Tarpon Center Drive Seawall Replacement (Water Main Replacement Program Phase 8A)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves comprehensive construction work to replace a seawall along Tarpon Center Drive, including utility relocations such as gravity sewer, force main, and water services, as well as road reconstruction, reef ball installation, median adjustments, sidewalk replacement, and related improvements. The project specifically covers Phase 8A, which spans approximately 400 linear feet from the Esplanade/Tarpon Center intersection along Tarpon Center, with the remaining phases, including water main replacement (Phase 8B), to be bid separately at a later date. A significant component of the work involves the removal and abandonment of existing asbestos cement water mains, requiring strict adherence to EPA, OSHA, and other regulatory standards for asbestos handling, including prohibition of compressed air cleaning and proper disposal at permitted landfills. The contractor is responsible for providing all labor, materials, equipment, permits, insurance, and services necessary to complete the project in accordance with the project drawings and specifications, ensuring the work is finished in a manner that allows continuous service and includes necessary repairs, testing, cleanup, and restoration. All work must comply with applicable municipal, county, state, and federal codes. The project is funded through Florida Department of Environmental Protection Resiliency Grant Funds, with a completion deadline of July 31, 2025, to meet grant conditions. The project’s estimated value ranges from two to five million dollars, and interested bidders can find further details through the provided demand star link.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project includes abandonment and removal of existing Asbestos Cement (AC) pipe water mains. The Contractor shall furnish all permits, labor, material, services, insurance, tools, equipment, and notifications in accordance with EPA, OSHA, State Local, and all other applicable agencies to handle and remove asbestos material. Use of compressed air to clean pipe or crushing AC Pipe is prohibited. At no time shall AC Pipe or pieces of AC Pipe be mixed in with fill materials. All scrap AC material shall be delivered to a landfill permitted for disposal of non-friable asbestos containing materials.
The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete all work required by these Specifications and as shown on the Drawings. The Contractor shall perform the work complete, in place and ready for continuous service, and shall include repairs, testing, permits, clean-up, replacements and restoration required as a result of damages caused during this construction. All materials, equipment, skills, tools and labor which is reasonably and properly inferable and necessary for the proper completion of the work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to the proposed construction work.
This project is funded with Florida Department of Environmental Protection Resiliency Grant Funds and must comply with all terms of the grant agreement. All work must be complete by July 31, 2025, to comply with grant conditions.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS