Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Temporary Concrete Barrier Relocation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the relocation of temporary concrete barriers equipped with cross-bolt connections used for traffic control purposes. The work is classified under the NAICS code 237310, which pertains to highway, street, and bridge construction. The subcontract is being offered by the Illinois Construction agency and the place of performance is specified as Downers Grove, Illinois, with the postal code 60515. The project focuses on repositioning these barriers to manage traffic flow safely and efficiently, ensuring proper installation and stability of the barriers during the relocation process. Although some administrative details such as solicitation number and point of contact are not provided, interested parties can find more information through the provided Illinois bid portal link. The contract announcement was posted on October 17, 2025.

General Info

Relocation of temporary concrete traffic barriers in Downers Grove, Illinois for traffic control.

Place of Performance

Downers grove, IL, 60515, USA

Set-Aside

NONE

Documents

This scope was carved out of RR-25-2026.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-557THA-ENGCO-B-49754 | RR-25-2026 Reagan Mem. Tollway I-88 Bridge Rehab. Howland Creek to IL Rte 26 Ramp MP 44.5-MP 54.4

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 11 documents on the prime contractFrom 26-557THA-ENGCO-B-49754 | RR-25-2026 Reagan Mem. Tollway I-88 Bridge Rehab. Howland Creek to IL Rte 26 Ramp MP 44.5-MP 54.4
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Construction
ContactsNo contacts available
OfficeN/A
Organization / AgencyIllinois → Construction
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Relocation of temporary concrete barriers with cross-bolt connections for traffic control.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details

More opportunities from Illinois → Construction

Same awarding agency

NAICS: 237310
SLED
I-25-2001 Tri-State Tollway (I-294) Bridge Construction 107th St to Illinois Rte 43 (Harlem Ave.)
Solicitation # 27-557THA-ENGCO-B-54761
The Illinois Tollway is seeking a Construction Manager / General Contractor (CM/GC) for the reconstruction of multiple structures and roadway improvements along the Tri-State Tollway (I-294) in Cook County, specifically between 107th Street and Illinois Route 43 (Harlem Avenue). This Category F project has an estimated value between 150 and 200 million dollars and involves the reconstruction of bridges over 107th Street, the Norfolk Southern Railroad, Southwest Highway, and Illinois Route 43, as well as a culvert over Stony Creek. The project is structured in two phases: Phase One, where the contractor acts as a consultant during the design phase to develop cost models, open book estimates, and project schedules, and Phase Two, where the contractor transitions into the General Contractor role for construction. The procurement follows a two-step, Best Value process. First, a Request for Qualifications (RFQ) will be used to shortlist between two and five proposers based on their Statement of Qualifications, focusing on relevant past project experience and the skills of key personnel. Shortlisted firms will then submit a comprehensive proposal consisting of technical, price, and administrative components. The final award will be based on the highest combined score of the technical and price proposals. Proposers must certify compliance with the Illinois Procurement Code regarding conflicts of interest and disclose any organizational conflicts. Key milestones include the release of the RFQ on December 7, 2026, and the estimated release of the RFP on March 15, 2027.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS