Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of Manufacturer-Specified Equipment or Parts

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract mandates the procurement and delivery of equipment or parts that strictly adhere to manufacturer part numbers, technical drawings, and detailed specifications, ensuring full compliance with original design intent. All items must be of merchantable quality and confirmed suitable for their intended operational use, with no substitutions or deviations permitted without explicit authorization. The requirement emphasizes authenticity and precision, underscoring that only genuinely manufactured components meeting exact technical criteria are acceptable for acceptance. Subcontractors must respond to this solicitation by August 4, 2026, with materials destined for performance under the Dallas Area Rapid Transit agency in Texas. The NAICS code 423830 indicates this relates to wholesale trade of construction materials, highlighting the nature of the goods being supplied. While no specific place of performance or point of contact is detailed, interested parties must review the provided link for full submission instructions and additional requirements, ensuring alignment with the agency's procurement standards for critical infrastructure components.

General Info

Procure authentic manufacturer parts meeting exact specs for Dallas Area Rapid Transit by August 4, 2026.

Documents

This scope was carved out of 2100305.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FILM, 43.81 IN (W) X 48.75 |2100305

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Procurement and delivery of supplies, equipment, or construction materials that strictly conform to manufacturer part numbers, technical drawings, and specifications. Items must be of merchantable quality and suitable for intended use.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
Dallas Area Rapid Transit is soliciting professional engineering design services for the Trinity Railway Express Second Main Track project in Dallas, Texas. The scope of work involves preparing construction documents for 1.95 miles of double track from I-35E to the Mockingbird Lane grade separation. Key technical requirements include the replacement of the DART Rail Bridge at I-35E and SH 183 Lower Stemmons, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Boulevard and the Knights Branch and Noble Branch stream crossings. The design must adhere to a 18.5 foot vertical clearance requirement for the I-35E freight corridor and accommodate design speeds of 60 mph for freight and 79 mph for passenger rail. The project integrates with the Harry Hines Boulevard Transportation Master Plan, requiring the evaluation of multiple intersection layout alternatives to improve connectivity, accessibility, and safety for multimodal users. Deliverables include detailed design schematics, conceptual phasing plans, and technical specifications for steel and concrete materials. The winning bidder must sign a confidentiality agreement and ensure all personnel complete specialized training on new bridge design and construction methods. Coordination with the Texas Department of Transportation Dallas District is required to manage traffic control and track alignment shifts during the phased construction process.
Engineering Services

POSTED

29 days ago

DEADLINE

in 25 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS