Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on December 4, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Target

Closed
HQ0147-09-R-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336414
New
Federal
Sole Source to Raytheon | Ukraine PATRIOT Depot Test Equipment (DTE)
Solicitation # SPRRA2-27-R-SP03
The Defense Logistics Agency is conducting market research via a Sources Sought Synopsis to identify qualified manufacturers and suppliers to support the operational readiness of the Ukraine Phased Array Tracking Radar for Intercept on Target (PATRIOT) System. The requirement involves providing Depot Test Equipment (DTE), including PAT243 Oil Processing Stations, PAT24X High Voltage Power Supply Test Stations, CLET TS Cooler Liquid Electron Tube/Transmitter Pumping Unit Test Stations, CDU Testers, Raytheon Test Automatic Continuity Stations (RTACS), and PAO Processors. Additionally, the scope includes site surveys, installation, on-the-job training, installation kit electronic equipment, gold units or emulators, and a five-year supply of test station spares. The government intends to award this contract to Raytheon as the sole responsible source under FAR 6.302-1(a)(1). The selected contractor will be responsible for all recurring and nonrecurring engineering, supply chain management, logistics, and the procurement of long-lead parts. Performance timelines are measured in months after contract award, with site surveys due at 26 months and various hardware deliveries ranging from 31 to 50 months. Essential government furnished property, including a compliant facility and specific fluids such as PAO and EGW, will be provided to support installation and acceptance testing.
Al DLA Aviation At Huntsville

POSTED

3 days ago

DEADLINE

in 12 days

General Info

NAICS

336414 - Guided Missile and Space Vehicle Manufacturing

Place of Performance

various, AL, USA

Set-Aside

NONE

Documents

50

Draft Section L - All-Up-Round Targets Instructions

PDF, High priority: read this first50 pages · rfp
High

Draft Section L - Instructions for Proposal (All-Up-Round Targets)

PDF, High priority: read this first52 pages · rfp
High

Draft Section M - Evaluation Factors

PDF, High priority: read this first16 pages · specifications
High

Draft Section M - Evaluation Factors

PDF, High priority: read this first15 pages · specifications
High

Draft SOO - Target Design, Manufacture, Launch Operations, Logistics, and Support

PDF, High priority: read this first14 pages · sow
High

H00147-09-R-0011 - Solicitation for Ballistic Missile Targets

PDF, High priority: read this firstrfp
High

HQ0147-09-R-0011 DD Form 254

PDF, High priority: read this first10 pages · specifications
High

HQ0147-09-R-0011 Draft RFP Cover Letter - Targets and Countermeasures

PDF, High priority: read this first3 pages · rfp
High

HQ0147-09-R-0011 Industry Q&A Part 2

PDF, High priority: read this first35 pages · q-and-a
High

HQ0147-09-R-0011 Industry Questions and Responses - Group 1

PDF, High priority: read this first19 pages · q-and-a
High

HQ0147-09-R-0011 Industry Questions and Responses - Part 1 of 2

PDF, High priority: read this first35 pages · q-and-a
High

HQ0147-09-R-0011 Industry Questions and Responses - Part 2 of 2

PDF, High priority: read this first22 pages · q-and-a
High

HQ0147-09-R-0011 Medium Range Target Procurement

PDF, High priority: read this first93 pages · rfp
High

HQ0147-09-R-0011 - Medium Range Target Procurement

PDF, High priority: read this first93 pages · rfp
High

HQ0147-09-R-0011 Section L Attachment 2 - Past Performance Transmittal Letter

PDF, High priority: read this first1 page · past-performance
High

HQ0147-09-R-0011 Section L Attachment 3 - Subcontractor Consent Form

PDF, High priority: read this first1 page · past-performance
High

HQ0147-09-R-0011 Update to Draft RFP - Targets and Countermeasures

PDF, High priority: read this first2 pages · amendment
High

Performance-Based Payments Process Narrative and Milestone Schedule

PDF, High priority: read this first6 pages · specifications
High

RFP HQ00147-09-R-0011 Attachment 4 - Commercial Client Authorization Letter

PDF, High priority: read this first1 page · past-performance
High

RFP HQ00147-09-R-0011 Section L Attachment 4 - Commercial Client Authorization Letter

