Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Temporary Electrical Service Installation

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

VA

Set-Aside

SBA

Documents

This scope was carved out of 140F0S26Q0051.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

54--IA-NEAL SMITH NWR-TEMP MODULAR OFFICE

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Fws Contracting Activity
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs electrical service for prime contractors on USFWS projects at the Neal Smith National Wildlife Refuge. Runs electrical service from the existing main distribution panel to the modular office unit and coordinates final connection with the building supplier. Adheres to applicable electrical codes and safety requirements. Delivers functional electrical power to the modular office.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Job Order Contracting: Electrical
Solicitation # ITB-2026-0005
The Port of Stockton is soliciting bids for a Job Order Contract (JOC) for electrical services under solicitation ITB-2026-0005. This indefinite quantity construction contract is designed for small to medium-sized repair, rehabilitation, replacement in kind, and minor new construction projects across various Port facilities in Stockton, California. The contract utilizes a Construction Task Catalog containing prepriced tasks with preset unit prices. Bidders must provide three adjustment factors to four decimal places: one for normal working hours, one for other than normal working hours, and one for non-prepriced tasks. Award is based on the lowest proposed price as determined by a weighted calculation of these adjustment factors. Qualified contractors must hold a California Class C-10 Electrical Contractor License, and all personnel on-site are required to obtain a Transportation Worker Identification Credential (TWIC). The project mandates strict adherence to NFPA 70, NEMA safety standards, and Caltrans specifications, with specific requirements for equipment labeling, cybersecurity (UL CCN CYBR), and hazardous material identification. Performance is managed through individual Job Orders, each with a lump sum fixed price derived from the approved price proposal. Bidders must submit a bid security of at least 10,000 dollars, and the successful awardee may be required to provide performance and payment bonds. Invoicing is handled through the Port's accounts payable department via email or mail, requiring detailed identification of tasks completed per the specific Job Order.
Port of Stockton

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
SLED
QSP-26265-342 Kidd Manor PHD Back Up Generator Project
Solicitation # QSP-26265-342
The Housing Authority of the County of Contra Costa (HACCC) is soliciting bids for the Kidd Manor PHD Back Up Generator Replacement Project in Martinez, California. This term contract requires the provision of all labor, materials, and equipment to replace the backup generator in accordance with manufacturer recommendations, NFPA standards, and State Fire Marshall requirements. The project is subject to the City of San Pablo's requirements and requires strict adherence to local, state, and federal codes. The anticipated period of performance is ninety calendar days from the start date, with liquidated damages of $200 per day assessed for delays beyond the completion date. Bids must be submitted via the designated e-Procurement portal by 2:00 P.M. Pacific Time on October 28, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of their ability, experience, licensing, and resources. Because the project is federally funded, contractors must comply with HUD Section 3 requirements and pay Davis-Bacon prevailing wage rates for construction work exceeding $2,000.00. Required documentation for the award includes a State of California contractor license, a valid W-9, and certificates for Worker's Compensation, General Liability, and Automobile insurance naming HACCC as an additional insured. Payment is issued on a net 30-day basis upon receipt of an invoice signed by the HACCC Project Manager.
Housing Authority of the County of Contra Costa

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Department Of The Interior → Fws Contracting Activity

Same awarding agency

NAICS: 321991
New
Federal
54--IA-NEAL SMITH NWR-TEMP MODULAR OFFICE
Solicitation # 140F0S26Q0051
The Department of the Interior's Fish and Wildlife Service is seeking a small business contractor for a firm fixed price rental contract to provide a temporary modular office building at the Neal Smith National Wildlife Refuge in Iowa. The required unit must be approximately 36 by 56 feet and include the delivery, installation, modification, maintenance, and eventual removal of the trailer. Key technical requirements include the installation of potable water and sanitary sewer laterals, electrical service from the existing main distribution panel, and low voltage wiring for phone and data. The facility must be ADA compliant, featuring accessible ramps with level, slip-resistant landings, which may be constructed on compacted gravel. Office furniture is not required, and bonding is not necessary as this is a rental rather than a construction contract. The total period of performance runs from November 30, 2026, to November 29, 2029, with the base year rental and billing beginning on November 30, 2026, the date by which the space must be fully set up and turned over for government occupancy. Proposals will be awarded to the responsible offeror with the lowest evaluated price that meets technical standards. Submission requirements include a non-price section containing floor plans, drawings, a written description, and an installation plan, as well as a completed price sheet. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform System.
Manufactured Home (Mobile Home) Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS