Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tarpon Center Drive Seawall Replacement (Water Main Replacement Program Phase 8A)

Closed
ITB-3169-24-0-2024/PBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

about 21 hours ago

DEADLINE

in 19 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract involves comprehensive construction work to replace a seawall along Tarpon Center Drive, including utility relocations such as gravity sewer, force main, and water services, as well as road reconstruction, reef ball installation, median adjustments, sidewalk replacement, and related improvements. The project specifically covers Phase 8A, which spans approximately 400 linear feet from the Esplanade/Tarpon Center intersection along Tarpon Center, with the remaining phases, including water main replacement (Phase 8B), to be bid separately at a later date. A significant component of the work involves the removal and abandonment of existing asbestos cement water mains, requiring strict adherence to EPA, OSHA, and other regulatory standards for asbestos handling, including prohibition of compressed air cleaning and proper disposal at permitted landfills. The contractor is responsible for providing all labor, materials, equipment, permits, insurance, and services necessary to complete the project in accordance with the project drawings and specifications, ensuring the work is finished in a manner that allows continuous service and includes necessary repairs, testing, cleanup, and restoration. All work must comply with applicable municipal, county, state, and federal codes. The project is funded through Florida Department of Environmental Protection Resiliency Grant Funds, with a completion deadline of July 31, 2025, to meet grant conditions. The project’s estimated value ranges from two to five million dollars, and interested bidders can find further details through the provided demand star link.

General Info

Agency

Florida → City of Venice

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Venice
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → City of Venice
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project includes removing and replacing a seawall along with utility relocation including gravity sewer, force main and water services, road reconstruction, reef ball installation, median adjustment, sidewalk replacement and related improvements. Phase 8A represents the portion of the project from The Esplanade/Tarpon Center intersection and continuing along Tarpon Center for approximately 400 LF. The remainder of the project (Water Main Replacement Program Phase 8B) will be bid separately at a future date.
This project includes abandonment and removal of existing Asbestos Cement (AC) pipe water mains. The Contractor shall furnish all permits, labor, material, services, insurance, tools, equipment, and notifications in accordance with EPA, OSHA, State Local, and all other applicable agencies to handle and remove asbestos material. Use of compressed air to clean pipe or crushing AC Pipe is prohibited. At no time shall AC Pipe or pieces of AC Pipe be mixed in with fill materials. All scrap AC material shall be delivered to a landfill permitted for disposal of non-friable asbestos containing materials.
The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete all work required by these Specifications and as shown on the Drawings. The Contractor shall perform the work complete, in place and ready for continuous service, and shall include repairs, testing, permits, clean-up, replacements and restoration required as a result of damages caused during this construction. All materials, equipment, skills, tools and labor which is reasonably and properly inferable and necessary for the proper completion of the work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to the proposed construction work.
This project is funded with Florida Department of Environmental Protection Resiliency Grant Funds and must comply with all terms of the grant agreement. All work must be complete by July 31, 2025, to comply with grant conditions.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS