Highway, Street, and Bridge Construction

POSTED

about 24 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Federal
Y--Boat Ramp Replacement Project at Kirwin NWRThe U.S. Fish and Wildlife Service, under the Department of the Interior, is conducting market research for the Boat Ramp Replacement Project at Kirwin National Wildlife Refuge in Kirwin, Kansas, using solicitation number 140FGA26R0023. This effort is a Sources Sought Notice, not a formal solicitation, meaning no proposals are being accepted and no contract will be awarded based on this notice. The purpose is to gather industry information to inform future procurement planning. The NAICS code is 237990, and the procurement is designated as a Total Small Business Set-Aside under FAR 19.5, restricting eligibility to small businesses only. The project requires the demolition of three deteriorated concrete boat ramps and one concrete bulkhead at each of two sites, followed by the construction of two new double-lane concrete boat ramps. Each ramp must be 20 feet wide, 6 inches thick, made of 4,000 psi concrete reinforced with #4 epoxy-coated rebar spaced 12 inches on center, and finished with a 1-inch deep non-skid V-groove textured surface angled at 30 degrees. The work includes extending two existing wave breaks by approximately 40 feet using riprap and a minimum 8 oz non-woven geotextile underlayment meeting AASHTO M288, as well as dredging accumulated sediments from ramp and maneuvering areas. All work must support AASHTO HS-20 loads, achieve 95% of maximum dry density per ASTM D1557, and comply with the Clean Water Act, OSHA, and other federal, state, and local environmental and safety regulations. Environmental protections are central to the project, requiring implementation of Best Management Practices to safeguard water quality and wildlife habitats. A perimeter turbidity curtain must be installed prior to work and inspected daily, and a dedicated washout area for concrete trucks must be constructed to prevent contamination. Fueling and equipment maintenance within 100 feet of water are prohibited unless secondary containment is provided, and any spills must be immediately contained and reported. Concrete runoff or uncured material must never enter the water. Contractors may use onsite water, sewer, and electricity only if no damage is caused, and emergency work may be required outside normal hours to prevent damage to government property. Quality control must follow industry standards and be available upon request, with all installations complying with manufacturer specifications and applicable codes including OSHA
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 9 days
View Details
NAICS: 238990
New
Federal
Ottawa National Wildlife Refuge Visitor Center ParThis contract requires a small business to perform comprehensive asphalt preventive maintenance and pavement marking services at the Ottawa National Wildlife Refuge Visitor Center, specifically targeting the West Parking Lot and RV Parking Lot, between September 1, 2026, and October 31, 2026. The scope of work includes cleaning, hot-pour rubberized asphalt crack sealing of approximately 3,900 linear feet, applying a single coat of asphalt emulsion sealcoat over approximately 26,000 square feet, and full restriping of all parking stalls, pedestrian crosswalks, directional arrows, and “NO PARKING” zones. The work must meet strict standards: crack sealing must adhere to ASTM D6690, pavement markings must comply with FHWA MUTCD 11th Edition and ADA 2010 Standards for Accessible Design, and waterborne acrylic paint meeting TT-P-1952 specifications must be used. The contractor must furnish all labor, materials, equipment, supervision, tools, and incidentals, with operations restricted to 7:00 a.m. to 9:00 p.m. Eastern time unless approved otherwise, and no work is permitted on Federal holidays without explicit authorization from the Contracting Officer. All field activities must be scheduled during suitable weather to avoid operational disruptions and environmental harm. Contractors must ensure zero safety violations and zero environmental incidents, including preventing overspray, materials tracking, and runoff into surrounding habitats, and plugging or covering storm drains during application. A project-specific Quality Control plan must be maintained, documenting material specs, application rates, weather conditions, layout accuracy, and stripe tolerances. All work is subject to rigorous inspection and acceptance criteria, including verification of crack sealant adhesion and curing, sealcoat uniformity without ridges or puddling, and precise striping dimensions with no deviations from ADA-required stall sizes or MUTCD-aligned arrow and crosswalk specifications. Documentation such as daily logs, before-and-after photography, material batch tickets, and weather records must be regularly submitted and approved by the Contracting Officer’s Representative. The contractor must pay workers at least $13.65 per hour under Executive Order 13658, provide one hour of paid sick leave for every 30 hours worked up to 56 hours annually under Executive Order 13706, and ensure compliance with all applicable labor standards. The procurement is a Total Small Business Set-Aside under FAR 19.5 with
All Other Specialty Trade Contractors

POSTED

5 days ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
Federal
TX-FWS SANTA ANA NWR-TRAIL REPAIRSThis solicitation, titled TX-FWS SANTA ANA NWR-TRAIL REPAIRS and identified by number 140FGA26R0029, is a sources-sought notice issued by the U.S. Fish and Wildlife Service under the Department of the Interior for market research purposes only, not a formal request for proposals. It seeks interest from small businesses under a Total Small Business Set-Aside as defined by FAR 19.5, with the NAICS code 237310 for Highway, Street, and Bridge Construction. The intended work involves trail rehabilitation and new construction at the Santa Ana National Wildlife Refuge in Alamo, Texas, including the repair of 5,700 feet of existing granite surfacing and the installation of 550 feet of new granite surfacing with Tensar TriAx Geogrid stabilization, along with caliche surfacing on other segments. All work must meet strict dimensional standards—6 to 10 feet wide and 4 inches deep for granite or 10 inches for caliche after compaction—with a level, pothole-free finish. The contractor must provide all materials, equipment, personnel, transportation, and supervision without government furnished resources. The contract requires a comprehensive Quality Control Program to be submitted within 30 days of award, and the Government will conduct 100% daily inspections via the Contracting Officer’s Representative, Joe D’Arrigo, who is authorized to monitor performance, inspect work, issue technical interpretations, and coordinate site access but cannot alter contract terms. Key personnel, including a Contract Manager and alternate, must be designated in writing and available weekday business hours. Contractors must identify any organizational conflicts of interest and submit mitigation plans, ensure all documents and personnel are clearly marked as contractor products, and use safety cones and flagging tape to protect public safety. Compliance with socioeconomic representation is mandatory, requiring submission of UEI numbers and business type classifications including Small Business, SDB, WOSB, VOSB, SDVOSB, HUBZone, or 8(a). While pricing is structured as a task-by-route schedule detailing square footage for specific trail segments, no total contract value is provided. The notice’s response deadline has passed, and this is not a contract award action but a research tool to assess industry interest and capability for an anticipated future solicitation.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 27 days
View Details