TD2222496 Crumner Targeted Undergrounding Project, (Notification of Lake or Streambed Alteration, No. EPIMS-LAN-62397-R5)

Forecast
EPIMS-LAN-62397-R5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Agoura Hills, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-LAN-62397-R5, pursuant to section 1602 of the Fish and Game Code to Southern California Edison Company. The Project includes trenching approximately 315 feet of the right bank of a novel stream to bury existing distribution lines. The trench will be approximately 18 inches wide and five feet deep and electrical conduit will be installed and capped in concrete. There is a total of 0.036 acre of temporary impacts and 0.01 acre of permanent impacts from staging, excavating, side casting, overland travel, vegetation removal and general work activities. Most of the Project impacts are to sandbar willow thickets, western sycamore, black sage scrub and coyote brush scrub habitats. The Project will include restoration via re-planting of native plants, invasive plant removal, and success monitoring.

More opportunities from California → Fish and Wildlife, Region 5 - South Coast, San Diego

Same awarding agency

NAICS: 237130
SLED
TD2070167 Soledad Canyon Road Grid Resiliency Project (Notification of Lake or Streambed Alteration, No. EPIMS-LAN-52926-R5)
Solicitation # EPIMS-LAN-52926-R5
The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement EPIMS-LAN-52926-R5 for the Soledad Canyon Road Grid Resiliency Project, conducted by Southern California Edison Company in Santa Clarita, California. The project involves infrastructure improvements within the Santa Clara River, specifically focusing on vegetation management, the installation and replacement of screw-plate anchors at utility poles 1059470E and 1059471E, and the removal of pole 1059471E. This amendment modifies the project access route to utilize Duane R Harte Park and the Santa Clara River Trail, which reduces temporary impacts to less than 0.401 acre and introduces helicopter setting for pole replacement. The agreement is categorically exempt under CEQA and carries an administrative amendment fee of 1,979.25 dollars. The agreement remains effective until January 20, 2030, and requires strict adherence to Fish and Game Code section 1600 et seq. Key obligations include the submission of a Protection Measure Reporting Plan, as-built designs, and GIS shapefiles via the EPIMS portal. Performance requirements mandate daily equipment maintenance to prevent leaks, post-storm inspections of project areas, and the presence of a Designated Monitor during all concrete pouring activities. To ensure environmental transparency, the permittee is prohibited from entering into confidentiality agreements with biological monitors that would impede communication with the agency. Final construction reports must be submitted within 60 days of the completion of activities.
Power and Communication Line and Related Structures Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Wetland Reserve Coastal Habitat Restoration & Resiliency Project (Restoration Management Permit No. RMP-2026-0040-R5)
Solicitation # RMP-2026-0040-R5
On July 16, 2026, the California Department of Fish and Wildlife issued Restoration Management Permit RMP-2026-0040-R5 to the Buena Vista Audubon Society, represented by Natalie Shapiro, authorizing the Wetland Reserve Coastal Habitat Restoration & Resiliency Project at Buena Vista Lagoon in Oceanside and Carlsbad, California. The project, encompassing 5.95 acres, aims to establish, restore, and enhance wetland, transitional, and upland habitats to deliver substantial and cumulative benefits to native wildlife, plants, and their ecosystems. The project has been officially designated a Qualifying Restoration Project under Fish and Game Code section 1671(d)(1) and is exempt from California Environmental Quality Act review under Public Resources Code section 21080.56, with concurrence from the CDFW Director and final approval by the City of Oceanside. The permit issuance follows prior regulatory actions, including an exemption determination on January 27, 2025, and the project’s place of performance is centered at the northeast corner of South Coast Highway and Eaton Street, with the implementing organization based at PO Box 480, Oceanside, CA. No federal contract clauses, acquisition regulations, pricing, payment terms, or procurement evaluation criteria apply, as this is a state environmental permit, not a federal procurement instrument. The California Department of Fish and Wildlife’s Region 5–South Coast office, located in San Diego, administers the permit, with Frederic (Fritz) Rieman serving as the primary point of contact and Erinn Wilson-Olgin as Regional Manager. No contractual delivery schedules, performance metrics, inspection standards, packaging requirements, or financial obligations are specified, as the document functions solely as a regulatory authorization under state law to execute ecological restoration.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS