Sweetbriar Bank Stabilization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sweetbriar Bank Stabilization Project is a forecast initiative managed by the California Regional Water Quality Control Board, Region 5 in Redding, located at 29511 Shade Avenue, Castella, California, in Shasta County. The primary objective of the project is to prevent erosion and protect a residential driveway from washing out during high-flow events. The scope of work involves the installation of rock slope protection using quarter-ton rock extending 120 feet along the bank, which will result in 0.03 acre of permanent impacts. The project is classified under NAICS code 237990. The project is exempt from California Environmental Quality Act review under section 15304 for minor alterations to land. It requires specific regulatory authorizations, including Clean Water Act Section 404 authorization from the U.S. Army Corps of Engineers under Nationwide Permit 13 and Section 401 Water Quality Certification from the Central Valley Regional Water Quality Control Board under WDID No. 5A45CR00673. Key points of contact include Senior Environmental Scientist Lynn Coster for the state agency and Gabriel Leggieri for the U.S. Army Corps of Engineers.

General Info

Install quarter-ton rock slope protection along 120 feet of stream bank to stabilize erosion at 29511 Shade Avenue, Castella, CA.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA, 96017

Set-Aside

NONE

Documents

(1)

5A45CR00673 Sweetbriar Bank Stabilization Project CEQA Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Margaret McEvoyLand Owner

Full Description

Show more
The Project’s purpose is to provide bank stabilization to prevent erosion and to protect the residential driveway, which is currently at risk of washing out during future high-flow events. The project consists of the installation of rock slope protection (RSP) consisting of quarter-ton rock extending for 120 feet along the bank resulting in 0.03 acre of permanent impacts.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 13 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
NPDES Oak Ridge Park East Stream Restoration
Solicitation # 27-009
Solicitation 27-009 is a request for sealed bids from the Charles County Government for the NPDES Oak Ridge Park East Stream Restoration project in Hughesville, Maryland. The project is designed to meet Maryland Department of the Environment and National Pollution Discharge Elimination System permit requirements by obtaining impervious area and nutrient reduction credits. The scope of work includes installing a stormwater detention facility, restoring approximately 1,400 linear feet of an eroding unnamed tributary to Gilbert Run using in-stream and bank stabilization structures, and stabilizing 120 linear feet of an eroding outfall channel. The contract will be awarded to the lowest responsive and responsible bidder who has been a legal entity in the field for at least five years. The project requires strict adherence to technical specifications, including a mandatory Critical Path Method schedule and compliance with Maryland State Highway Administration and Charles County construction standards. Key contractual obligations include a five percent bid bond, the use of Maryland prevailing wage rates, and the provision of performance and labor bonds. Upon completion, the contractor must provide a one-year warranty and ensure an 85 percent survivability rate for planted trees and shrubs over three years. Final payment is subject to a five percent retainage, which may be replaced by a maintenance bond, and is contingent upon the submission of as-built drawings and geotechnical inspection reports. Bids must be submitted electronically by October 13, 2026.
DPW - Capital Project Management

POSTED

1 day ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS