Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Oregon was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Stormwater Diversion System

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the design and installation of temporary stormwater diversion systems to ensure uninterrupted drainage during active construction projects. Work will require the use of pumps, hoses, and cofferdams to reroute stormwater flow safely and effectively, maintaining compliance with environmental and regulatory standards throughout the duration of construction. The scope demands technical expertise in hydraulic systems and on-site adaptability to varying terrain and weather conditions, with a focus on minimizing disruption to surrounding infrastructure and ecosystems. This subcontract is issued by the Engineering Department of the Port of Portland in Oregon, with a response deadline of August 27, 2026. It falls under NAICS code 238990, which classifies it as other specialty trade contractors, indicating a need for specialized civil or environmental construction services. There is no set-aside designation applied, and the place of performance is not specified beyond the state, suggesting the work may occur at multiple locations within Oregon under the Port’s jurisdiction. All proposals must be submitted by the stated deadline to be considered for award.

General Info

Design and install temporary stormwater diversion systems using pumps, hoses, and cofferdams in Oregon by August 27, 2026.

Documents

This scope was carved out of 2026-14265.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Portland International Center Basin 8 Outfall Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Engineering Department of Port of Portland
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and install temporary bypass systems using pumps, hoses, or cofferdams to maintain drainage during construction activities.

More opportunities from Oregon → Engineering Department of Port of Portland

Same awarding agency

NAICS: 238220
New
SLED
Portland International Airport Fire Protection Replacements
Solicitation # 2026-14928
The Portland International Airport Fire Protection Replacements project, solicitation 2026-14928, involves replacing pre-action sprinkler systems in the PDX terminal building utility tunnel and replacing various dry valves across the campus. The scope includes the installation of a complete automatic fire sprinkler system with zoning, layout, and standpipe outlets, as well as the provision of necessary hangers, supports, and anchors. All work must comply with NFPA 13, NFPA 25, the International Building Code, and specific Oregon Administrative Rules. Technical deliverables include shop drawings, hydraulic calculations, and seismic calculations signed by an Oregon-registered fire suppression engineer. The project must be substantially complete within 170 days of the Notice to Proceed. The contract is awarded to the low responsive bid, with a 10% bid bond requirement. Bidders must provide a resident bidder certification and disclose first-tier subcontractors. Insurance requirements include commercial general liability of at least 2,000,000 dollars and business automobile liability of at least 5,000,000 dollars per occurrence. The contractor must adhere to prevailing wage rates for public works projects over 50,000 dollars and comply with Title VI nondiscrimination authorities. Access to the performance site is restricted to personnel with PDX security badges. Final acceptance is granted by the Port within 60 days of substantial completion, following a series of check tests and acceptance surveys.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 238330
SLED
Portland International Airport Passenger Boarding Bridges Floor Replacement
Solicitation # 2026-14774
The Port of Portland is soliciting bids for the Passenger Boarding Bridges Floor Replacement project at Portland International Airport. The scope of work involves the removal and disposal of existing flooring and subflooring across 20 passenger boarding bridges of various models and one fixed walkway, replacing them with new marine-grade plywood subflooring and indoor/outdoor carpet. The project requires substantial completion within 45 days of the Notice to Proceed, with final acceptance and completion required within 90 days thereafter. A construction mock-up must be installed in a Port-selected tunnel section to establish quality and aesthetic standards. The contract will be awarded to the lowest responsive and responsible bidder, with a preference applied to resident bidders. Bids must be submitted electronically by November 18, 2026, and must include a 10 percent bid bond. The successful contractor is required to provide 100 percent performance and payment bonds, maintain commercial general liability insurance of at least 2 million dollars, and provide business automobile liability insurance of 5 million dollars per occurrence for airfield access. Compliance with the Davis-Bacon Act, state prevailing wage rates, and Title VI nondiscrimination authorities is mandatory. All project administration, including invoicing and reporting, must be conducted through the Port's online construction management system.
Flooring Contractors

POSTED

17 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS