Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

SWITCH,NETWORK,ATM

Active
N0010426QZB72Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This sole source solicitation is for the refurbishment of four network ATM switches designated as Fly-By-Wire Submarine Flight Critical Components. The contractor is required to perform a teardown and evaluation within 45 days of receiving the carcasses to provide a firm-fixed-price quote for the full repair effort. The requested turnaround time for final inspection and acceptance is 180 days, and the supplies carry a one-year warranty from the date of delivery. Due to the critical nature of the hardware, the contract mandates strict adherence to quality assurance standards, including ISO 9001 and MIL-STD-1686 for electrostatic discharge control. The contractor must possess a valid U.S. security clearance of Confidential or higher to handle classified annexes and must maintain rigorous material traceability and certification records. All work is subject to government source inspection, and the final products must be marked with specific Special Material Identification Codes to ensure they are acceptable for use in submarine flight critical applications.

General Info

Refurbish four submarine flight critical ATM switches with 180-day turnaround and one-year warranty.

Agency

Department Of Defense → Navsup Weapon Systems Support MechView Agency

NAICS

335313 - Switchgear and Switchboard Apparatus ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(1)

NO00104-26-Q-ZB72 RFQ for teardown, repair, and/or modify network switch

PDFrfq

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support Mech
View Agency Profile
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N742.16|WYA|771-229-1967|robert.h.langel.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications Section C and Section E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo)|N/A|TBD|N00104|TBD|TBD|N4971A QTY 4|TBD|FBW-SFCC |N/A|N/A|TBD|N/A|N/A|See form DD1423|robert.h.langel.civ@us.navy.mil| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| 1.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2.Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 3.If the offeror is not the Original End Manufacturer (OEM) of the material called out in the requirement, the OEM must be stated (Company Name and CAGE) and the offeror must provide a signed letter of authorization as a distributor on the OEM's letterhead. 4.If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5.The resulting contract from this request for proposal/request for quotations will utilize Commercial Asset Visibility (CAV). See NAVSUPWSSFA24 for more details. 6. Please submit: Estimated (EST) pricing or Firm Fixed Price (FFP). Please also provide an approximate cost of new item if available. 7.A beyond repair/beyond economical repair price shall also be provided in addition to the repair price at the time of submission of quote. 8.Do not include the cost for shipping material as the government-implemented shipping system or ATAC will be shipping/delivering material. 9.Vendor shall have 45 days after receipt of carcass(es) to complete a teardown & evaluation (TD&E) of the carcass(es) and submit a Firm-Fixed Price (FFP) quote for the full repair effort of the carcass(es). 10.The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTAT established in the resulting contract. Requested RTAT: 180 Days 11.This is a sole source requirement. 12.This Delivery Order will be placed on BOA N0010422GZD01, and terms and conditions from the BOA will apply. 13.Offerors must have a valid U.S. security clearance of CONFIDENTIAL or higherin order to respond to the RFQ/RFP (Announcement), because RFQ/RFP (Announcement) includes annex (information) classified at the CONFIDENTIAL level which will be released only to offerors processing the appropriate clearance. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (32 CFR Part 117). 14.DD1423 Data Items with title of "INSPECTION AND TEST PLAN" and subtitle "INSPECTION SYSTEM/QA REQUIREMENTS" may be waived if already on file at NAVSUP WSS Mechanicsburg. 15.DD1423 Data Items with title of "INSPECTION AND TEST PLAN" and subtitle "RECEIPT INSPECTION" may be waived if already on file at NAVSUP WSS Mechanicsburg. \ 1. SCOPE 1.1 The material identified in this contract/purchase order will be used in a crucial shipboard system; therefore, this material has been designated as a Fly-By-Wire(FBW) Submarine Flight Critical Component (SFCC) and identified with a Special Material Identification Code (SMIC) on the outer wrapping which identifies thisNIIN as a FBW SFCC. SMIC identifiers are "VU" for Virginia Class, "SW" for Seawolf Class, and "SC" for Columbia Class. As such, special control procedures are invoked to assure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=MIL-STD-1686 | | |C |951025|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO 9002 | | | |940701|A| | | DOCUMENT REF DATA=MIL-Q-9858 | | |A |950905|A|3 | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|3 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;96169 EB-4367-V1; , except as amplified or modified herein. This applies to all "Parts Requiring Certification" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 Electrostatic Discharge Control - The Contractor must comply with the electrostatic discharge control requirements established in MIL-STD-1686. 3.3 Security Clearance Required - This contract/purchase order requires the Contractor to have a Government Security Clearance in accordance with the attached Contract Security Classification Specification (DD Form 254). 3.4 NAVSEA T9044-AD-MAN-010 REQUIREMENTS MANUAL FOR SUBMARINE FLY-BY-WIRE SHIP CONTROL SYSTEMS - All applicable elements of NAVSEA T9044-AD-MAN-010 for which the contractor must comply, are included in this contract or purchase order. NAVSEA T9044-AD-MAN-010 is for official use only and distribution is to comply with Distribution Statement D. 3.5 Configuration Control - The Contractor must maintain the total equipmentbaseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.5.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Submarine Program manager (SPM) via the Procurement Contracting Officer (PCO). The Contractor must provide a copy of this request to the QAR. Requests for Waivers/Deviations must be prepared using form LI/DSS/SFCC WD-1 (Local) or in Contractor format, and must include the following information: a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance). b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of thenon-conformance. 3.5.2 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and changejustification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. 3.6 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.7 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with MIL-I-45208, MIL-Q-9858, or ISO9001:2008 (except as amplified or modified herein) with the calibration system requirements of MIL-STD-45662, ISO10012, or ANSI-Z540.3. Quality systems in accordance with ISO9001:2000, ISO9001:1994, or ISO9002:1994 are acceptable alternates. 3.7.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.7.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.7.3 See CDRL DI-QCIC-81110 (INSPECTION SYSTEM/QA PROCEDURE) - All suppliers of SFCC material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.7.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.7.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.8 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of corrective action taken as appropriate. 3.8.1 The supplier's calibrated gages that measure and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.8.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.9 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.10 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.10.1 Visual examination upon receipt to detect damage during transit. 3.10.2 Inspection for completeness and proper type. 3.10.3 Verification of material quality received. 3.10.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.10.5 Functional testing, for use during certification testing, as required by the Contract to determine satisfactory operation. 3.10.6 Identification and protection from improper use or disposition. 3.10.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.10.8 For GFE material, and as required by the terms of the bailment agreement the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.10.9 Material returned to the contractor must be handled as GFM. 3.11 Traceability and Certification Requirements - To assure that correct materials are installed in FBW SCS SFCC systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3 of Section C of this contract/purchase order. 3.11.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-80678 and elsewhere in the contract/purchase order. 3.12 Material Traceability - Material traceability codes must be permanently applied to the material and annotated on test reports for each individual SFCC. An adhesive mounted durable tag may be used for electrical/electronic components. Traceability marking must be a unique vendor traceability number/code, or a combination thereof to maintain complete traceability to certification OQE. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.13 Receiving Inspection: 3.13.1 SFCC certifying activities must conduct material receipt inspections of all components just prior to SFCC certification to ensure that they meet the form and fit requirements of the invoked ship and system specifications. FBW SCS SFCCs must be receipt inspected in accordance with the material specification requirements of the applicable procurement contract and all contractually invoked Waivers, Deviations, and engineering changes thereto. 3.13.2 Receipt inspection processes must be performed using approved formal inspection procedures that specify the SFCC attributes and the required inspections and test that are required to verify the SFCCs conform to the applicable specification, drawing, and purchase order requirements. 3.13.3 SFCC certifying activities must conduct functional performance testing on all SFCCs to verify the individual SFCCs meet the invoked system and component performance specification. This testing can be performed as a part of the SFCC certification process. 3.14 Material Handling: 3.14.1 Material handling and control procedures must provide methods for FBW SCS SFCCs from fabrication and certification through issue, receipt, and inspection. FBW SCS components may be considered SFCCs beginning with the start of certification process (material receipt inspection) through installation. 3.14.2 FBW SCS SFCCs that are awaiting or undergoing receipt inspection, retained in the Navy supply system storage, or awaiting or undergoing certification, must be physically segregated from accepted, rejected or non-SFCCs to prevent commingling and unauthorized use. Segregation may be accomplished by use of separate cages, racks, bins, shelves, boxes, or roped-off areas that are distinctly marked for FBW SCS SFCCs. Segregation of SFCC OBRPs must be maintained until the SFCC is drawn from the ship's material storage and installed in the FBW SCS. 3.14.3 Material control tags, must be used to positively identify FBW SCS SFCC in transit to avoid unauthorized movement, commingling, and improper use.For SFCCs in their original packaging, labeling may be used instead of material tags. 3.14.4 Staging of FBW SCS SFCCs with other electronic components is acceptable for a specific job or fabrication process involving more than one component, provided the component is clearly marked as required and the component for the specific job or fabrication process is grouped together, identified by the job or process number, and segregated from components grouped for other processes or jobs. 3.15 Inspection: 3.15.1 Material Sampling - SFCC material must be inspected for form, fit, and function based on a sample size of 100 percent of the lot. 3.15.2 All material must be 100% inspected for traceability marking and that marking is legible. 3.15.3 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract requirements. Transcription of certification data is prohibited. 3.15.4 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.16 Material Marking for Traceability and Identification - The following are minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the marking requirements on applicable drawings and/or specifications, marking with a traceability code is required. All traceability marking must be permanently applied except as specified below. An alternate marking method is permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing. 3.16.1 SFCC MATERIAL MARKING - SFCCs must be marked with the Special Material Identification Codes (SMIC) appended to their NSN, Part Number and a unique Material Identification and Control (MIC) Number IAW paragraph E.4.2.1 OF NAVSEA T9044-AD-MAN-010. MIC marks must be applied by the certifying activity using MIL-STD-792 as a guide. NSN including SMIC, Part Number and MIC numbers must be marked on each component, as well as the outside of the ESD bag when used, and unit package. The MIC number, when applied, designates acceptance of the material for use. The Certifying Activity Designator (CAD) portion of the MIC must not be marked on the material until the material has been completely verified and accepted. The MIC mark must be applied only by those activities approved by NAVSEA. Unique MIC numbers for each SFCC must be used for status accounting, configuration control, and certification traceability. Altering of a MIC marking is prohibited except to make documented corrections. 3.16.2 Traceability markings for items or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and the tag securely affixed to the material. 3.16.3 Marking must be legible and must be located so as to not affect the form, fit, and function of the material. 3.17 Retention of records: Disposal of SFCC records must only be accomplished with the approval of the NAVSEA Submarine Program Manager. 3.18 See CDRL DI-MISC-80678 (FBW CERTIFICATION PACKAGE OQE) - Certificationtest report OQE to be kept on file by the certifying activity must include the following: 1. A statement equivalent to the following: All SFCC certification attributes, inspections and performance verification testing associated with this SFCC has been accomplished and meet the Requirements Manual for Submarine Fly-By-Wire Ship Control Systems and invoked standards and specifications. This SFCC materialis considered acceptable for use in submarine FBW SCS Flight Critical Applications. 2. Contractors name, address, phone number and date. 3. Contract number and delivery order number if applicable. 4. The SFCC NSN and the SMIC. 5. The government noun nomenclature. 6. Contractors part number. 7. The assigned MIC number. 8. All performance test results. 9. The programming history of this item. 10. The repair history of this item. 11. Any non-conformances for this item. 4. QUALITY ASSURANCE 4.1 Notes to the local Government Representative (DCMA QAR or SUPSHIP) and the Contractor 4.1.1 DCMA QAR/SUPSHIP - All nonconformances to contractual requirements must be submitted to the Procurement Contracting Officer (PCO) in accordance with the configuration control requirements of this contract/purchase order. A nonconformance is defined as affecting or violating the following: A) The requirements of this contract/purchase order. B) Contractually invoked drawings (i.e. envelope dimensions, interface dimensions with mating parts/equipment, center of gravity, weights, piece part identification, material, etc.). C) Contractually invoked federal, military, or commercial specifications and/orstandards. D) Form, fit, function, performance to contract requirements, reliability, maintainability, interchangeability, safety of personnel or equipment, or additional cost to the Government. 4.1.2 DCMA QAR/SUPSHIP and the Proprietary Contractor - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.3 DCMA QAR/SUPSHIP and the Proprietary Contractor - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicable part number and contract number must be submitted to the PCO. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 In accordance with DoDI 5230.24 all documents and drawings provided by the U.S. Navy to prospective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 6 (six) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. 6.2 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. 6.3.1 There are 7 (seven) separate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.4 Recent Updates - A short description of recent updates to the technical requirements of this item are listed below, along with an implementation date for each issue. The notes below are only a generic quick reference and are provided for convenience only, detailed requirements will be defined elsewhere in the technical sections of this Contract/Purchase Order. ;- 10/20/2016 - Updated ECDS URL - Dec 17 2011 - Moved Quality Assurance Text location for Readability; FBW TDP APPROVED BY DEPARTMENT OF THE NAVY, PROGRAM EXECUTIVE OFFICER, SUBMARINES, APPROVAL LETTER 9569 Ser 450T3SC/0175 21 Mar 16 DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Paragraph 10.4 of DI-QCIC-81110 does not apply. DATE OF FIRST SUBMISSION=ASREQ Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply. OQE must be submitted via WAWF (Wide Area Work Flow) for review and acceptance.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

NAICS: 332919
New
Federal
VALVE,REGULATING,FL
Solicitation # N0010426QLC08
The contract pertains to the repair of a VALVE, REGULATING, FL with a required Repair Turnaround Time (RTAT) of 365 days, measured from the physical receipt of the asset at the contractor’s facility as documented in the Commercial Asset Visibility (CAV) system. All pricing is firm-fixed-price and must include every cost associated with receipt, repair, testing, and government inspection, with no allowances for cost adjustments unless explicitly permitted. The contractor must comply with strict quality assurance standards, including adherence to MIL-STD-130 for marking and original manufacturer specifications for inspection and testing. Delivery is FOB Origin, and freight is managed by Navy CAV or Proxy CAV as defined in NAVSUPWSSFA24 or NAVSUPWSSFA25. Government Source Inspection is mandatory, and final acceptance requires government verification within the established RTAT. Late delivery due to unexcused contractor delay incurs a per-unit, per-month price reduction, capped at a specified maximum, without limiting other remedies such as termination for default. The contract mandates compliance with Buy American, cybersecurity maturity requirements, small business subcontracting plans, and other federal and defense-specific procurement clauses. The contractor must be an authorized distributor of the original manufacturer and provide documentation to that effect. All repair documentation, inspection records, and technical compliance must be maintained for at least 365 days after final delivery. The contract also outlines procedures for handling items deemed beyond repair, allowing for a negotiated fee not to exceed a specified limit for evaluation costs. All correspondence, submissions, and documentation must be directed to the designated point of contact at NAVSUP-WSS in Mechanicsburg, PA.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 10 days
View Details
NAICS: 332919
New
Federal
48--VALVE, GLOBE, SOL,
Solicitation # N0010426QEE96
This pre-solicitation notice concerns the procurement of two globe valves under solicitation number N0010426QEE96 for the Department of Defense. The requirement involves delivery to two specific locations: DLA Distribution in New Cumberland, Pennsylvania, and DLA Distribution San Joaquin in Tracy, California. Due to technical constraints, the government has determined that the data rights required to purchase or repair these parts are not owned by the government and cannot be obtained, and reverse engineering the component is deemed uneconomical. Consequently, the government intends to solicit and negotiate with only one source under the authority of FAR 6.302-1. Interested parties may submit capability statements, proposals, or quotations to demonstrate their ability to satisfy the requirement. While this notice is not a formal request for competitive proposals, the government will consider all responses received within 45 days of publication, or 30 days if an award is made under an existing Basic Ordering Agreement. Although the government is not currently utilizing commercial item acquisition policies, interested persons have 15 days to notify the contracting officer if they believe they can satisfy the requirement with a commercial item. The final determination regarding whether to proceed with a competitive procurement remains at the sole discretion of the government.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 333998
New
Federal
SERVER,RACKMOUNT
Solicitation # N0010426QYA2S
This contract pertains to the repair of a SERVER,RACKMOUNT under solicitation N0010426QYA2S, with a response deadline of December 22, 2025. The work is subject to strict technical and quality standards, including adherence to MIL-STD-130 Rev N for marking, compliance with original manufacturer specifications for repair procedures, and mandatory Government Source Inspection. All repairs must conform to the designated CAGE code 1LTM5 and reference CMS-00741, and no substitutions or design changes are permitted without prior written approval from the NAVICP-MECH Contracting Officer, with specific classification codes required for any authorized modifications. The contract mandates strict mercury-free requirements—no metallic mercury or contamination is allowed, with violations leading to rejection; exceptions require detailed approval and labeling. Deliveries are FOB Origin, and the repair turnaround time is measured from physical receipt of the asset at the contractor’s facility, as recorded in the Commercial Asset Visibility system, with final Government acceptance required within the stipulated timeframe. Contractors must provide a quote with unit and total price, repair turnaround time, and an informal cost breakdown if applicable, along with detailed awardee and inspection CAGE codes. The contract includes mandatory compliance with Buy American provisions, small business set-aside status, and annual representations and certifications, including those updated for 2025. All documentation references must be obtained through official DoD sources, with special handling required for NOFORN and Official Use Only materials. The awardee must be an authorized distributor of the original manufacturer, requiring proof of authorization submitted with the offer. Packaging must follow MIL-STD-2073 unless otherwise specified, and inspection records must be maintained for 365 days after final delivery. The contract is bilateral, requiring written contractor acceptance prior to execution, and performance is governed by the Navy’s Weapon Systems Support office based in Mechanicsburg, PA. The point of contact is Tyreese C. Smith, with communications directed via official Navy email and phone, and all responses must verify part number, NSN, and nomenclature before submission.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332919
New
Federal
47--CONNECTION,FLEXIBLE
Solicitation # N0010426QYAGN
This solicitation from Navsup Weapon Systems Support Mech involves the manufacture and supply of flexible connections for use on submarines and surface ships. The contract is subject to Emergency Acquisition Flexibilities and carries a DO/DX priority rating for national defense under the Defense Priorities and Allocations System. A significant technical requirement is that the material must be entirely free from metallic mercury contamination to prevent damage to vital ship systems and ensure personnel safety. Additionally, the government maintains an option to increase the order quantity by up to 100% for a period of 365 days at the same unit price. Contractors are responsible for rigorous quality assurance, including pressure and hydrostatic testing, with results that must be included in the shipment package. All items must be physically identified according to MIL-STD-130 and packaged in accordance with MIL-STD-2073. If an offeror is not the Original End Manufacturer, they must provide a signed letter of authorization from the manufacturer to be considered. The contract also includes specific provisions regarding cybersecurity maturity, small business subcontracting, and Buy American requirements. All inspection records must be maintained and made available to the government for 365 days following final delivery.
Other Metal Valve and Pipe Fitting Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 15 days
View Details
NAICS: 333613
New
Federal
3HD 3040 017330673 D5, SHAFT
Solicitation # N00104-26-Q-FD63
This solicitation, numbered N00104-26-Q-FD63, seeks the procurement of six shafts identified by NSN 3HD 3040-01-733-0673 D5 for use in a crucial shipboard system, with performance required at Mechanicsburg, Pennsylvania. The contract is a total small business set-aside under FAR 19.5, restricted to small businesses meeting the NAICS code 333613, and requires full compliance with Federal Acquisition Regulation and Defense Federal Acquisition Regulation Supplement clauses, including priority rating for national defense, hazardous material identification, trade agreements, electronic payment submission via WAWF, and restrictions on specialty metals in bearings. The shafts must be manufactured to precise form, fit, function, reliability, and safety standards, with material designated as Special Emphasis Level I, demanding rigorous quality assurance under ISO-9001 or MIL-I-45208, and calibration to ISO-10012, ANSI-Z540.3 with ISO-17025, or MIL-STD-45662. Packaging and marking must strictly adhere to MIL-STD-2073-1, MIL-STD-129, and MIL-STD-130, with traceability encoded per MIL-STD-792, and ESD-sensitive components protected per ANSI/ESD S20.20-2021. All shipments require WAWF electronic invoicing and receiving reports using specified DoDAACs, with payment instructions governed by DFARS clauses. Delivery is due within 200 days under FOB Destination terms, and no material may be shipped without prior formal acceptance. All offerings must include detailed past performance data, as award will be made based on a best-value determination prioritizing past performance over price. Compliance with NIST SP 800-171 for cybersecurity and FedRAMP Moderate baseline for cloud services is mandatory, and contractors must maintain configuration control of proprietary designs, submitting latest electronic drawings in C4 format. A certificate of compliance for special emphasis material, 100% inspection of material certifications, traceability, and NDT reports, along with zero-defect lot acceptance criteria, are strictly enforced. The contracting officer must approve all waivers or deviations, and the offeror must affirmatively declare eligibility, maintain active SAM registration, and certify compliance with defense-specific representations including
Mechanical Power Transmission Equipment Manufacturing

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details