This Subcontract opportunity from California was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Temporary Concrete Washout Facility
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the installation and ongoing maintenance of a temporary concrete washout facility in the Eastern Goleta Valley, 93111, aimed at preventing the discharge of concrete slurry and other hazardous materials into the environment. This effort is designed to ensure compliance with environmental regulations and mitigate the risk of waterway contamination, soil degradation, and harm to local ecosystems. The facility will serve as a controlled, designated area for cleaning equipment and tools associated with concrete work, capturing and containing runoff before it can reach storm drains or natural water sources. The subcontract is issued by the County of Santa Barbara Department of Public Works Transportation Division and is subject to a response deadline of August 18, 2026. The North American Industry Classification System code 238990 identifies the work under miscellaneous specialty trade contractors, indicating that the scope includes specialized environmental control measures rather than standard construction activities. Performance will occur entirely at the designated site in the Eastern Goleta Valley, and all work must be completed in accordance with local, state, and federal environmental standards. The contractor is responsible for both the setup and continued operational upkeep of the washout system throughout the duration of the project, ensuring it remains functional, clean, and compliant at all times.
General Info
Place of Performance
Eastern Goleta Valley, CA, 93111, USASet-Aside
Documents
This scope was carved out of 25STM3-2N04.
The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.
Maria Ygnacio Bike Path Storm Repairs
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