PDF, High priority: read this first1 page · past-performance
High

RFP HQ0147-09-R-0011 Attachment 2 Section L - Past Performance Transmittal Letter

PDF, High priority: read this first1 page · past-performance
High

RFP #HQ0147-09-R-0011 Section L Attachment 3 - Subcontractor Consent Form

PDF, High priority: read this first1 page · past-performance
High

RFP HQ0147-09-R-0011 Section L Attachment 5 - Past Performance Questionnaire Tracking Record

PDF, High priority: read this first1 page · past-performance
High

Section J Attachment 3 - Task Instructions Template

PDF, High priority: read this first2 pages · specifications
High

Section L Attachment 1: Performance Questionnaire

PDF, High priority: read this first4 pages · past-performance
High

Section L Attachment 1: Performance Questionnaire

PDF, High priority: read this first4 pages · past-performance
High

Section L - Instructions for Proposal (Rev 18)

PDF, High priority: read this first62 pages · rfp
High

Section M Evaluation Factors - Rev 14

PDF, High priority: read this first9 pages · specifications
High

Statement of Objectives for Target Design, Manufacture, Launch Operations, Logistics, and Support

PDF, High priority: read this first8 pages · sow
High

Statement of Objectives: Target Design, Manufacture, Launch Operations, Logistics, and Support

PDF, High priority: read this firstsoo
High

Target Launch Vehicle and Payload Services CDRL

PDF, High priority: read this firstcdrl
High

Target Launch Vehicle and Payload Services - Contract Data Requirements List (CDRL)

PDF, High priority: read this first57 pages · cdrl
High

Targets and Countermeasures Program - Award Fee Determination Plan

PDF, High priority: read this first13 pages · award-fee-plan
High

Directions to Bradford Building

PDF, Low priority2 pages · other
Low

DRFP HQ0147-09-R-0011 Comment Matrix

PDF, Low priority1 page · q-and-a
Low

HQ0147-09-R-0011 Industry Comments Blank Matrix

XLS, Low priority1 page · q-and-a
Low

HQ0147-09-R-0011 Industry Day Update

PDF, Low priority2 pages · industry-day
Low

HQ0147-09-R-0011 Industry Q&A - Group 2

PDF, Low priority4 pages · q-and-a
Low

HQ0147-09-R-0011 Targets and Countermeasures DRFP Notice

DOC, Low priority2 pages · presolicitation
Low

HQ0147-09-R-0011 Targets and Countermeasures PCO Cover Letter

PDF, Low priority1 page · special-notice
Low

HQ0147-09-R-0011 Targets and Countermeasures Treaty Compliance Notice

PDF, Low priority3 pages · presolicitation
Low

HQ0147-09-R-0011 Update to Draft RFP - Targets and Countermeasures

PDF, Low priority2 pages · presolicitation
Low

Industry Day Registration Form - August 20, 2009

DOC, Low priority1 page · industry-day
Low

Industry Day Registration Form - August 22, 2009

DOC, Low priority1 page · industry-day
Low

MDA Huntsville Visit Authorization Request Instructions

PDF, Low priority1 page · special-notice
Low

MDA Industry Day Briefing - Target and Countermeasures (June 2009)

PDF, Low priority6 pages · industry-day
Low

RFP HQ0147-09-R-0011 Section L Attachment 5 - Past Performance Questionnaire Tracking Record

PDF, Low priority1 page · past-performance
Low

Targets Industry Day Registration Form (July 2009)

DOC, Low priority1 page · industry-day
Low

Directions+to+VBII.ppt

PPT

Industry+Day+Briefing+200900713+JAK.ppt

PPT

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

14 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline time changed from 3:00 PM UTC to 2:00 PM UTC on Jul 17, 2009. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jul 17, 2009 to Aug 21, 2009. The notice description changed.

Notice updated

Response deadline time changed from 1:00 AM UTC to 11:00 PM UTC on Aug 21, 2009. The notice description changed.

Notice updated

Response deadline time changed from 11:00 PM UTC to 10:00 PM UTC on Aug 21, 2009. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 21, 2009 to Sep 8, 2009. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 8, 2009 to Dec 1, 2009. The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Dec 1, 2009 to Dec 5, 2009.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Missile Defense Agency (mda)
Contacts2 people available
OfficeHUNTSVILLE, AL, 35898, USA
Office AddressHUNTSVILLE, AL, 35898, USA

Full Description

Show more
No final solicitation will be issued nor will an award be made under Draft Request for Proposal (DRFP) HQ0147-09-R-0011. Requirements in DRFP HQ0147-09-R-0011 will be solicited and awarded by class under separate solicitations. The Missile Defense Agency's (MDA) acquisition strategy presented under HQ0147-09-R-0011 has been revised in that separate solicitations are anticipated to be issued for MDA's target requirements by class. Presolicitation notices for the target requirements will be posted incrementally to FedBizOpps beginning September 4, 2009 with the MRBM Type 1 under solicitation HQ0147-09-R-0015. MDA intends to solicit, evaluate and award target classes independently and based on the following Integrated Master Test Plan - need date priority order: (1) MRBM Type 1 (definition modified from DRFP HQ0147-09-R-0011) ; (2) Intermediate Range Ballistic Missile (3) MRBM Type 2, (definition modified from DRFP HQ0147-09-R-0011) (4) Intercontinental Ballistic Missile, and (5) Short Range Ballistic Missile.

More opportunities from Department Of Defense → Missile Defense Agency (mda)

Same awarding agency

NAICS: 541715
New
Federal
Missile Defense Agency - Nimble Options for Buying Layered Effects (NOBLE) Announcement
Solicitation # HQ0860-25-S-0001
The Missile Defense Agency Nimble Options for Buying Layered Effects (NOBLE) Announcement, solicitation number HQ0860-25-S-0001, is an overarching acquisition strategy active from March 27, 2025, through March 27, 2030. Rather than a single contract, it serves as a consolidated framework to rapidly develop, prototype, and field disruptive missile defense technologies across the entire kill chain. The program focuses on three primary technical areas: Kinetic and Hypersonic Defense for cost-efficient interceptors, Command, Control, and Battle Management utilizing AI and quantum computing, and Space-based Sensors, Interceptors, and Effectors to maintain space domain awareness. Under this framework, the MDA will release individual solicitations using various authorities, including FAR-based procurement contracts and Other Transaction (OT) agreements. Each individual solicitation will define its own specific technical requirements, evaluation criteria, funding levels, and submission deadlines. Interested parties must be registered in the System for Award Management (SAM) and are directed to monitor SAM.gov and the MDA Opportunity Marketplace for new opportunities, such as the Mobile Integrated Launch Capability, Low-Cost Kill Vehicle, and Shipborne Phased Array Instrumentation Radar. All offerors are subject to Organizational Conflict of Interest rules per FAR Subpart 9.5 and DFARS Subpart 209.5. Security requirements include compliance with NIST SP 800-171 and the Cybersecurity Maturity Model Certification (CMMC) program, with some efforts requiring secure interfacing with classified systems. All unclassified communications regarding the NOBLE program should be directed to MDA-NOBLE@mail.mil.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

4 days ago

DEADLINE

in over 3 years
View Details
NAICS: 541715
Federal
Mobile Integrated Launch Capability
Solicitation # 26-MDA-12366
The Missile Defense Agency (MDA) is soliciting innovative and cost-efficient alternatives to current air drop C-17 target launches through the Mobile Integrated Launch Capability (MILC) program. The objective is to develop mobile launch platforms capable of deploying short to long range target missile systems from any location worldwide to increase launch cadence and reduce costs. This effort is structured in two phases: Phase I focuses on detailed design, engagement analysis, and prototype costing with an objective performance period of three to six months; Phase II involves prototyping, ground testing, and the delivery of one launch platform for a target vehicle system launch, with an objective performance period of twelve to twenty-four months. The solicitation is open to large and small businesses, non-traditional defense contractors, and accredited educational institutions. Interested parties must submit white papers detailing their technical approach, design concepts, and a Rough Order of Magnitude cost estimate. Selection is based on a two-step process evaluating technical merit, innovation, potential utility to agency programs, schedule, and lifecycle cost. Awardees must possess an active Secret Facility Clearance and adhere to strict cybersecurity and Controlled Unclassified Information (CUI) marking requirements. The MDA will consider various contract types, including fixed price and cost reimbursement, as well as Other Transaction (OT) Agreements.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

16 days ago

DEADLINE

in almost 2 years
View Details
NAICS: 541715
Federal
Missile Defense Agency - Advanced Capability Concepts
Solicitation # HQ0860-25-S-C001
The Missile Defense Agency (MDA) Advanced Capability Concepts solicitation, HQ0860-25-S-C001, is an ongoing effort to identify and acquire innovative concepts, technological breakthroughs, prototype demonstrations, and scientific innovations to enhance the robustness and effectiveness of all Missile Defense System elements. This solicitation is open for a five-year period from May 9, 2025, to May 8, 2030, and utilizes a two-step competitive process. In the first step, industry partners submit white papers for evaluation based on technical merit, importance to agency programs, and funding availability. Selected offerors then proceed to a second step involving detailed negotiations. The agency is open to various contract types and authorities, including FAR-based procurements, Other Transaction (OT) agreements, Broad Agency Announcements (BAA), Prototype Entry Points (PEP), and Commercial Solutions Openings (CSO). White paper submissions must be sent electronically to MDA.ACC-WP@mail.mil and include a title page, executive summary, program description, program plan with a milestone chart, description of prior work, a Rough Order of Magnitude cost estimate, and a program summary quad chart. Evaluation is weighted heavily toward technical achievement (50%), with research capabilities (25%) and program management (25%) making up the remainder. Offerors must be registered in the System for Award Management (SAM) and are required to disclose any organizational conflicts of interest using MDA Form DA-78-F2. Security requirements include compliance with NIST SP 800-171 and the Cybersecurity Maturity Model Certification (CMMC) program where applicable.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

20 days ago

DEADLINE

in over 3 years
View Details
NAICS: 541715
Federal
**PRE-SOLICITATION NOTICE** Forward Based Mode Radar Next Prototype
Solicitation # MDA26SNSPN04
The Missile Defense Agency (MDA) Mobile Land-Based Sensors Project Office is seeking innovative prototype concepts for the Forward-Based Mode (FBM) Radar Next. This effort, conducted under the Nimble Options for Buying Layered Effects (NOBLE) Other Transaction Authority (OTA) pursuant to 10 U.S.C. 4022, aims to rapidly develop a highly mobile, rapidly deployable sensor system. The primary objective is to enhance the early warning, tracking, and discrimination of complex, high-speed, and maneuverable threats, including ballistic, cruise, and hypersonic missiles, while ensuring seamless integration into the existing Command and Control, Battle Management, and Communications (C2BMC) architecture. The prototyping process is structured into four phased cycles: Concept Development, Technology and Manufacturing Readiness and Extensibility, Subscale Prototype and Modeling and Simulation, and Full-Scale Prototype Development and Demonstration. Key technical requirements include C-17 military airlift and tactical ground vehicle compatibility, rapid setup and teardown capabilities, and a modular open-system architecture. Performance will be evaluated through a series of pass/fail gates focusing on hardware/software readiness, manufacturing feasibility, and operational utility. The government encourages collaborative teaming between prime contractors, non-traditional defense contractors, and small businesses, expecting a shared commitment through resource alignment or co-investment. All offerors must possess or obtain a Facility Security Clearance through the Defense Counterintelligence and Security Agency prior to the start of the first cycle. Performance will take place at Redstone Arsenal, Alabama. This notice serves as a pre-solicitation and does not constitute a formal request for proposal.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS