Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Installation & Rigging Engineering Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Active Transportation Quick Build Design Services
Solicitation # 2025-RFP-158
The City of Cleveland's Mayor's Office of Capital Projects is soliciting proposals for Active Transportation Quick Build Design Services to support the Cleveland Moves multimodal transportation plan and Vision Zero goals. This initiative focuses on implementing rapid, low-cost safety and mobility improvements, including high-comfort bikeways, pedestrian safety upgrades, and ADA-compliant transit environments. The contract has an estimated value of 1,000,000 dollars for a two-year period or until funds are exhausted. Selected consultants must be Ohio Department of Transportation prequalified in relevant categories such as roadway design, bicycle facilities, and traffic signal design. The procurement process utilizes a two-phase evaluation to identify the most qualified firm at the best fee. Phase one assesses technical qualifications, weighting key personnel credentials at 30 percent, proposal quality at 25 percent, quality assurance processes at 20 percent, and demonstrated ability at 10 percent. Phase two is a pass/fail fee evaluation. Proposals must be submitted via OpenGov by November 11, 2026, and must include specific OEO schedules to meet minority, female, and small business participation goals. The resulting contract will utilize task orders negotiated as either lump-sum or cost-plus-fixed-fee amounts, with invoicing occurring monthly according to the City's professional services reimbursables policy.
Mayor's Office of Capital Projects

POSTED

about 16 hours ago

DEADLINE

in 10 days
NAICS: 541330
New
SLED
Utilities Augmented Staffing - Professional Engineering Services
Solicitation # 27-0016-RFQ-CCNAC
Pinellas County is seeking professional engineering services through a Continuing Professional Services Agreement to support its wastewater and water infrastructure renewal projects. The contract focuses on reducing infiltration and inflow and eliminating sanitary sewer overflows within a densely populated urban environment. The scope encompasses a wide array of engineering disciplines, including civil, electrical, environmental, geotechnical, structural, and mechanical services, as well as mapping, GIS, and construction management. The project involves managing a six-year Capital Improvement Plan with annual budgets of approximately 100 million dollars, with this specific contract estimated at 8 million dollars over a five-year term. The selection process is based on a point-scoring system that heavily weights firm experience with similar projects, past performance, and Small Business Enterprise status. Awardees must be registered with the Florida Division of Corporations and comply with various federal and state regulations, including the Clean Air Act, the Federal Water Pollution Control Act, and ADA accessibility standards. The agreement is structured around individual work assignments negotiated via a fee schedule, with all professional deliverables requiring the seal of a Florida registered engineer. Contractors are also subject to strict labor standards, such as the Davis-Bacon Act for construction contracts exceeding 2,000 dollars and the Contract Work Hours and Safety Standards Act for contracts over 100,000 dollars.
UTILITIES

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract for Temporary Installation and Rigging Engineering Services involves providing specialized engineering calculations and plans for temporary works on Sacramento County airport projects. The scope of work includes designing rigging and lifting procedures for suspended artwork, calculating equipment point-loading for floor distribution, and developing temporary access systems. All deliverables must consist of signed and sealed engineering plans and calculations regarding installation means and methods. To qualify for this engagement, the provider must be a Licensed Professional Engineer and utilize structural analysis software. The solicitation was posted on September 23, 2026, with a response deadline of October 15, 2026. This opportunity falls under NAICS code 541330 and is managed by the California Airports agency.

General Info

Licensed Professional Engineer providing temporary installation and rigging services for Sacramento County airports.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 41015.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SMF Pedestrian Walkway Hub - Flight Paths Public Art Installation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Airports
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Airports
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs engineering calculations and creates plans for temporary works for prime contractors on Sacramento County airport projects. Designs rigging and lifting procedures for suspended artwork, calculates equipment point-loading for floor distribution, and designs temporary access systems. Requires a Licensed Professional Engineer (PE) and structural analysis software. Delivers signed and sealed engineering plans and calculations for installation means and methods.

More opportunities from California → Airports

Same awarding agency

NAICS: 238150
SLED
SMF Pedestrian Walkway - Riparian Public Art Installation Project
Solicitation # 41016
The SMF Pedestrian Walkway Riparian Public Art Installation Project, solicitation number 41016, is an invitation for bids issued by the County of Sacramento Department of Airports. The project involves the installation of approximately 12,000 County-furnished glass rondelles to create a suspended ceiling artwork by Huameng Yu and Louis Chinn in the North Pedestrian Walkway at Sacramento International Airport. With an estimated construction cost of $210,000.00, the contract is a CUPCCAA Informal Bid requiring a single lump-sum base bid. The successful contractor must hold a California C-61/D-34 license, adhere to a strict 100% self-performance mandate prohibiting construction subcontractors, and demonstrate the completion of at least three comparable projects within the last five years. The scope of work encompasses the entire process from onsite receiving and inventory management to the final mounting of rondelle assemblies on a supporting grid, including coordination with the artists for tuning and final adjustments. Performance is subject to a 30-calendar day completion timeline and strict technical guidelines, including specific equipment loading limits to protect floor framing integrity. Bidders must submit responses via the SACCOUNTYEBIDS portal by November 19, 2026, accompanied by a bid security of at least 10 percent. The contract mandates compliance with FAA non-AIP language, Buy American preferences, prevailing wage rates, and various federal civil rights and safety regulations. Award will be granted to the lowest responsive and responsible bidder meeting all licensing, bonding, and insurance requirements.
Glass and Glazing Contractors

POSTED

15 days ago

DEADLINE

in 9 days
View Details
NAICS: 236220
SLED
Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project
Solicitation # 4722
The County of Sacramento, through its Department of Airports, is seeking a qualified Construction Manager at Risk (CMAR) for the Airfield Maintenance (AFMX) Facility project at Sacramento International Airport. The project involves the construction of a new approximately 20,000 square foot pre-engineered steel structure, along with a 3,000 square foot accessory structure, designed to centralize maintenance equipment, vehicles, materials, and administrative functions. The estimated construction budget is 18 million dollars, with a range between 17.5 million and 18.5 million dollars. The selected CMAR will be responsible for all management, labor, and materials required to complete the project, with final completion dates to be established during the preconstruction phase. Eligible firms must hold a current Class B or higher California Contractors License, be registered with the California Department of Industrial Relations, and possess experience with Guaranteed Maximum Price (GMP) contracts and public works projects. Desired experience includes working in secure public areas and operational airport settings. The selection process involves a preliminary screening of Statements of Qualifications (SOQ), followed by interviews with the top three ranked respondents. SOQs must be submitted electronically via OpenGov by December 1, 2026, at 2:00 PM PST. The contract mandates strict compliance with Federal Aviation Administration (FAA) assurances, Title VI non-discrimination statutes, and California Labor Code prevailing wage requirements. Required insurance includes general liability coverage of at least five million dollars per occurrence, and the CMAR must provide both performance and payment bonds. Project execution must adhere to the County of Sacramento Standard Construction Specifications and FAA Advisory Circular 150/5370-26 to minimize interference with air traffic. Payment will be made within 30 days of receiving a corrected invoice, with preconstruction services invoiced monthly.
Commercial and Institutional Building Construction

POSTED

about 1 month ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS