Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Systems Engineering & Integration (SE&I) for Sentinel NC3

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
SLED
Design / Engineering for Microgrid System and DC fast charger
Solicitation # PE-64458-NONST-2027-000000037
The City of Decatur is seeking qualified professional engineering firms to provide turnkey services for the design, bid assistance, and construction administration of a microgrid system and DC fast charger for electric vehicles at the Decatur Police Department located at 420 West Trinity Place. The project involves integrating a solar photovoltaic generation system and a battery energy storage system designed to optimize renewable energy and peak demand management during normal grid-connected operations, while ensuring critical loads remain operational during emergency grid-islanded conditions. The selected consultant will be responsible for delivering complete design plans for bidding and providing construction administration through installation, commissioning, testing, and interconnection with Georgia Power. This solicitation, posted on September 11, 2026, requires proposals to be submitted by October 13, 2026. The project is funded by the City and a Department of Energy grant, necessitating strict compliance with Build America, Buy America (BABA) requirements and federal regulations. Awarded firms must maintain a non-discrimination policy and carry an umbrella insurance policy of at least 5 million dollars. Evaluation is based on a 100-point weighted system, and the expected project start date is November 2026, following coordination with Georgia Power. Payment will be made monthly based on progress reports and invoices submitted to the City Manager.
City of Decatur

POSTED

about 18 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract seeks to provide systems engineering and integration support to incorporate DHF capabilities into the Sentinel NC3 architecture, ensuring seamless alignment across technical, operational, and lifecycle domains. Key responsibilities include managing interfaces, maintaining end-to-end requirements traceability, and developing comprehensive lifecycle plans that extend through Initial Operational Capability in 2033, with a focus on sustaining system integrity and mission readiness over time. This effort is critical to modernizing the nation’s nuclear command, control, and communications infrastructure by enabling interoperability and robustness across next-generation systems. The work is being procured as a subcontract under the Department of Defense, specifically through the FA6800 Aficc 767 Esf organization, with performance expected to occur at Fort Johnson. The solicitation was posted on July 16, 2026, with responses due by August 3, 2026, and falls under the NAICS code 541330 for engineering services. The effort requires deep technical expertise in systems engineering, integration, and defense architecture, with an emphasis on long-term planning and coordination across multiple stakeholders to meet stringent operational deadlines and security standards.

General Info

Provide systems engineering support to integrate DHF into Sentinel NC3 architecture through 2033 at Fort Johnson.

Agency

Department Of Defense → FA6800 Aficc 767 EsfView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Fort Johnson, LA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFI_SENTINEL_NC3_FY26_001.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Information - Sentinel NC3 Market Research

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA6800 Aficc 767 Esf
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA6800 Aficc 767 Esf
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide systems engineering support to integrate DHF capabilities into the Sentinel NC3 architecture, including interface management, requirements traceability, and lifecycle planning through IOC in 2033.

More opportunities from Department Of Defense → FA6800 Aficc 767 Esf

Same awarding agency

NAICS: 541611
Federal
Strategic Planning Methodology Integration SupportThis contract awards a Women-Owned Small Business sole source engagement to provide analytical support for integrating legacy Force Improvement Plan frameworks and Squadron Revitalization Study constructs into a unified strategic plan for the Air Force Global Strike Command. The work centers on ensuring methodological consistency and continuity with established baselines while aligning historical data and operational models into a cohesive strategy that meets current and future command objectives. The contractor will be responsible for conducting in-depth analysis to bridge gaps between prior initiatives and emerging requirements, preserving the integrity of past methodologies while enhancing their applicability within a modernized planning structure. Performance of the contract is centered at Fort Johnson, Louisiana, with the work falling under NAICS code 541611 for management, scientific, and technical consulting services. The contract is categorized as a subcontract under the Department of Defense, specifically managed by the FA6800 Aficc 767 Esf office. There is no solicitation number associated with this award, indicating it was issued through a direct sole source procurement based on the designated small business set-aside. The contract was posted on May 8, 2026, and the scope emphasizes strategic alignment over tactical implementation, requiring a high level of analytical rigor and institutional knowledge of Air Force planning traditions.
Administrative Management and General Management Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS