Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SWR - 2026 Fall Trouble Tickets Transmission & Distribution Line Clearance

Closed
26-1710-JNState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 113310
New
SLED
F&W Anadromous Fisheries Division, Salmon Creek RM8 Fish log procurement
Solicitation # RFP-Salmon-Creek-RM8-Fish-Log-Procurement_001-1.pdf
The Confederated Tribes of the Colville Reservation Anadromous Fisheries Division is soliciting proposals for a fixed-price contract to procure, haul, and deck 750 fish logs to support salmon habitat restoration near Okanogan, Washington. The required materials must be Douglas Fir or Western Larch, measuring at least 40 feet in length with a diameter of 18 to 24 inches measured at 4.5 feet above the soil line. Logs must be of sound stock, free from rot, splitting, or pest infection. The contractor is responsible for all securing, loading, hauling, and offloading activities, delivering the logs to 696 Salmon Creek Road by July 1, 2026. Additionally, the scope includes performing site restoration for any delivery-related damages and providing approximately 2 to 4 dump truck loads of material to improve access roads to the staging area. Proposals are due by November 19, 2026, and the overall performance period extends through September 30, 2027. Award decisions will be based on a criteria evaluation focusing on reliability, effectiveness, and budget, with a specific price preference for responsible Indian Offerors whose bids are within 10 percent of the lowest non-Indian offer. Selected contractors must provide a performance bond for contracts exceeding 100,000 dollars or otherwise accept a 25 percent retainage. Required submission documents include a proposal cover page, a certification regarding debarment and suspension, and a detailed statement of qualifications. All payments are contingent upon the availability of funds within the tribal treasury and are subject to the Colville Tribe's fiscal year appropriation process.
Confederated Tribes of the Colville Reservation

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 113310
New
SLED
Sunnyhill Restoration Area, West Tract 2027 Timber Sale
Solicitation # 42832
The St. Johns River Water Management District is soliciting sealed bids for a per-ton timber sale of approximately 331.6 acres within the Sunnyhill Restoration Area in Marion County, Florida. The project involves the harvest of mature slash pine, consisting of 253.2 acres of marked timber identified by blue paint and 78.4 acres of logger-select thinning to a basal area of 40 to 45 square feet per acre. Estimated volumes include 3,815 tons of pine pulpwood, 1,775 tons of chip-n-saw, and 1,178 tons of sawtimber, though these volumes are not guaranteed. The contract will be awarded to the respondent providing the highest responsive and responsible bid for the total amount. The agreement spans 12 months from the effective date, with a requirement for a 20 percent non-refundable advance payment of the estimated timber value and a 5,000 dollar security deposit. Key operational requirements include maintaining stump heights of 6 inches or less, adhering to OSHA logging standards, and ensuring no damage to residual trees. The logging crew supervisor must hold a current certification from an SFI-approved logger-training program. Bidders must provide proof of authority to do business in Florida, E-Verify registration, and a non-collusion declaration. All bids must be submitted in sealed envelopes by 2:00 P.M. on November 10, 2026.
St. Johns River Water Management Dist

POSTED

1 day ago

DEADLINE

in 14 days
NAICS: 113310
New
SLED
Town of Norwich - Roadside Hazardous Tree Removal Project
Solicitation # 77253
The Town of Norwich, Vermont, is soliciting lump sum proposals from qualified tree service contractors for the felling and removal of approximately 14 hazardous trees located within the town right-of-way along various roadways. Identified by the Town Tree Warden and marked with green paint, these trees must be removed with stumps cut no higher than six inches. The contractor is responsible for all traffic control in accordance with the latest Manual on Uniform Traffic Control Devices and must ensure that no debris blocks driveways, stormwater ditches, or interferes with road maintenance and snow removal. All work must be completed by January 31, 2027, with the start date determined by the issuance of a Notice to Proceed. Proposals are due by November 23, 2026, at 1:00 PM ET and must be submitted in sealed envelopes to the Town Manager. Submissions must include a signed bid form with a total lump sum price, a description of the proposed approach and equipment, a list of similar work performed, and two professional references. The Town reserves the right to select any bid or reject all bids, noting that the lowest bid does not guarantee an award. Selected contractors must provide workers compensation insurance and commercial general liability coverage of at least $1,000,000 per occurrence and $2,000,000 per aggregate. Administration is managed by Brennan Duffy, with monthly invoicing approved by the Town Selectboard.
Department of Economic Development

POSTED

2 days ago

DEADLINE

in 26 days
NAICS: 113310
New
Federal
Cowboy Hat Stewardship IRSC - Lake Tahoe Basin Management Unit
Solicitation # 12363N27Q4000
The USDA Forest Service is seeking capability statements from qualified small businesses for the Cowboy Hat Stewardship Integrated Resource Service Contract within the Lake Tahoe Basin Management Unit. The project focuses on hazardous fuel reduction and forest restoration in areas affected by the Caldor Fire, specifically across a 545 acre contract area. The required logging mechanism is Cut-to-Length harvesting, which involves cutting and processing trees at the stump and forwarding material to landings. The scope of work includes cutting and forwarding biomass across 205 acres, mechanical mastication of dead and down material, removing approximately 2,603 tons of biomass and cull logs to off-forest sites, and constructing and decommissioning 1.4 miles of temporary roads. Optional tasks include hand thinning and hand fuel treatment across 177 acres. Performance is anticipated to begin in early summer 2027, with a strict completion deadline of September 15, 2027, due to grant funding expiration. The contract requires adherence to strict environmental and safety standards, including California Public Resources Code fire precautionary measures and specific erosion control protocols such as scarification and tillage. Compliance will be verified by the Forest Service through visual inspections and plot sampling, where a 90 percent acceptance rate per treatment unit is required. Interested vendors must submit capability statements detailing their experience with Cut-to-Length systems and fuel reduction by November 2, 2026, and are invited to a site visit on November 3, 2026.
Stewardship Contracting Branch Usda-Fs

POSTED

5 days ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Snohomish County PUD solicitation 26-1710-JN seeks a qualified contractor to perform vegetation management and line clearance for the 2026 Fall Trouble Tickets project. The scope of work involves providing all necessary labor, materials, and equipment to prune, cut, treat, remove, and dispose of trees and brush across approximately 5 pole miles. Work locations include Lake Stevens, Everett, Snohomish, Mukilteo, Edmonds, Lynnwood, Bothell, and Mountlake Terrace. The project is governed by Specification No. 2424 and a Special Provision Sheet, with an engineer's estimate of 207,000.00 dollars and a required completion period of 60 days. To be eligible for bidding, contractors must be on the District’s Small Works Roster and prequalified for Category D-1 Right-of-Way Clearing and Maintenance. The contract requires adherence to specific clearance standards, BNSF railroad safety protocols, and confidentiality requirements. Bidders must submit a lump sum contract price along with hourly rates for emergency work and equipment schedules. All inquiries must be directed to Jodeena Nakagaki via email by the specified deadline, as other forms of communication will not be guaranteed a response.

General Info

Snohomish County PUD seeks qualified contractors for 2026 Fall vegetation management and clearance.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

4

RFP 26-1710-JN Proposal Form - SWR 2026 Fall Trouble Tickets

PDF, High priority: read this firstrfp
High

RFP No. 26-1710-JN Special Provision Sheet

PDF, High priority: read this firstsow
High

Specification No. 2424 - Overhead Transmission and Distribution Line Clearance

PDF, High priority: read this firstspecifications
High

Contact Log and Trouble Tickets – Vegetation Management

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Snohomish County PUD
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Engineer's Estimate: $207,000.00 Project Description: The Contractor shall provide all labor, materials, tools, and equipment necessary to prune, cut, treat, remove, clear and dispose of trees and brush. The work to be performed is in various locations in Snohomish County, Washington including Lake Stevens, Everett, Snohomish, Mukilteo, Edmonds, Lynnwood, Bothell, and Mountlake Terrace. The total distance to be covered on this project is approximately 5 pole miles. Bidder Restrictions: Contractors shall be on the District’s Small Works Roster and currently Prequalified for Category D-1 – Right-of-Way Clearing and Maintenance (Tree and Brush Work) prior to bidding. All requests for clarification or additional information regarding this RFP must be submitted to the District via e-mail to contact@example.gov by the date noted in Tentative Schedule. The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Do not submit questions via Public Purchase.

More opportunities from Washington → Snohomish County PUD

Same awarding agency

NAICS: 541614
SLED
Supply Chain Management Consulting
Solicitation # 26-1644-SR
Public Utility District No. 1 of Snohomish County is seeking qualified consultants through RFQ 26-1644-SR to establish a roster of experts for supply chain management consulting. The primary objective is to analyze the District's supply chain across multiple domains, including demand and supply planning, sourcing, contracting, logistics, inventory management, and risk and compliance. Selected consultants will assess current maturity levels, identify gaps against industry best practices and regulatory standards such as NERC CIP, FERC, and NIST, and provide prioritized remediation roadmaps. The scope specifically emphasizes experience with SAP MRP operations and a preference for consultants with a history of working with comparable electric, water, or generation utilities. The selection process is based on best evaluated qualifications, utilizing a three-stage evaluation that includes pass/fail gates for completeness and responsiveness. Key evaluation factors include the ability to meet requirements, professional expertise, and the quality of the response. The contract structure allows for varying engagement terms and on-call services, with work performed within the District's service area in Snohomish County and Camano Island, Washington. Consultants must meet stringent insurance requirements, including professional liability and workers' compensation, and adhere to strict confidentiality and non-disclosure agreements regarding critical energy infrastructure information. Submissions are accepted electronically through December 31, 2026.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

7 months ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS