Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Temporary Security Barriers and Fencing

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Temporary Security Barriers and Fencing involves the installation and maintenance of temporary barriers to secure construction sites for prime contractors at the FAA Mike Monroney Aeronautical Center in Oklahoma City. The scope of work includes installing perimeter fencing to prevent unauthorized entry, shielding adjacent properties from damage, and providing temporary insulated weather-tight closures for exterior areas. Additionally, the contractor must install access doors equipped with self-closing hardware and locks to ensure a secure perimeter that meets FAA security requirements for restricted site access. The project is categorized under NAICS code 238990 and is managed by the Department of Transportation through 6973GH Franchise Acquisition Svcs. This opportunity is a Small Business Set Aside - Total. The solicitation was posted on November 24, 2026, with a response deadline of December 9, 2026.

General Info

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

Oklahoma City, OK, USA

Set-Aside

SBA

Documents

This scope was carved out of MRKTSVY-26-GenIDIQ.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

General Construction Services IDIQ - MMAC

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 15 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom General Construction Services IDIQ - MMAC
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and maintains temporary barriers to secure the construction site for prime contractors on FAA Mike Monroney Aeronautical Center projects. Installs perimeter fencing to prevent unauthorized entry, shields adjacent properties from damage, and provides temporary insulated weather-tight closures for exterior areas. Installs access doors with self-closing hardware and locks. Must meet FAA security requirements for restricted site access. Delivers a secure perimeter.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

NAICS: 238210
New
Federal
Electrical Construction Services IDIQ - MMAC
Solicitation # MRKTSVY-26-ElecIDIQ
The Federal Aviation Administration is conducting a market survey for an Electrical Construction Services IDIQ to support the alteration, extension, conversion, and modernization of commercial, industrial, and utility facilities at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The scope includes both existing facility upgrades and new construction, requiring contractors to provide all necessary labor, materials, and equipment. The FAA intends to award multiple contracts with a one-year base period and four one-year option periods. Task orders will range from $2,000 to $1,000,000, with an estimated total value of $18.5 million over the life of the contract. Due to urgent requirements and the need for rapid turn-around times, often under 15 days, all offerors must maintain a primary location within the state of Oklahoma. This procurement is a Small Business Set Aside - Total. The FAA is specifically encouraging interest from Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and SBA-certified Socially and Economically Disadvantaged (SEDB) contractors in the 8(a) program. Technical requirements include adherence to the National Electric Code, ADA standards, and regional seismic criteria. Contractors must provide a Quality Control Plan, as-built drawings, and electronic O&M data. Performance verification involves rigorous testing, including Optical Time Domain Reflector (OTDR) and end-to-end attenuation tests, with final acceptance contingent upon the correction of all punch list items.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 11 hours ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS