Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alaska was posted on October 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tanacross Sewer System Improvements Project

Closed
IFB ANTHC 26-B-12419State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. This design-bid-build project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new process systems, administrative and support buildings, and utility connections. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. The project also requires a 12-month operational support period following construction. The estimated magnitude of construction exceeds 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a revised assumed Notice to Proceed date of April 1, 2027. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating proposals based on technical experience, technical approach, management approach, key personnel experience, and price. Key personnel requirements include a Project Manager, Construction Superintendent, Quality Control Manager, Safety Specialist, and Historic Preservation Treatment Specialist. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements emphasize strict cybersecurity hygiene for SCADA/MES equipment, granting the government full access to software source code, and compliance with ADA standards. Invoicing is managed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a draft review by the Contracting Officer's Representative seven days prior to final submission.
Dsc Contracting Services Division

POSTED

about 17 hours ago

DEADLINE

in 21 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

8 days ago

DEADLINE

in 2 months
NAICS: 221320
Federal
Waste Water Treatment Plant Services
Solicitation # FA448627Q0002
Solicitation FA448627Q0002 is a Request for Quotation issued by the Department of the Air Force for Waste Water Treatment Plant Services at Lajes Field in Praia da Vitoria, Azores, Portugal. The contractor will be responsible for the operation and maintenance of a waste water treatment plant with a capacity of 800,000 gallons per day, as well as the associated lift station, oil-water separator, and grease traps. Key requirements include providing a Lead Operator with a Level II or higher WPI Certification and at least three years of experience, implementing a 52-week preventive maintenance plan, and ensuring compliance with ISO/IEC 17025 laboratory standards and Portuguese decree law 183/2009 for waste landfills. The scope also encompasses corrosion control, painting, and the management of hazardous materials. The government intends to award a single Firm-Fixed-Price contract with a total duration not to exceed 66 months, consisting of a base period and four option periods. This is an unrestricted acquisition, and proposals must be submitted electronically by November 23, 2026, at 14:00 Azores Time. Offers are evaluated through a three-step sequential process: an administrative compliance review, a technical acceptability evaluation based on experience, approach, and a quality control plan, and finally a price evaluation in Euro currency. Award is contingent upon the availability of funds. Payments will be processed electronically via the Wide Area WorkFlow system.
FA4486 765 Abs Conf

POSTED

16 days ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract pertains to the Tanacross Sewer System Improvements Project in Alaska, with an estimated total cost ranging from approximately $1.2 million to $1.4 million. It encompasses three main phases: the initial phase involves constructing a lift station and installing the first 10 linear feet of force main; the second phase includes building a septic system, extending the force main, and decommissioning the existing septic infrastructure; the third phase offers an additive alternate for sewer main and manhole repairs. The contractor is responsible for providing all necessary labor, materials, equipment, testing, and services, with specific expertise required in gasketed joint sewer pipe installation, manhole structures, wastewater bypass pumping, HDPE pipe fusion, earthwork, and camera inspection of buried sewer mains. The project is scheduled for substantial completion by November 16, 2026, with final completion by November 30, 2026, and the award will depend on the bid submission of both the base bid and any additive alternates, contingent on available funding. The solicitation, issued by the Alaska Native Tribal Health Consortium under solicitation number IFB ANTHC 26-B-12419, was posted on October 24, 2025, with a response deadline of November 20, 2025. The project’s scope and specifications are detailed through various documents, including technical plans, project manuals, and bid instructions. The bidding process emphasizes transparency and compliance, with the potential for adjustments based on funding availability. The project aims to enhance wastewater infrastructure in the region, ensuring reliable and efficient sewer service through comprehensive construction phases and adherence to technical standards.

General Info

Place of Performance

AK, USA

Set-Aside

NONE

Documents

2

IFB 25-09-563 1501 South Lot Concrete Drive Project Manual Issued for Bids Oct 24 2025

PDF, High priority: read this first238 pages · ifb
High

IFB 25-09-563 IndyGo 1501 South Lot Concrete Drive Plan Set

PDF, High priority: read this first3 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlaska Native Tribal Health Consortium
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Project includes the following Work: Phase 1 - Lift Station work, and the first 10 LF of the force main. Phase 2 - Construction of the septic system, force main, and abandoning of the existing septic system and force main. Phase 3 – Additive Alternate: Sewer Main and Manhole Repairs. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with gasketed joint sanitary sewer pipe installation, sewer manhole structures, performance of wastewater bypass pumping, fusion of HDPE pipe for pressurized conveyance and general civil utility excavations, earthwork, and camera inspection of buried gravity sewer main. Estimated Cost Range: Owner anticipates that the Work’s total bid price will be approximately $1,200,000 – $1,400,000. Anticipated Schedule: The Project has an expected substantial completion date of November 16, 2026 and final completion date of November 30, 2026. Award Statement: Award will be based on the total of the Base Bid and Additive Alternates, dependent on available funding.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS