Surveying and Potholing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves providing specialized construction surveying, staking, and utility potholing services for prime contractors working on infrastructure projects for the City of Redlands Municipal Utilities and Engineering Department. The scope of work focuses on locating existing utilities through vacuum excavation and delivering precise construction staking for signal placement in accordance with Section 01722 and Section 01732. The selected provider will utilize Total Station, GPS, and vacuum excavation equipment to produce necessary survey stakes and utility location reports. The opportunity is categorized under NAICS code 541370 and was posted on October 22, 2026. Interested parties must submit their responses by the deadline of November 16, 2026. This project is specifically designed to support municipal infrastructure improvements within the state of California.

General Info

Construction surveying, staking, and utility potholing services for City of Redlands infrastructure projects.

Documents

This scope was carved out of S400028.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Church Street and San Bernardino Avenue Traffic Signal Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Utilities and Engineering Department of City of Redlands
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs construction surveying, staking, and utility potholing for prime contractors on City of Redlands infrastructure projects. Locates existing utilities via potholing and provides precise construction staking for signal placement per Section 01722 and Section 01732. Uses Total Station/GPS and vacuum excavation equipment. Delivers survey stakes and utility location reports.

Similar Contracts

Same NAICS industry code

More opportunities from California → Municipal Utilities and Engineering Department of City of Redlands

Same awarding agency

NAICS: 237110
SLED
2026 CIP Water Pipeline Replacement Project
Solicitation # 501071
The City of Redlands Municipal Utilities and Engineering Department is soliciting sealed bids for the 2026 CIP Water Pipeline Replacement Project (Project No. 501071). The scope of work involves the installation and replacement of approximately 3,500 linear feet of ductile iron water pipeline ranging from 8 to 24 inches, including the installation of water services, valves, and fire hydrants. The contractor is responsible for all associated tasks, including traffic control, utility location, pavement removal and repair, earthwork, pipeline testing and disinfection, and restoring all areas to pre-construction conditions. All work must be completed within 100 working days from the issuance of the Notice to Proceed and must adhere to the 2021 Greenbook Standard Specifications and the city's water and sanitary sewer system standards. Bids are due by November 16, 2026, at 3:00 p.m. PT and must be submitted to the Office of the City Clerk. Eligible bidders must possess a Class A or C-34 California State Contractor's License and be registered with the DIR. Submission requirements include a 10% bid security, a completed safety prequalification questionnaire, and a record of three similar projects completed within the past two years. The contract will be awarded to the lowest responsive and responsible bidder. The successful contractor will be required to provide faithful performance and labor and material bonds, each for 100% of the bid amount, and must comply with California prevailing wage laws.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 6 days
View Details
NAICS: 237110
SLED
REDLANDS WASTEWATER TREATMENT PLANT UPGRADES - PHASE 2 - REBID
Solicitation # 521006
The City of Redlands Municipal Utilities and Engineering Department is soliciting proposals for the Redlands Wastewater Treatment Plant Upgrades Project - Phase 2 (Project No. 521006). Located at 1950 Nevada St., Redlands, CA, the scope of work requires the contractor to provide all project management, labor, materials, tools, and equipment necessary for construction. Key technical improvements include headworks upgrades featuring a new washer-compactor for screenings, a washer-classifier for grit, airflow monitoring with alarms, a new precast concrete building (Power Center 2), and a new MCC. Additionally, the project involves ventilation upgrades for Primary Sludge Pump Station No. 1 and the installation of a redundant pipeline from primary clarifiers to the Peak Ponds Pump Station. The contract will be awarded to the responsible bidder offering the lowest total bid price. Bids must be submitted via the PlanetBids portal by November 12, 2026, at 2:00 PM ET. Required submittals include a comprehensive bid package consisting of a bid bond equal to 10 percent of the bid, a non-collusion affidavit, DIR registration proof, and a safety prequalification questionnaire. The selected contractor must commence work within ten calendar days of the Notice to Proceed and submit a preliminary schedule within fourteen calendar days. Compliance with Federal Davis-Bacon wage requirements, the Build America, Buy America (BABA) Act, and DBE good faith efforts is mandatory. All work must adhere to EPA, OSHA, RCRA, and NFPA regulations, with specific requirements for double containment of underground hazardous materials.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 1 day
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS