Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Connecticut was posted on May 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of Magnesium Hydroxide Slurry for Wastewater Treatment

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract mandates the supply of magnesium hydroxide slurry specifically formulated for wastewater treatment, with strict specifications requiring a pH between 10.0 and 10.5 and a specific gravity ranging from 1.24 to 1.29. The slurry must be produced and stored in below-grade tanks to maintain stability and consistency, and delivery must occur no later than 48 hours after production to ensure efficacy and freshness. The procurement is structured as a subcontract under the North American Industry Classification System code 325188, indicating it pertains to other inorganic chemical manufacturing. The contract is issued by the Water and Sewer agency in Connecticut, with a solicitation response deadline of May 22, 2026, and was posted on May 8, 2026, allowing potential suppliers a two-week window to submit proposals. Place of performance and point of contact details are unspecified, but the work is expected to support municipal wastewater treatment initiatives within the state.

General Info

Supply magnesium hydroxide slurry for wastewater, pH 10-10.5, deliver within 48 hours.

Documents

This scope was carved out of 25/26-60.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CHEMICALS FOR WASTEWATER TREATMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → Water and Sewer
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide magnesium hydroxide slurry with pH 10.0–10.5 and specific gravity 1.24–1.29, stored in below-grade tanks and delivered within 48 hours of production.

More opportunities from Connecticut → Water and Sewer

Same awarding agency

NAICS: 237110
SLED
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation # 26/27-17
The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS