Temporary Trailers by Austal USA in National City
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → San Diego Unified Port District
NAICS
532310 - General Rental CentersView NAICS
Place of Performance
National City, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Full Description
Show more
The proposed project would involve the temporary installation of modular trailers by Austal USA, LLC (Applicant) to support a U.S. Navy ships crew while berthed at the Austal USA facility in National City, California. The objective is to provide temporary structures adjacent to the ship in order to meet operational standards for the approximately six-month duration of the ship's stay. In lieu of operating from the ship while it is at berth, the crew would operate from the temporary trailers for the extent of the ships berth. The project is necessitated by U.S. Navy duty requirements for crew to remain on watch and in close proximity to ships while berthed. As such, the ships crew would be on duty while utilizing the trailers. The project area where the trailers would be located is an existing vacant space in the Applicants leasehold covered in asphalt. Work to specifically complete the proposed project would involve the delivery, placement, and connection of six (6) modular trailers consisting of three (3) office trailers, each measuring approximately 10 feet by 40 feet, two (2) trailers to serve as a rest space , each measuring approximately 13 feet by 53 feet, and one (1) facilities trailer measuring approximately 10 feet by 35 feet. Approximately 2 feet long ¾ inch rods would be used as anchor points for the office trailers. The rods would be pushed into the asphalt at an angle, and a strap would secure the anchor points to the office trailers.
All trailers would be equipped with internal utility systems, including lighting, HVAC, plumbing, and electrical infrastructure and would require connection to existing 240V electrical, potable water, and sewer systems available at the facility. No additional infrastructure would be needed for utility support and no trenching would be required. Mobilization equipment will include trucks for transport and hand tools to complete utility connections. The combined trailers are expected to support up to approximately 25 crew members and would remain stationary on site, with trailer operation anticipated to begin in Summer 2025. The trailers would be removed from the site following the U.S. Government ships departure, which would be after approximately six (6) months.
Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.
Similar Contracts
Same NAICS industry code
