Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TAFB MACC-BOA | Formal RFP for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

Closed
FA813726R0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract solicitation, identified as FA813726R0039 for Project WWYK240146, is a total small business set-aside under NAICS code 237110 and is exclusively available to holders of the MACC-BOA. It requires the design and implementation of a monitoring and control system for the IWCS at Building 62516 on Tinker Air Force Base, Oklahoma, encompassing all materials, labor, equipment, testing, quality control, and incidentals necessary to achieve a fully operational system. Contractors must conduct a thorough site investigation to verify existing conditions, as all government-provided data—including floor plans, structural, mechanical, and electrical details, and utility locations—is approximate and must be independently confirmed in the field. Any elements not explicitly detailed in the drawings or Statement of Work must be identified and provided by the contractor to ensure complete system functionality. The scope is strictly limited to the four lift stations specified in the amended SOW, and discrepancies between documents require the contractor to assume the larger scope. All personnel must comply with Tinker AFB Instruction 21-100 for FOD awareness training when operating on flight lines or in maintenance areas, and must obtain an AF Form 1199C for access to restricted zones. A mandatory site visit on June 1, 2026, is required for proposal eligibility, with RSVPs and Entry Authorization List submissions due by May 22, 2026, and attendance limited to seven individuals per contractor. Requests for information are due June 5, 2026, and responses will be shared with all attendees. Proposal submissions are due July 27, 2026, at 5:00 PM CST, and must be delivered via email in specified Microsoft Office or PDF formats, with no password protection or compressed files allowed. Each proposal must include a technical volume with a project narrative, a fully supported CLIN-based price proposal, and a signed Model Order with completed fill-in fields. Pricing must break out design versus non-design labor costs to comply with DFARS 236.606-70, and proposals must be balanced to avoid unreasonable or unbalanced pricing that poses risk to the government. The acquisition will follow the Lowest Priced Technically Acceptable (LPTA) method, with technical acceptability and price reasonableness serving as pass/fail gates; any deficiency in a

General Info

DoD RFP for Monitoring & Control System at Tinker AFB; mandatory site visit June 1, 2026.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

15

240146 Section L Instructions to Offerors

PDF, High priority: read this firstinstructions-to-offerors
High

240146 Section M Evaluation Factors for Award

PDF, High priority: read this firstevaluation-factors
High

Amendment 0001 to Solicitation FA813726R0039

PDF, High priority: read this firstamendment
High

Amendment 0001 to Solicitation FA813726R0039 - Proposal Due Date Extension and Scope Revision

PDF, High priority: read this firstamendment
High

FA813726R0039-0001 Design & Implementation Monitoring & Control System RFP

PDF, High priority: read this firstrfp
High

FA813726R00390001 Design & Implement Monitoring & Control System RFP

PDF, High priority: read this firstrfp
High

FA813726R0039 Design & Implement Monitoring & Control System RFP

PDF, High priority: read this firstrfp
High

Pre-Bid RFIs and Government Responses for Honeywell Panel Integration Project

PDF, High priority: read this firstq-and-a
High

Statement of Work for Design & Implement Monitoring & Control System IWCS B62516

PDF, High priority: read this firstsow
High

WWYK240146 Monitoring & Control Systems Project Drawings

PDF, High priority: read this firstdrawings
High

CTR+CD_As-Built+Info_Att+3.zip

ZIP

CTR+CD_Base+Facility+Stds_Att+2.zip

ZIP

CTR+CD_CAD+Drawings_Att+4.zip

ZIP

CTR+CD_Large+Files_Att+5.zip

ZIP

CTR+CD_Project+Docs_Att+1.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 1, 2026 to Jul 10, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 10, 2026 to Jul 27, 2026. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more

This order proposal request is only available to current MACC-BOA holders.


The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).


The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.


The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.


Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.


This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.


IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.


Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.


Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner.  If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.


The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.


The due date for the RFIs arising from the site visit is currently set for June 5th, 2026 at 5:00 PM CST. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees.


This notice signifies the release of the formal RFP for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516. The due date for proposals has been extended to July 27th, 2026 at 5:00 PM CST. Any further extensions granted to the proposal due date will be updated to this posting. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates.


In lieu of the physical CD, some additional documents have been added to the attachments section including the Project Docs, Facility Standards, As-Built Info, CAD Drawings, and some additional large files. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the documents.


An accommodation has been made to extend the due date for proposals to July 27th, 2026 at 5:00 PM CST. This is to allow offerors additional time to incorporate the Government responses to the Requests for Information as well as supplemental information from key stakeholder Honeywell into their proposals. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.


All RFI responses have been received and compiled. Please see the attachments for the RFI responses. Utilize these in continuing to formulate your proposals. If RFI responses prompt a need for an extension to the proposal due date, please communicate that to the primary and secondary points of contact, and any extensions granted will be updated to this posting.


An amendment to the formal RFP including a revision to Section C - Descriptions/Specifications/Statement of Work has been issued to correct a discrepancy among the solicitation, IFC Drawings, and Statement of Work. The scope of the solicitation and the subsequent order exclusively pertains to the four lift stations enumerated in the Statement of Work, IFC Drawings, and amended solicitation. The due date for proposals remains firm as July 27th, 2026, and all other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
Solicitation # FA813726R0021
Solicitation FA813726R0021 is a firm-fixed-price, design-build construction project at Tinker Air Force Base, Oklahoma, specifically for Building 3221. The scope of work involves the removal and replacement of fire sprinklers within plasma booth dust collectors and the complete replacement of the building fire alarm system. This effort is a 100 percent small business set-aside and is restricted exclusively to current Tinker AFB MACBOA holders under NAICS 236220. The project requires a mandatory performance period of 300 calendar days, starting within 10 days of the notice to proceed. The government is utilizing a two-step sealed bidding process. Step one requires prime contractors to attend a mandatory site visit and submit a technical proposal without pricing; only those found technically acceptable proceed to step two. In the second step, eligible offerors submit a price bid, and the award is granted to the lowest evaluated priced proposal that meets all technical and responsibility standards. Key requirements include the submission of bid, performance, and payment bonds, as well as compliance with the Buy American Act and specific cybersecurity standards. Invoicing and payments are processed electronically through the Wide Area WorkFlow system.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
Federal
WWYK240015 - Rehab Tanks 62501E & 62501W
Solicitation # FA813726R0020
Solicitation FA813726R00020, project WWYK240015, is a request for proposals for the rehabilitation of tanks 62501E and 62501W at the Tinker Air Force Base Industrial Waste Treatment Plant in Oklahoma. The scope of work includes replacing failed internal coatings, repairing or replacing the cathodic protection system, repairing secondary containment seals, and removing construction waste from the secondary containment. Additionally, the project requires the replacement of electrical systems for the raised platform and the cleaning and recoating of exterior stairs and structures. This opportunity is exclusively open to current MAC BOA holders at Tinker AFB, and attendance at the initial site visit was mandatory for eligibility. The project is scheduled for completion within 310 calendar days from the receipt of the Notice to Proceed. Award will be based on the Lowest Priced Technically Acceptable (LPTA) source selection procedure, where the contract is awarded to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations focus on capability and management, requiring a detailed project narrative and a project-specific approach. The contract incorporates various FAR and DFARS clauses, including Davis-Bacon wage requirements and specific cybersecurity and safety standards. Although the solicitation process included multiple updates regarding RFIs and site visits, the posting was officially cancelled on October 28, 2026.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in about 17 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS