Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Massachusetts was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Erosion Control Measures – Removal and Replacement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Transportation Yard A Gate Modifications
Solicitation # 090226-1
Solicitation 090226-1 involves modifications to Gate A at the Twin Rivers Unified School District Transportation Yard located at 1400 Grand Avenue, Sacramento, California. The scope of work encompasses site demolition, earthwork, trenching, backfilling, asphalt paving, and site concrete work. Key deliverables include the installation of chain link and decorative metal fences and gates, the addition of four 10-foot square tubing posts, and the relocation and secure anchoring of existing Knox Boxes. The project requires strict adherence to technical standards, including ASTM F 1083 for steel pipe, ASTM C94 for 2,500 p.s.i. concrete, and ASTM D 6628 for pavement markings. All field welding must be performed by a Certified Structural Welder. The awarded contractor is responsible for all site safety and must submit a Site Safety Plan in compliance with DSA Bulletin BU 24-05. Specific operational requirements include maintaining clear utility markings, storing cement in weather-tight buildings, and ensuring accessibility compliance via ADA and CCR Title 24 warning surface tiles. Project oversight involves coordination with the District Construction Manager for underground work and notification of the Inspector, Architect, and DSA 48 hours prior to concrete placement. A mandatory pre-bid conference was scheduled for September 14, 2026, with a final response deadline of September 23, 2026.
TWIN RIVERS UNIFIED SCHOOL DISTRICT

POSTED

1 day ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract pertains to the removal and replacement of temporary erosion and sediment control measures including silt fences, wattles, and inlet protection systems within District 3 under the jurisdiction of the Massachusetts Department of Transportation. This subcontract involves the timely and compliant elimination of existing temporary controls that have served their purpose during construction activities and their replacement with new installations to maintain regulatory standards for sediment control and environmental protection. The work must be performed in accordance with applicable state and federal environmental regulations, ensuring minimal impact to surrounding ecosystems and waterways. All materials and installation methods must meet the technical specifications and performance criteria required by the agency. The solicitation was posted on July 28, 2026, with the same date set as the response deadline, indicating a rapid procurement timeline. The NAICS code 238990 identifies the work as other heavy and civil engineering specialization, confirming the specialized nature of the scope. The place of performance is limited to District 3, and no set-aside information or point of contact is provided, suggesting the subcontract is issued directly under a larger state infrastructure project with standardized procedures in place.

General Info

Remove and replace erosion controls in District 3 per state environmental regulations.

Agency

Massachusetts Department of TransportationView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

District 3, MA, USA

Set-Aside

NONE

Documents

This scope was carved out of 610535-134928.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 002 610535-134928

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Massachusetts Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal and replacement of temporary erosion and sediment control systems such as silt fences, wattles, and inlet protection.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS