Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on May 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

TAFB MACC-BOA | Initial Site Visit for WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516

Closed
FA8137R0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract is a Firm Fixed Price solicitation under solicitation number FA813726R0039 for the Design and Implement Monitoring & Control System for IWCS at Building 62516 on Tinker Air Force Base, Oklahoma, with a total small business set-aside under NAICS code 237110. Only current MACC-BOA holders are eligible to submit proposals, and attendance at a mandatory site visit on June 1st, 2026, at 10:00 a.m. is required for eligibility; RSVPs with complete Entry Authorization List information must be submitted by 11:59 p.m. CST on May 22nd, 2026, or the contractor will be disqualified. The scope requires the contractor to furnish all materials, labor, equipment, tools, transportation, testing, quality control, and incidentals necessary to complete a fully operational system, including any assemblies, frameworks, or fixtures not explicitly shown in drawings or the Statement of Work, which must be identified and provided by the contractor. All government-provided data regarding floor plans, structural, mechanical, electrical details, and underground utilities are approximate and must be field-verified by the contractor, who is also responsible for coordinating logistical, architectural, and structural requirements and complying with all Tinker AFB facility standards, safety regulations, and airfield safety protocols, including FOD awareness training and adherence to Tinker AFBI 21-100. Personnel must obtain AF Form 1199C secure area badges and be escorted by designated contractor personnel when accessing controlled areas. The work is subject to 165 calendar days from notice to proceed, with performance starting no later than 10 days after issuance, and requires comprehensive submittals including a baseline schedule, health and safety plan, preconstruction documentation, and a training plan for government personnel, all subject to strict review timelines. The evaluation will follow a Lowest Priced Technically Acceptable (LPTA) process, where technical acceptability is determined by the absence of any deficiencies across subfactors and price reasonableness is assessed per FAR 15.404-1(b)(2), with failure on either criterion rendering the proposal unawardable. The contract mandates bid and performance/payment bonds, electronic payment submissions via WAWF, weekly progress reporting using AF Form 3065 equivalents, and adherence to all applicable FAR and DFARS clauses including

General Info

Design and implement IWCS monitoring system at Tinker AFB; MACC-BOA holders only, site visit mandatory.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

S Coffeyville, OK, 73145, USA

Set-Aside

SBA

Documents

11

240146 Section L Instructions to Offerors

PDF, High priority: read this firstinstructions-to-offerors
High

240146 Section M Evaluation Factors for Award

PDF, High priority: read this firstevaluation-factors
High

FA813726R0039 Design & Implement Monitoring & Control System RFP

PDF, High priority: read this firstrfp
High

Statement of Work for Design & Implement Monitoring & Control System IWCS B62516

PDF, High priority: read this firstsow
High

WWYK240146 Monitoring & Control Systems Project Drawings

PDF, High priority: read this firstdrawings
High

Construction Project WWYK240146 EAL

XLSX, Low priorityother
Low

CTR+CD_As-Built+Info_Att+3.zip

ZIP

CTR+CD_Base+Facility+Stds_Att+2.zip

ZIP

CTR+CD_CAD+Drawings_Att+4.zip

ZIP

CTR+CD_Large+Files_Att+5.zip

ZIP

CTR+CD_Project+Docs_Att+1.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more

This order proposal request is only available to current MACC-BOA holders.


The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information).


The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB.


The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government.


Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor.


This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.


IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems.


Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.


Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner.  If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.


The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP.


This notice also serves as the formal Synopsis for the requirement.


Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the Contractor CD documents.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
Solicitation # FA813726R0021
Solicitation FA813726R0021 is a firm-fixed-price, design-build construction project at Tinker Air Force Base, Oklahoma, specifically for Building 3221. The scope of work involves the removal and replacement of fire sprinklers within plasma booth dust collectors and the complete replacement of the building fire alarm system. This effort is a 100 percent small business set-aside and is restricted exclusively to current Tinker AFB MACBOA holders under NAICS 236220. The project requires a mandatory performance period of 300 calendar days, starting within 10 days of the notice to proceed. The government is utilizing a two-step sealed bidding process. Step one requires prime contractors to attend a mandatory site visit and submit a technical proposal without pricing; only those found technically acceptable proceed to step two. In the second step, eligible offerors submit a price bid, and the award is granted to the lowest evaluated priced proposal that meets all technical and responsibility standards. Key requirements include the submission of bid, performance, and payment bonds, as well as compliance with the Buy American Act and specific cybersecurity standards. Invoicing and payments are processed electronically through the Wide Area WorkFlow system.
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
Federal
WWYK240015 - Rehab Tanks 62501E & 62501W
Solicitation # FA813726R0020
Solicitation FA813726R00020, project WWYK240015, is a request for proposals for the rehabilitation of tanks 62501E and 62501W at the Tinker Air Force Base Industrial Waste Treatment Plant in Oklahoma. The scope of work includes replacing failed internal coatings, repairing or replacing the cathodic protection system, repairing secondary containment seals, and removing construction waste from the secondary containment. Additionally, the project requires the replacement of electrical systems for the raised platform and the cleaning and recoating of exterior stairs and structures. This opportunity is exclusively open to current MAC BOA holders at Tinker AFB, and attendance at the initial site visit was mandatory for eligibility. The project is scheduled for completion within 310 calendar days from the receipt of the Notice to Proceed. Award will be based on the Lowest Priced Technically Acceptable (LPTA) source selection procedure, where the contract is awarded to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations focus on capability and management, requiring a detailed project narrative and a project-specific approach. The contract incorporates various FAR and DFARS clauses, including Davis-Bacon wage requirements and specific cybersecurity and safety standards. Although the solicitation process included multiple updates regarding RFIs and site visits, the posting was officially cancelled on October 28, 2026.
Commercial and Institutional Building Construction

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
WWYK100209-Repair Perimeter Dr and Industrial Blvd
Solicitation # FA813727R0003
Solicitation FA813727R0003 is a pre-solicitation for the full depth replacement of Perimeter Drive and specific sections of Industrial Boulevard at Tinker Air Force Base, Oklahoma. This opportunity is strictly set aside for SBA Certified Women-Owned Small Businesses (WOSB), with an estimated project value between 5 million and 10 million dollars. The scope of work includes providing all labor, materials, and equipment to remove and replace damaged or severely cracking concrete, as well as installing pavement markings. A mandatory site visit is scheduled for October 20, 2026, requiring an RSVP by October 16, 2026, and requests for information are due by October 27, 2026. The contract mandates strict adherence to quality and safety standards, including the Davis-Bacon Act, EM 385-1-1 safety requirements, and Foreign Object Debris awareness training for all personnel. Key personnel requirements include a Project Manager with 10 years of commercial construction experience and a Superintendent with at least five years of experience. Deliverables include a baseline construction schedule due within 10 calendar days of the Notice to Proceed, weekly inspection records, and final as-built drawings in both PDF and AutoCAD formats. The contractor is responsible for a comprehensive inspection process, including a contractor punch-out inspection and a pre-final inspection within five days of substantial completion.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in about 19 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS